Vantage AZ1, Goodyear
- Location
- Goodyear, Maricopa County, AZ, United States. Site address: 45 S Bullard Avenue, Goodyear, AZ, 85338, USA. See it on the map, in 3D
- Stage
- Under construction, as of July 2023 (Vantage Data Centers). Vantage's own announcement of a topping out on Phase II of the campus
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Vantage Data Centers | |
| Type | Leased hyperscale campuses | |
| Headline amount | More than US$1.5 billion (US dollars), as of July 2023 | Vantage Data Centers |
| What it covers | Announced investment, lower bound. Not to be read as a construction cost. |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 176 MW, planned | IT capacity (power for the computing equipment) | Whole campus | July 2023 | Vantage Data Centers |
| 160 MW | Capacity, its measure not stated by the source | Whole campus | Vantage Data Centers |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| More than US$1.5 bn | Announced investment | Whole campus | July 2023 | Vantage Data Centers |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area | More than 1,000,000 sq ft | Whole campus | Vantage Data Centers |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Vantage Data Centers | Developer | Vantage Data Centers | |
| McCarthy Building Companies | General contractor | Vantage Data Centers | |
| Corgan Architects | Design | Phase II | Vantage Data Centers |
| Rosendin Electric | Trade contractor | electrical; Phase II; Named among the design and trade partners. | Vantage Data Centers |
| Southland Industries | Trade contractor | not stated (trade partner); Phase II; Named among the design and trade partners. | Vantage Data Centers |
| Amfab Steel | Trade contractor | steel; Phase II; Named among the design and trade partners. | Vantage Data Centers |
Milestones
| Date | Milestone | Source |
|---|---|---|
| July 2023 | Topping out of Phase II construction | Vantage Data Centers |
| March 2024 (planned) | Phase II scheduled to be operational in spring 2024 | Vantage Data Centers |
| undefined 2024 | Phase II scheduled to be operational | Vantage Data Centers |
About the campus
AZ1 is a Vantage Data Centers campus in Goodyear, Arizona at 45 S Bullard Avenue. A 2023 Vantage announcement described the campus as 176MW of IT capacity across three facilities with more than 1 million square feet and a $1.5 billion-plus investment, marking the topping out of Phase II construction. The operator's current location page describes the campus as a 160MW mega-scale campus and references the topping out of the first data center on the Phoenix campus.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Vantage Data Centers and McCarthy Building Companies Celebrate Topping Out of Construction on Phase II of Major Data Center Project in Goodyear, Ariz., Vantage Data Centers, 7 Jul 2023. Consulted 19 Nov 2026.
- Phoenix, Arizona Data Center Campus (location page), Vantage Data Centers. Consulted 19 Nov 2026.