Research record, fact-checked
Hillside AI Data Centre
- Location
- Kamloops, BC, Canada. Site address: 1452 McGill Road, Kamloops, British Columbia. See it on the map, in 3D
- Stage
- Under construction, as of November 2026 (TrueNorth Sustainable Infrastructure Inc.). TrueNorth's project page reports the first phase structure complete with tenant fit-out under way and the second phase under construction.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owners and developers | TRU Community Trust, TrueNorth Sustainable Infrastructure Inc. | |
| Type | AI and HPC campuses | TRU Community Trust |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 26 MW | Capacity, its measure not stated by the source | Whole campus | TrueNorth Sustainable Infrastructure Inc. | |
| 13 MW | Capacity, its measure not stated by the source | One phase | TrueNorth Sustainable Infrastructure Inc. |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area | About 2,800 m2 | One building | TRU Community Trust |
| Cooling | Closed-loop cooling systems that minimize water use | One building | TRU Community Trust |
| Floor area | More than 37,000 sq ft | One building | TrueNorth Sustainable Infrastructure Inc. |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| TRU Community Trust | Owner | Land trust affiliated with Thompson Rivers University; owns the site | TRU Community Trust |
| TrueNorth Sustainable Infrastructure Inc. | Developer | Thompson Rivers University | |
| Bell Canada | Tenant | The facility will join Bell's Bell AI Fabric platform | TRU Community Trust |
| TrueNorth Sustainable Infrastructure Inc. | General contractor | TrueNorth develops and builds its own data centres, with single-point responsibility for design, procurement and construction; its projects page lists the Hillside Data Centre. | TrueNorth Sustainable Infrastructure Inc. |
Milestones
| Date | Milestone | Source |
|---|---|---|
| February 2026 | TrueNorth Sustainable Infrastructure Inc. | |
| April 9, 2026 | TrueNorth Sustainable Infrastructure officially begins construction | TRU Community Trust |
| 2027 (planned) | Anticipated completion in late 2027 | Thompson Rivers University |
About the campus
TrueNorth Sustainable Infrastructure is building the Hillside AI Data Centre at 1452 McGill Road in Kamloops, British Columbia, on land held by TRU Community Trust, for Bell Canada's Bell AI Fabric. TrueNorth describes a 26 MW facility of more than 37,000 square feet in two 13 MW phases; construction started in February 2026, the first phase structure is complete with tenant fit-out under way, and completion is expected in late 2027.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- TRU Community Trust advances data centre development, Thompson Rivers University, 9 Apr 2026. Consulted 19 Nov 2026.
- AI Data Centre, TRU Community Trust. Consulted 19 Nov 2026.
- Hillside Data Centre, TrueNorth Sustainable Infrastructure Inc.. Consulted 20 Nov 2026.
- Projects, TrueNorth Sustainable Infrastructure Inc.. Consulted 20 Nov 2026.