Related Digital The Barn, Saline Township
- Location
- Saline Township, Washtenaw County, MI, United States. See it on the map, in 3D
- Stage
- Under construction, as of April 24, 2026 (Related Digital). Related Digital's own April 24, 2026 financing announcement, corroborated by general contractor Walbridge's own press release describing construction begun in 2026 with over 200,000 union trade hours logged.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Related Digital | |
| Type | AI and HPC campuses | Related Digital |
| Headline amount | US$16 billion (US dollars), as of April 2026 | Related Digital |
| What it covers | Announced investment: Financed with equity from Related Digital and Blackstone-affiliated funds plus long-term debt anchored by PIMCO-managed funds and accounts; the financing amount itself is not stated as a separate number from the $16 billion campus figure. Not to be read as a construction cost. |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| More than 1,000 MW, planned | Power capacity of the site or its substations | Whole campus | October 2025 | Related Digital |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$16 bn | Announced investment | Whole campus | April 2026 | Related DigitalFinanced with equity from Related Digital and Blackstone-affiliated funds plus long-term debt anchored by PIMCO-managed funds and accounts; the financing amount itself is not stated as a separate number from the $16 billion campus figure. |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Site area | 250 acres | Whole campus | Walbridge |
| Cooling | Closed-loop cooling systems limiting daily water use to levels comparable to a standard office building | Whole campus | Walbridge |
| Buildings, in all | 3 | Whole campus | Related Digital |
| Floor area of one building | 550,000 sq ft | One building | Related Digital |
| Stories | 1 | One building | Related Digital |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Related Digital | Developer | Related Digital | |
| Oracle | Tenant | Related Digital | |
| OpenAI | Tenant | Receives cloud capacity from Oracle on this site, as part of the Stargate partnership | Related Digital |
| Blackstone | Financing | Equity, through affiliated funds | Related Digital |
| PIMCO | Financing | Long-term debt, through managed funds and accounts | Related Digital |
| Walbridge | General contractor | Walbridge | |
| Motor City Electric | Trade contractor | Local trade partner named by Walbridge. | Walbridge |
| Progressive Mechanical Inc. (PMI) | Trade contractor | Local trade partner named by Walbridge. | Walbridge |
| John E. Green | Trade contractor | Local trade partner named by Walbridge. | Walbridge |
| Shaw / E-J Electric | Trade contractor | Local trade partner named by Walbridge. | Walbridge |
| Superior Electric Great Lakes (SEGLC) | Trade contractor | Local trade partner named by Walbridge. | Walbridge |
| Triangle Electric | Trade contractor | Local trade partner named by Walbridge. | Walbridge |
| Universal Piping Industries (UPI) | Trade contractor | Local trade partner named by Walbridge. | Walbridge |
| Kais-Air | Trade contractor | mechanical and electrical skid assemblies; hot aisle containment | Walbridge |
| DTE Energy | Energy partner | Related Digital |
Milestones
| Date | Milestone | Source |
|---|---|---|
| October 30, 2025 (planned) | OpenAI, Oracle and Related Digital announce the Stargate Michigan site | Related Digital |
| April 24, 2026 | Construction on the first data center buildings is underway and on schedule | Related Digital |
About the campus
Related Digital is building The Barn, a 250-acre, gigawatt-scale data centre campus in Saline Township, Michigan, purpose-built for Oracle as part of the OpenAI-Oracle Stargate partnership. Announced on October 30, 2025, the $16 billion campus is financed with equity from Related Digital and Blackstone-affiliated funds and debt anchored by PIMCO-managed funds, announced April 24, 2026, when Related Digital said major construction was well underway. General contractor Walbridge reports construction began in 2026, with more than 200,000 union trade hours logged and closed-loop cooling systems that keep daily water use comparable to a standard office building.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Financing press release, Related Digital, 24 Apr 2026. Consulted 19 Nov 2026.
- OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan, Related Digital, 30 Oct 2025. Consulted 19 Nov 2026.
- Walbridge Is Building the Largest Project in Its 110-Year History, Right Here in Michigan, Walbridge, 2026. Consulted 19 Nov 2026.
- Walbridge Is Building the Largest Project in Its 110-Year History, Right Here in Michigan, Walbridge, 5 May 2026. Consulted 20 Nov 2026.
- OpenAI, Oracle, and Related Digital Announce Stargate Data Center Site in Michigan, Related Digital, 30 Oct 2025. Consulted 20 Nov 2026.