Microsoft Ginger West, West Des Moines
- Location
- West Des Moines, IA, United States. See it on the map, in 3D
- Stage
- Under construction, as of November 2026 (Microsoft). Microsoft's own construction-update page for Ginger West names a general contractor and gives a summer 2028 completion estimate, framing the project as currently under construction.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | Microsoft | |
| Type | Hyperscale, self-built | Microsoft |
| Amount | Not found in the sources consulted |
Milestones
| Date | Milestone | Source |
|---|---|---|
| 2028 (planned) | Construction estimated to be completed by summer 2028. | Microsoft |
About the campus
Microsoft is building the Ginger West datacenter in greater West Des Moines, Iowa, with Turner Construction as general contractor and completion estimated for summer 2028, per Microsoft's own construction update. It is a distinct project from Ginger East and Project Osmium.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Ginger West datacenter construction update, Microsoft. Consulted 19 Nov 2026.