Hillside AI Data Centre

Location
Kamloops, BC, Canada. Site address: 1452 McGill Road, Kamloops, British Columbia. See it on the map, in 3D
Stage
Under construction, as of November 2026 (TrueNorth Sustainable Infrastructure Inc.). TrueNorth's project page reports the first phase structure complete with tenant fit-out under way and the second phase under construction.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
Owners and developersTRU Community Trust, TrueNorth Sustainable Infrastructure Inc.
TypeAI and HPC campusesTRU Community Trust
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
26 MWCapacity, its measure not stated by the sourceWhole campusTrueNorth Sustainable Infrastructure Inc.
13 MWCapacity, its measure not stated by the sourceOne phaseTrueNorth Sustainable Infrastructure Inc.
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Floor areaAbout 2,800 m2One buildingTRU Community Trust
CoolingClosed-loop cooling systems that minimize water useOne buildingTRU Community Trust
Floor areaMore than 37,000 sq ftOne buildingTrueNorth Sustainable Infrastructure Inc.
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
TRU Community TrustOwnerLand trust affiliated with Thompson Rivers University; owns the siteTRU Community Trust
TrueNorth Sustainable Infrastructure Inc.DeveloperThompson Rivers University
Bell CanadaTenantThe facility will join Bell's Bell AI Fabric platformTRU Community Trust
TrueNorth Sustainable Infrastructure Inc.General contractorTrueNorth develops and builds its own data centres, with single-point responsibility for design, procurement and construction; its projects page lists the Hillside Data Centre.TrueNorth Sustainable Infrastructure Inc.
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
February 2026TrueNorth Sustainable Infrastructure Inc.
April 9, 2026TrueNorth Sustainable Infrastructure officially begins constructionTRU Community Trust
2027 (planned)Anticipated completion in late 2027Thompson Rivers University
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

TrueNorth Sustainable Infrastructure is building the Hillside AI Data Centre at 1452 McGill Road in Kamloops, British Columbia, on land held by TRU Community Trust, for Bell Canada's Bell AI Fabric. TrueNorth describes a 26 MW facility of more than 37,000 square feet in two 13 MW phases; construction started in February 2026, the first phase structure is complete with tenant fit-out under way, and completion is expected in late 2027.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.