AI deployment for megaprojects
Data centers under construction in the US, Canada and Mexico, in 3D
- Projects
- 119
- In 3D
- 119
- Companies named
- 117
Who owns and builds each campus, its capacity and its stage, every figure linked to its source, every site in 3D; how the map is made.
119 projects on the map.
Base map: Natural Earth. Sites, buildings and power lines: OpenStreetMap contributors, ODbL. Each mark sits on its campus.Every project as text, with its capacity and its sources, below the map
All 119 campuses
The same campuses as the map above, as text: 111 in the United States, 7 in Canada, 1 in Mexico. Each name opens the campus's page, with every figure, its kind and its source. The capacity column gives the figure the campus's operator or developer publishes, and says what it measures.
| Campus | Where | Operator or developer | Capacity | Type | Stage |
|---|---|---|---|---|---|
| Aiken Data Center | Aiken, SC | Meta | 2 MW | Hyperscale, self-built | Under construction |
| Aligned DFW-03, Mansfield | Mansfield, TX | Aligned Data Centers | 1 MW | Leased hyperscale campuses | Stage not confirmed |
| Aligned DFW-04, Plano | Plano, TX | Aligned Data Centers | 44 MW | Leased hyperscale campuses | Under construction |
| Aligned IAD-04, Frederick | Frederick, MD | Aligned Data Centers | 72 MW | Leased hyperscale campuses | Under construction |
| Aligned NEO-01, Sandusky | Sandusky, OH | Aligned Data Centers | 4 MW | Leased hyperscale campuses | Stage not confirmed |
| Aligned PDX-01, Hillsboro | Hillsboro, OR | Aligned Data Centers | 108 MW | Leased hyperscale campuses | Stage not confirmed |
| Aligned Project Caprock, Abernathy | Abernathy, TX | Aligned Data Centers | 540 MW | Leased hyperscale campuses | Under construction |
| Applied Digital Polaris Forge 1, Ellendale | Ellendale, ND | Applied Digital | 250 MW IT | Leased hyperscale campuses | Under construction |
| ARK Clarksville Data Center Campus | Clarksville, AR | Serverfarm | 432 MW | Colocation | Under construction |
| Atlanta East Hyperscale Data Center Campus | Conyers, GA | DC BLOX | 154 MW | Leased hyperscale campuses | Partly in service, partly under construction |
| AWS Canton campus, Madison County | Canton, MS | Amazon Web Services | Hyperscale, self-built | Under construction | |
| Beale Infrastructure Data Center Campus | De Soto, KS | Beale Infrastructure | 4 MW | Leased hyperscale campuses | Site preparation under way |
| Beale Project Blue, Pima County | Tucson, AZ | Beale Infrastructure | 286 MW | Leased hyperscale campuses | Site preparation under way |
| Centra RNO2, Reno | Reno, NV | Centra | 4.4 MW | Leased hyperscale campuses | Under construction |
| CleanArc VA1, Caroline County | VA | CleanArc Data Centers | 900 MW power | Colocation | Under construction |
| CloudBurst Central Texas Flagship Campus | TX | CloudBurst Data Centers | 1,200 MW | Leased hyperscale campuses | Under construction |
| CloudHQ LC Campus, Ashburn | Ashburn, VA | CloudHQ | 1,256 MW IT | Leased hyperscale campuses | Under construction |
| CloudHQ ORD Campus, Mount Prospect | Mount Prospect, IL | CloudHQ | 300 MW IT | Leased hyperscale campuses | Stage not confirmed |
| Cologix ASH2, Ashburn | Ashburn, VA | Cologix | 51 MW | Colocation | Under construction |
| Colovore RNO01, Storey County | McCarran, NV | Colovore | 16 MW | Colocation | Under construction |
| Compass Goodyear campus | Goodyear, AZ | Compass Datacenters | 72 MW IT, one phase | Leased hyperscale campuses | Stage not confirmed |
| Compass Meridian campus | Meridian, MS | Compass Datacenters | 500 MW power | Leased hyperscale campuses | Partly in service, partly under construction |
| Core Scientific Denton Campus | Denton, TX | Core Scientific, City of Denton | 262 MW IT | AI and HPC campuses | Partly in service, partly under construction |
