Research record, fact-checked

Meta Hyperion, Richland Parish

Location
Holly Ridge, Richland Parish, LA, United States. See it on the map, in 3D
Stage
Under construction, as of July 2026 (Meta). Meta described active expansion of an already building campus, with groundbreaking reported in December 2024.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
Joint venture partnersMeta, Blue Owl Capital (managed funds)
TypeHyperscale, self-builtMeta
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
5,000 MW, plannedCapacity, its measure not stated by the sourceWhole campusJuly 2026Meta
Capacity figures, each with what it measures

Investment and financing

An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
More than US$50 bnAnnounced investment in the regionWhole campusJuly 2026MetaRegional investment figure covering infrastructure, workforce training and the energy agreement, not a verified building cost.
About US$27 bnFinancingWhole campusOctober 2025MetaTotal development cost committed by the Meta and Blue Owl joint venture.
Amounts, each with its kind and scope

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Coolingclosed-loop system circulating a glycol mixture through the data halls, using zero water for a majority of the yearWhole campusMeta
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
MetaJoint venture partnerOwns 20 percent of the joint venture developing the campus.Meta
MetaTenantMeta leases the campus from the joint venture once construction is complete.Meta
Blue Owl Capital (managed funds)Joint venture partnerOwns 80 percent of the joint venture developing the campus.Meta
DPR ConstructionGeneral contractorMeta
Turner Construction CompanyGeneral contractorMeta
Mortenson ConstructionGeneral contractorMeta
Entergy LouisianaEnergy partnerMeta
City of DelhiEnergy partnerwater and wastewater utility upgrades and a new industrial wastewater treatment plantMeta
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
December 2024Groundbreaking on the Richland Parish data center.Meta
October 21, 2025Meta and funds managed by Blue Owl Capital announced a joint venture to develop the Hyperion campus.Meta
July 2026Meta announced an expansion of the campus to 5 GW.Meta
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Meta's Hyperion data center campus near Holly Ridge in Richland Parish, Louisiana broke ground in December 2024 and is being expanded to 5 GW of compute capacity as of July 2026. Meta and funds managed by Blue Owl Capital formed a joint venture in October 2025, with Blue Owl funds owning 80 percent and Meta 20 percent, committing about 27 billion dollars in development costs; Meta leases the completed campus. A further regional investment of more than 50 billion dollars was announced in July 2026, covering infrastructure and an energy agreement with Entergy Louisiana.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.