CLIENT PROFILE:Civil engineering contractor bidding on major infrastructure projects
DEPLOYMENT TIME:8 weeks
SYSTEM:Document Intelligence Engine
SCOPE:Automated RFP analysis and scope extraction for bid preparation

KEY IMPACT

42% ↓
Bid prep time
81% ↓
Missed scope items
30% ↑
Bid capacity
$900K+

SYSTEM DEPLOYED

Document Intelligence Engine
Automated RFP analysis and scope extraction for bid preparation
Sources
  • RFP documents
  • Specifications
  • Technical drawings
Systems Integrated
  • Estimating software
  • Document management
  • Bid tracking systems
Deployment Time
8 weeks

SYSTEM ARCHITECTURE

RFP Documents → Intelligence Engine → Scope Extraction
                                        ↘ Risk Flagging → Estimating Team

THE SITUATION

A civil engineering contractor bidding on major infrastructure projects spent weeks analyzing RFPs, specifications, and drawings for each bid. Estimating teams manually extracted scope items, cross-referenced specifications across hundreds of pages, and reconciled discrepancies between drawings and written requirements. Missed scope items or misinterpreted requirements often led to unprofitable bids or costly change orders during execution.

DEPLOYMENT

Mirage deployed agents that read RFP documents, extract scope items, cross-reference specifications, and flag inconsistencies or ambiguities. The system generates structured scope summaries and highlights potential risks before estimating begins. Integration with existing estimating workflows was completed in 8 weeks.

RESULTS

Bid preparation time reduced by 42%. Missed scope items during preconstruction phase fell by 81%. Estimating team capacity increased, allowing the company to pursue 30% more opportunities without adding headcount. Change order disputes caused by scope misinterpretation during bidding decreased substantially.

YEAR 1 VALUE

Estimating labor reduction$520,000
Bid preparation acceleration$380,000
Missed scope prevention$300,000
Total Value$900K — $1.4M