| CoreSite DE3 Denver | Denver, CO | CoreSite | 60 MW IT | Colocation | Under construction |
| CoreWeave Kenilworth (NEST 11) | Kenilworth, NJ | CoreWeave | 40 MW IT | AI and HPC campuses | Stage not confirmed |
| Corscale Gainesville Crossing | Gainesville, VA | Corscale | 326 MW | Leased hyperscale campuses | Under construction |
| CTP-02 and CTP-03 | Richmond, VA | Chirisa Technology Parks, PowerHouse Data Centers | 120 MW power | Leased hyperscale campuses | Under construction |
| CyrusOne DFW7, Fort Worth | Fort Worth, TX | CyrusOne | 70 MW IT, one phase | Colocation | Under construction |
| CyrusOne Medina County | Castroville, TX | CyrusOne | 244.3 MW | Colocation | Announced |
| CyrusOne Yorkville Technology Campus | Yorkville, IL | CyrusOne | Colocation | Site preparation under way | |
| DataBank DFW9 Red Oak | Red Oak, TX | DataBank | 480 MW IT | Colocation | Under construction |
| DataBank IAD5, Culpeper | Culpeper, VA | DataBank | 72 MW IT | Colocation | Stage not confirmed |
| EdgeConneX Bastrop campus (AUS02) | TX | EdgeConneX | 96 MW, one phase | Leased hyperscale campuses | Stage not confirmed |
| EdgeCore Ashburn Campus | Sterling, VA | EdgeCore Digital Infrastructure | 114 MW IT | Leased hyperscale campuses | Stage not confirmed |
| EdgeCore Phoenix (Mesa) Campus | Mesa, AZ | EdgeCore Digital Infrastructure | 496 MW IT | Hyperscale, self-built | Under construction |
| EdgeCore Reno Data Center Campus | NV | EdgeCore Digital Infrastructure | 216 MW IT | Hyperscale, self-built | Under construction |
| Element Critical Houston Two | Katy, TX | Element Critical | 60 MW IT | Leased hyperscale campuses | Under construction |
| Fermi America Project Matador | TX | Fermi America | 17,000 MW | Leased hyperscale campuses | Under construction |
| Flexential Atlanta-Douglasville 2 | Douglasville, GA | Flexential | 36 MW | Leased hyperscale campuses | Under construction |
| Flexential Denver-Parker | Parker, CO | Flexential | 22.5 MW | Leased hyperscale campuses | Under construction |
| Google Goodnight campus, Armstrong County | TX | Google, Crusoe | Hyperscale, self-built | Under construction | |
| Google Mesa data center | Mesa, AZ | 187 MW | Hyperscale, self-built | Stage not confirmed | |
| Google Red Oak data center | Red Oak, TX | Hyperscale, self-built | Stage not confirmed | ||
| H5 Ashburn | Ashburn, VA | H5 Data Centers | 42 MW | Colocation | Stage not confirmed |
| Helios data center campus | TX | Galaxy Digital | 526 MW IT | Leased hyperscale campuses | Partly in service, partly under construction |
| Homer City Energy Campus | Homer City, PA | Homer City Redevelopment, Amazon Data Services, Inc. | 3,200 MW | Leased hyperscale campuses | Announced |
| Hut 8 River Bend, West Feliciana Parish | St. Francisville, LA | Hut 8 | 245 MW IT, one phase | Leased hyperscale campuses | Under construction |
| Iron Mountain MIA-1, Miami | Miami, FL | Iron Mountain | 16 MW IT | Colocation | Under construction |
| Lake Mariner CB-4 | Barker, NY | TeraWulf | 102 MW IT | AI and HPC campuses | Partly in service, partly under construction |
| Leo Little Rock Campus | Little Rock, AR | AVAIO Digital | 1,070 MW power | Leased hyperscale campuses | Stage not confirmed |
| Manassas hyperscale data centers (2 x 96MW) | Manassas, VA | Digital Realty | 96 MW IT | Leased hyperscale campuses | Under construction |
| Menlo Digital MD-VA1, Herndon | Herndon, VA | Menlo Digital | 48 MW IT | Colocation | Under construction |
| Meta Beaver Dam Data Center | Beaver Dam, WI | Meta | Hyperscale, self-built | Under construction | |
| Meta Bowling Green Data Center | Bowling Green, OH | Meta | Hyperscale, self-built | Under construction | |
| Meta Cheyenne Data Center | Cheyenne, WY | Meta | Hyperscale, self-built | Under construction | |
| Meta El Paso Data Center | El Paso, TX | Meta | 1,000 MW | Hyperscale, self-built | Under construction |
