Aiken Data Center
- Location
- Aiken, Aiken County, SC, United States. See it on the map, in 3D
- Stage
- Under construction, as of 2024 (Meta). Meta's own current site list gives 2024 as the break ground year for Aiken.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | Meta | |
| Type | Hyperscale, self-built | Meta |
| Headline amount | More than US$800 million (US dollars), as of 2026 | Meta |
| What it covers | Announced investment, lower bound: Stated as a minimum (over 800 million dollars). Not to be read as a construction cost. |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| More than US$800 M | Announced investment | Whole campus | 2026 | MetaStated as a minimum (over 800 million dollars). |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings, in all | 2 | Whole campus | DPR Construction |
| Floor area of one building | About 750,000 sq ft | One building | DPR Construction |
| Stories | 1 | One building | DPR Construction |
| Site area | More than 300 acres | Whole campus | DPR Construction |
| Floor area | 715,000 sq ft | Whole campus | South Carolina Department of Commerce |
| Cooling | Closed-loop, liquid cooled system that will use zero operational water | Whole campus | Meta |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Meta | Owner | Meta | |
| DPR Construction | General contractor | DPR lists the Meta Aiken Data Center among its own projects, with Meta Platforms as client, and names its campus lead in Aiken. | DPR Construction |
| Aiken Electric Cooperative | Energy partner | Meta | |
| Breezy Hill Water & Sewer Co. | Energy partner | water and wastewater service | Meta |
Milestones
| Date | Milestone | Source |
|---|---|---|
| 2024 | Meta broke ground on the Aiken data center. | Meta |
| August 29, 2024 | South Carolina Department of Commerce | |
| undefined 2027 | South Carolina Department of Commerce |
About the campus
Meta's Aiken Data Center is in the Sage Mill Industrial Park in Aiken County, South Carolina, announced on August 29, 2024 as an investment of more than 800 million dollars. DPR Construction, which lists the project among its own, describes two single-story buildings of about 750,000 square feet each on a site of more than 300 acres. Meta expects more than 1,200 skilled trade workers on site at peak construction and a closed-loop liquid cooling system that uses no operational water.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- United States - Meta Data Centers, Meta. Consulted 19 Nov 2026.
- Meta Aiken Data Center, DPR Construction. Consulted 20 Nov 2026.
- Meta Aiken Data Center (fact sheet), Meta. Consulted 20 Nov 2026.
- Meta selects Aiken County for first South Carolina data center, South Carolina Department of Commerce, 29 Aug 2024. Consulted 20 Nov 2026.
- Aiken County Public GIS, Parcels layer (MapServer/13), Aiken County GeoServices. Consulted 20 Nov 2026.