Construction resources
Free tools, complete guides, and Construction Intelligence solutions, all in one place, no signup, built on official sources.
FREE TOOLS
French Construction VAT Calculator
Find the applicable French VAT rate (5.5%, 10%, or 20%) based on property type and nature of work.
French BTP Labor Cost Calculator
An estimate of the loaded hourly cost of French construction labor, from your caisse's paid-leave rate and your employer contributions.
French BTP Price Revision Calculator
The revised price on a French contract from INSEE's BT/TP indices, formula Pn = P0 × (a + b × In/I0).
French Construction Delay Penalty Calculator
The delay penalty on a French site using the CCAG Travaux default formula.
French Construction Retention Guarantee Calculator
The retention guarantee (5% cap) and its release deadline after completion.
Markup vs Margin Calculator
Convert markup to margin and back, and price a job from cost and markup or from a target margin.
AIA G702 Pay Application Calculator
Contract sum to date, retainage on work and stored materials, and the current payment due, from a G703-style schedule of values.
Construction Estimate Template (Excel)
Line items by CSI MasterFormat division, material, labor and equipment costs, your markups and the bid total.
Bid Leveling Template (Excel)
Up to four subcontractor bids on one scope: plugs with basis and source, bond and tax, leveled totals, and a ranking marked final, provisional or not decided.
RFI Template (Excel)
A request for information form and an RFI log that counts days open and flags overdue answers.
Change Order Template (Excel)
Price a change, apply overhead, profit and bond, update the contract sum, and keep a change order log.
WH-347 Certified Payroll Checker
Check a certified payroll line by line: daily hours, overtime over 40, wage determination rates and fringe, gross and net.
Davis-Bacon Wage Calculator
The basic rate, the fringe credit with annualization, overtime on the basic rate, and any weekly shortfall for one worker.
Voltage Drop Calculator
Voltage drop for single-phase and three-phase circuits, copper or aluminum, from NEC Chapter 9 Table 8 or the K method.
Bid Leveling Calculator
Three to six subcontractor bids leveled to the same scope: plugs with their source, open items carried, bond and tax added, a ranking that says if it is final or provisional, CSV export.
Submittal Log Template (Excel)
Review periods by type in calendar or working days, each resubmission tracked, latest submit date from the on-site date, late flags.
Punch List Template (Excel)
One row per deficiency with location, trade, responsible sub, due date and status, days open and a summary by trade.
Daily Construction Report Template (Excel)
Weather, manpower by trade with hours, equipment, work performed, deliveries, inspections, delays and safety, plus a manpower log.
Schedule of Values Template (Excel)
Work completed, stored materials, retainage, balance to finish and the current payment due, on a generic continuation sheet.
COMPLETE GUIDES
How to Respond to a French Construction Tender
What the DCE contains, the 2026 thresholds and deadlines for French public works contracts, and how to avoid disqualification on form.
FIDIC Red Book: A Practical Notice and Claims Administration Guide
Time limits by edition (1999 and 2017), a notice register, an event matrix, the records to keep and a worked variation.
Electrical Takeoff from 2D Drawings: Workflow, Checklist and Quality Checks
Revision and scale control, legends, counts by zone and sheet, run length assumptions, reconciliation with the BOQ and a two-level review.
Electrical Home Run Calculation: How It's Done Manually and What Can Be Automated
Routes, verticals, makeup and waste, the voltage drop, fill and derating checks that length drives, a worked example and what software can take over.
How to Integrate an AI Document Workflow with Procore
Scope, permissions, field mapping, approvals and a parallel pilot, within the limits Procore's own API documentation sets.
How to Automate an Estimating Department: A Practical Guide
Map the workflow, pick the first one, prepare closed projects and cost codes, pilot on a bid already priced, define sign-off, measure and scale.
Estimating Under Pressure: A Bid Due Tomorrow, a Takeoff Backlog, an Estimator Leaving
Triage for a bid due tomorrow, how to sort a takeoff backlog, a handover checklist for a departing estimator, and the checks a person keeps.
How to Level Subcontractor Bids
Build the scope sheet, read lump sum, unit price and alternate bids, plug exclusions and silence, add tax and bond, and level three bids in a worked example.
Comparing Drawing Revisions: Impact on Quantities, Price and Scope
How to compare two drawing sets before bid: superseded, added and missing sheets, graphic or scope changes, addenda, and an impact matrix with a worked example.
Piping Takeoff from Isometric Drawings: MTO and Spool BOM
From isometrics to an MTO by size and spec and a spool BOM with cut lengths and welds: documents, conventions, revisions, traceability, a worked example.
NRM2 Bill of Quantities: Structure, Rules and NRM1 vs NRM2
Which NRM volume applies when, what an NRM2 bill contains, defined and undefined provisional sums, coding to the cost plan and the general measurement rules.
NEC4 Compensation Events and Early Warnings: The Process
Early warnings and the register, the 21 compensation events, the 8-week time bar, quotations, assessment, deemed acceptance and the Accepted Programme.
CONSTRUCTION INTELLIGENCE SOLUTIONS
Bid Leveling
Takeoff & Estimating
Electrical Takeoff
Document Intelligence
Specification Review
Change Orders
RFI & Submittals
Progress Tracking
Plan Revision Comparison
Tender Response
Bill of Materials
Pay Applications
Golden Thread Compliance (UK)
NRM Quantity Surveying (UK)
NEC4 Contract Administration (UK)
CDM Compliance (UK)
CSI MasterFormat Extraction
Prevailing Wage Compliance
Piping Takeoff
Information Take-Off (ITO)
AI for Estimating Managers
AI for Quantity Surveyors
Mirage deploys custom AI agents for construction document analysis, specs, drawings, bid packages, pay applications. Tell us about your case.
Contact us