| Meta Hyperion, Richland Parish | Holly Ridge, LA | Meta, Blue Owl Capital (managed funds) | 5,000 MW | Hyperscale, self-built | Under construction |
| Meta Jeffersonville Data Center | Jeffersonville, IN | Meta | 619 MW | Hyperscale, self-built | Under construction |
| Meta Lebanon Data Center | Lebanon, IN | Meta | 1,500 MW | Hyperscale, self-built | Under construction |
| Meta Montgomery Data Center | Montgomery, AL | Meta | Hyperscale, self-built | Under construction | |
| Meta Rosemount Data Center | Rosemount, MN | Meta | Hyperscale, self-built | Under construction | |
| Meta Temple Data Center | Temple, TX | Meta | Hyperscale, self-built | Opened | |
| Meta Tulsa Data Center | Tulsa, OK | 339.116 MW | Hyperscale, self-built | Under construction | |
| Microsoft Alviso datacenter | San Jose, CA | Microsoft Corporation | 2 MW | Hyperscale, self-built | Site preparation under way |
| Microsoft CHI10-11, Elk Grove Village | Elk Grove Village, IL | Microsoft Corporation | 30 MW | Leased hyperscale campuses | Stage not confirmed |
| Microsoft El Mirage campus | El Mirage, AZ | Microsoft | Leased hyperscale campuses | Stage not confirmed | |
| Microsoft Ginger East (DSM14), West Des Moines | West Des Moines, IA | Microsoft | Hyperscale, self-built | Under construction | |
| Microsoft Ginger West, West Des Moines | West Des Moines, IA | Microsoft | Hyperscale, self-built | Under construction | |
| Microsoft HR Ranch Road datacenter | Cheyenne, WY | Microsoft | Hyperscale, self-built | Under construction | |
| Microsoft La Porte datacenter | La Porte, IN | Microsoft | 489 MW | Hyperscale, self-built | Under construction |
| Microsoft Mount Pleasant, Phase 2 | Mount Pleasant, WI | Microsoft | Hyperscale, self-built | Under construction | |
| MTP Data Center Building 2 | Mililani Town, HI | Servpac | 5 MW | Leased hyperscale campuses | Under construction |
| PHX01-01 | Avondale, AZ | Prime Data Centers | 250 MW | Leased hyperscale campuses | Under construction |
| Polaris Forge 2 | Harwood, ND | Applied Digital | 280 MW | Leased hyperscale campuses | Under construction |
| Polaris Forge 3 | Center, ND | Applied Digital | 430 MW | Leased hyperscale campuses | Under construction |
| PowerHouse Arcola | Arcola, VA | PowerHouse Data Centers | 80 MW IT | Leased hyperscale campuses | Announced |
| PowerHouse Pacific | Ashburn, VA | PowerHouse Data Centers | 265 MW power | Leased hyperscale campuses | Stage not confirmed |
| PowerHouse Reno | NV | PowerHouse Data Centers, Harrison Street | 200 MW | Leased hyperscale campuses | Under construction |
| Prime DFW01-02, Dallas | Dallas, TX | Prime Data Centers | 12 MW IT | Leased hyperscale campuses | Under construction |
| Prime SMF02, Sacramento | Sacramento, CA | Prime Data Centers | 18 MW IT | Leased hyperscale campuses | Under construction |
| Project Jupiter, Santa Teresa | Santa Teresa, NM | STACK Infrastructure, BorderPlex Digital Assets | Leased hyperscale campuses | Under construction | |
| Project Phoenix | Shippingport, PA | Aligned Data Centers, Aligned.AI PA Owner | 2,000 MW | Leased hyperscale campuses | Under construction |
| QTS Ashburn 1 | Sterling, VA | QTS | 22.5 MW | Colocation | Under construction |
| QTS Cedar Rapids | Cedar Rapids, IA | QTS | 7 MW | Colocation | Under construction |
| QTS Eagle Mountain | Eagle Mountain, UT | QTS | 193 MW | Colocation | Under construction |
| QTS Fayetteville | Fayetteville, GA | QTS | Colocation | Under construction | |
| QTS Phoenix 2 | Phoenix, AZ | QTS | 210 MW | Colocation | Stage not confirmed |
| QTS York County Data Center | Rock Hill, SC | QTS | 9 MW | Colocation | Under construction |
| Related Digital Cheyenne Campus | Cheyenne, WY | Related Digital | 420 MW | Leased hyperscale campuses | Under construction |
