- Ellendale, ND, United States. See it on the map, in 3D
- Stage
- Under construction, as of October 2026 (Applied Digital). Applied Digital's fiscal Q1 2027 results, covering the quarter ended August 31, 2026 and issued October 7, 2026, report the campus's first two buildings delivered and the third still building.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | Applied Digital | |
| Type | Leased hyperscale campuses | Applied Digital |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 150 MW, planned | IT capacity (power for the computing equipment) | One building, Building 3 | August 2025 | Applied Digital |
| 250 MW, delivered | IT capacity (power for the computing equipment) | Whole campus | October 2026 | Applied Digital |
| 150 MW | IT capacity (power for the computing equipment) | One building | Applied Digital |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings delivered | 2 | Whole campus | Applied Digital |
| Buildings under construction | 1 | Whole campus | Applied Digital |
| Buildings, in all | 3 | Whole campus | McGough |
| Floor area | 2,250,000 sq ft | Whole campus | McGough |
| Floor area of one building | 369,000 sq ft | One building | McGough |
| Stories | 3 | One building | McGough |
| Generators | Four standalone generator buildings of 80,000 sq ft in all, serving the first building | One building | McGough |
| Floor area of one building | 940,000 sq ft | One building | McGough |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Applied Digital | Owner | Applied Digital | |
| CoreWeave | Tenant | Applied Digital | |
| Goldman Sachs Bank USA | Financing | administrative and collateral agent of the ELN-04 bridge loan facility, repaid from the notes | Applied Digital |
| McGough | General contractor | McGough's portfolio page for Applied Digital Polaris Forge 1 lists the delivery method as CMAR (construction manager at risk). | McGough |
Milestones
| Date | Milestone | Source |
|---|---|---|
| August 2025 | Applied Digital finalized an additional 150 MW CoreWeave lease for Polaris Forge 1's third building. | Applied Digital |
| October 2025 | The first 100 MW building at Polaris Forge 1 became operational. | Applied Digital |
| October 2026 | Building 2 (150 MW) was fully delivered in two phases, bringing live campus capacity to 250 MW. | Applied Digital |
About the campus
Polaris Forge 1 in Ellendale, North Dakota is Applied Digital's campus leased to CoreWeave, engineered to scale up to 1 gigawatt. Its first two buildings, 100 MW and 150 MW, are operational, bringing live capacity to 250 MW as of October 2026, while the third building, an additional 150 MW leased in August 2025, remains under construction toward a 2027 service date.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Applied Digital Reports Fiscal First Quarter 2027 Results, Applied Digital, 7 Oct 2026. Consulted 19 Nov 2026.
- Applied Digital Finalizes Additional 150MW Lease with CoreWeave in North Dakota, Applied Digital, 29 Aug 2025. Consulted 19 Nov 2026.
- Applied Digital Announces Pricing of $1.59 Billion of Senior Secured Notes to fund the Fourth Building at Polaris Forge 1, Applied Digital, 9 Jun 2026. Consulted 20 Nov 2026.
- Applied Digital Reports Fiscal First Quarter 2027 Results, Applied Digital, 7 Oct 2026. Consulted 20 Nov 2026.
- Applied Digital Polaris Forge 1 (portfolio), McGough. Consulted 20 Nov 2026.