Meta Lebanon Data Center
- Location
- Lebanon, IN, United States. Site address: 3602 W State Rd 32, Lebanon, Indiana (situs of the two data center development parcels in the Boone County parcel records). See it on the map, in 3D
- Stage
- Under construction, as of 2026 (Meta). Meta's own current site list gives 2026 as the break ground year for the Lebanon, Indiana data center.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| More than US$10 bn | Announced investment | Whole campus | February 2026 | Meta |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area of one building | About 4,000,000 sq ft | Whole campus | Meta |
| Floor area | About 4,000,000 sq ft | Whole campus | Meta |
| Cooling | Closed-loop, liquid cooled system using zero water for the majority of the year | Whole campus | Meta |
| Site area | 1,500 acres | Whole campus | Faith Technologies |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Meta | Owner | Meta | |
| Mortenson | General contractor | One of the three general contractors Meta refers to on the project's construction website. | Lebanon Data Center (general contractors' project site) |
| Turner Construction Company | General contractor | Lebanon Data Center (general contractors' project site) | |
| Faith Technologies | General contractor | Lebanon Data Center (general contractors' project site) | |
| Wabash Valley Power Alliance | Energy partner | Meta | |
| Boone Power | Energy partner | Meta | |
| City of Lebanon | Energy partner | water and wastewater service | Meta |
Milestones
| Date | Milestone | Source |
|---|---|---|
| 2026 | Meta's site list gives 2026 as the break ground year. | Meta |
| February 11, 2026 | Meta announced the Lebanon, Indiana data center campus. | Meta |
About the campus
Meta announced a data center campus in Lebanon, Indiana in February 2026, its second in the state, projected to represent an investment of more than 10 billion dollars and span roughly 4 million square feet. Meta's own current site list gives 2026 as the year ground was broken. The project is expected to support approximately 4,000 construction jobs at peak and more than 300 operational jobs.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- United States - Meta Data Centers, Meta. Consulted 19 Nov 2026.
- Lebanon Data Center, Lebanon Data Center (general contractors' project site). Consulted 20 Nov 2026.
- Meta Lebanon Data Center (fact sheet), Meta. Consulted 20 Nov 2026.
- Hello, Lebanon! - Meta Data Centers, Meta, 11 Feb 2026. Consulted 19 Nov 2026.
- Hello, Lebanon! - Meta Data Centers, Meta, 11 Feb 2026. Consulted 20 Nov 2026.
- Lebanon (Faith Technologies project page), Faith Technologies. Consulted 20 Nov 2026.
- Boone_County_Parcel, PARCELS (layer 1), query by owner ORLA LLC, Boone County, Indiana GIS (ArcGIS Online, account johnn_BooneIN). Consulted 20 Nov 2026.