| Related Digital The Barn, Saline Township | Saline Township, MI | Related Digital | 1,000 MW power | AI and HPC campuses | Under construction |
| Rowan Cinco, Medina County | TX | Rowan Digital Infrastructure | 300 MW | Leased hyperscale campuses | Under construction |
| Rowan Temple campus | Temple, TX | Rowan Digital Infrastructure | 300 MW | Leased hyperscale campuses | Under construction |
| Sabey SDC Ashburn, Building A | Ashburn, VA | Sabey Data Centers | 54 MW power | Leased hyperscale campuses | Under construction |
| SDC Austin Building B | Round Rock, TX | Sabey Data Centers | 84 MW IT | Leased hyperscale campuses | Under construction |
| SoftBank Stargate Lordstown | Lordstown, OH | SoftBank, Oracle | AI and HPC campuses | Stage not confirmed | |
| STACK PHX01, Avondale | Avondale, AZ | STACK Infrastructure | 225 MW | Leased hyperscale campuses | Stage not confirmed |
| Stafford Technology Campus (STC) | VA | STACK Infrastructure | 1,100 MW | Leased hyperscale campuses | Announced |
| Stream DFWB (Wilmer) | Wilmer, TX | Stream Data Centers | 90 MW | Leased hyperscale campuses | Stage not confirmed |
| Stream DFWC (Wilmer II) | Wilmer, TX | Stream Data Centers | 240 MW | Leased hyperscale campuses | Under construction |
| Stream ORDC (Chicago III) | Elk Grove Village, IL | Stream Data Centers | 40 MW | Leased hyperscale campuses | Announced |
| Stream San Antonio III (SATB1) | San Antonio, TX | Stream Data Centers | 200 MW | Leased hyperscale campuses | Opened |
| SVY01 campus expansion | San Jose, CA | STACK Infrastructure | 100 MW | Leased hyperscale campuses | Under construction |
| Switch The Keep, Lithia Springs | Atlanta, GA | Switch | 150 MW | Colocation | Stage not confirmed |
| T5 Chicago III, Northlake | Northlake, IL | T5 Data Centers | 36 MW IT | Leased hyperscale campuses | Under construction |
| TierPoint St. Louis, 2300 Locust Street | St. Louis, MO | TierPoint | 20 MW | Leased hyperscale campuses | Announced |
| Tulsa County data center campus (Project Clydesdale) | Owasso, OK | Beale Infrastructure | 506 MW | Leased hyperscale campuses | Under construction |
| Vantage AZ1, Goodyear | Goodyear, AZ | Vantage Data Centers | 176 MW IT | Leased hyperscale campuses | Under construction |
| Vantage Frontier, Shackelford County | TX | Vantage Data Centers | 1,400 MW | Leased hyperscale campuses | Under construction |
| Vantage Lighthouse, Port Washington | Port Washington, WI | Vantage Data Centers | 200 MW | AI and HPC campuses | Under construction |
| Vantage OH1, New Albany | New Albany, OH | Vantage Data Centers | 192 MW IT | Leased hyperscale campuses | Under construction |
| West Memphis Data Center | West Memphis, AR | Hyperscale, self-built | Under construction |
| Campus | Where | Operator or developer | Capacity | Type | Stage |
|---|---|---|---|---|---|
| Bell AI Fabric data centre campus | Sherwood, SK | Bell Canada | 900 MW | AI and HPC campuses | Under construction |
| Hillside AI Data Centre | Kamloops, BC | TRU Community Trust, TrueNorth Sustainable Infrastructure Inc. | 26 MW | AI and HPC campuses | Under construction |
| Meta Sturgeon County Data Center | AB | Meta | 1,600 MW | Hyperscale, self-built | Under construction |
| Microsoft Donnacona datacentre | Donnacona, QC | Microsoft | Hyperscale, self-built | Under construction | |
| Microsoft L'Ancienne-Lorette datacentre | L'Ancienne-Lorette, QC | Microsoft | Hyperscale, self-built | Under construction | |
| Microsoft Lévis datacenter | Levis, QC | Microsoft | Hyperscale, self-built | Under construction | |
| QScale Q01 campus Building B | Levis, QC | QScale, Immobilier QCMW S.E.C. | 114 MW IT | AI and HPC campuses | Under construction |
| Campus | Where | Operator or developer | Capacity | Type | Stage |
|---|---|---|---|---|---|
| ODATA DC QR03, Querétaro | Queretaro | ODATA | 300 MW IT | Leased hyperscale campuses | Partly in service, partly under construction |
