Research record, fact-checked

Microsoft Ginger West, West Des Moines

Location
West Des Moines, IA, United States. See it on the map, in 3D
Stage
Under construction, as of November 2026 (Microsoft). Microsoft's own construction-update page for Ginger West names a general contractor and gives a summer 2028 completion estimate, framing the project as currently under construction.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
OwnerMicrosoft
TypeHyperscale, self-builtMicrosoft
AmountNot found in the sources consulted
Sourced facts of the campus

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
MicrosoftOwnerMicrosoft
Turner ConstructionGeneral contractorMicrosoft
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
2028 (planned)Construction estimated to be completed by summer 2028.Microsoft
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Microsoft is building the Ginger West datacenter in greater West Des Moines, Iowa, with Turner Construction as general contractor and completion estimated for summer 2028, per Microsoft's own construction update. It is a distinct project from Ginger East and Project Osmium.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.