About this map
The map holds the data center campuses being built in the United States, Canada and Mexico on 19 Nov 2026, from a starting list of 140 rows classed "under construction" in public directories, each row then checked against the operator's, the developer's or a government's own documents. A campus whose first buildings are in service while others are built is marked as partly in service; a row the sources show already open, or whose works no dated source confirms, says so on its page. It is a selection, not a census: a campus is on the map once its site can be drawn from OpenStreetMap.
- Operators, developers, tenants and contractors are named only where the companies or a government name them, each with its role.
- Capacity is given as published, with what it measures: IT capacity, power capacity or generation, for the campus, a phase or a building. Two kinds are never added.
- Money is given with what it is: an announced investment, a construction loan, a public incentive or a regional programme, never presented as a construction cost.
- Dates keep the precision of their source; a planned date is marked as such.
The 3D model of each campus is drawn to scale from OpenStreetMap (ODbL): the campus's land, its buildings and their mapped heights, its substations, fences and the power lines and towers around it. What no map or source gives is drawn as typical equipment and listed under the model as illustrative.
Mirage Metrics builds AI agents for the construction teams that estimate and deliver projects like these: quantities from each drawing set, changes between revisions, and bid documents checked against each other. See AI for data center contractors. This map is published as a reference and says nothing about any work by Mirage Metrics on these campuses. The infrastructure projects of Canada and the US are on the infrastructure map.
To report an error, write to mehdi@miragemetrics.com with a public source. Corrections follow the editorial policy.
Questions readers ask
From the companies and governments themselves: the operators' and developers' project pages and press releases, their filings with the SEC, the counties, cities and states that approve and tax the sites, and the utilities that power them. Every fact carries a link to its source on the campus's page. A figure found only in the press is left out, and a stage needs a dated statement of its own kind: an announced completion date that has passed is not taken as an opening.
Operators state capacity in different ways. IT capacity is the power available to the computing equipment; power capacity is what the site or its substations are built to take, which also feeds the cooling; generation is a power plant's output. The map shows each figure with what it measures and never adds one kind to another, and a campus figure is never given as a building's.
Each campus is drawn to scale from OpenStreetMap: its land, its buildings with their mapped heights, its substations, its fences and the power lines and towers around it, with the roads, water and buildings of the area. What no map or source gives is drawn as typical and listed under the model as illustrative: a hall's height where none is tagged, the rooftop plant, the generator yards, the equipment inside a substation's yard, a tower's height. A campus OpenStreetMap does not map yet is not on the map.
The map describes these campuses from public sources and says nothing about any work by Mirage Metrics on them. Mirage Metrics builds AI agents for the construction teams that estimate and deliver projects like these, and it publishes the map as a reference.
Write to mehdi@miragemetrics.com with the campus, the fact and a public source for the correction. A verified correction is made on the campus's page and its date is updated, as the editorial policy describes.