Research record, fact-checked

Bell AI Fabric data centre campus

Location
Sherwood, Rural Municipality of Sherwood, SK, Canada. See it on the map, in 3D
Stage
Under construction, as of October 1, 2026 (Government of Saskatchewan). Government of Saskatchewan construction update of October 1, 2026 reports all four first-phase buildings underway and more than 500 people on site.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
OwnerBell Canada
TypeAI and HPC campusesGovernment of Saskatchewan
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
300 MW, plannedCapacity, its measure not stated by the sourceWhole campus, Phase 1May 2026Bird Construction
Up to 900 MW, plannedCapacity, its measure not stated by the sourceWhole campus, Announced expansion (separate from Phase 1)September 2026BCE Inc.
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all4One phaseGovernment of Saskatchewan
Site areaAbout 64.5 haWhole campusRM of Sherwood No. 159 (executive summary filed by Fusion)
Coolingadvanced air-cooled, closed-loop chilling technologyWhole campusRM of Sherwood No. 159 (executive summary filed by Fusion)
Substation capacitya private SaskPower-linked electrical substation, and a future natural gas plant in an energy generation zone to the westWhole campusRM of Sherwood No. 159 (executive summary filed by Fusion)
Buildings, in allconcept plan: four data centre buildings (Phase 1 to Phase 4) around a central administration building, with two further 'Future Phase' pads to the eastWhole campusRM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.)
Floor area of one building24,968 sq ftOne buildingRM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.)
Site area3.83 acresOne buildingRM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.)
On-site generationrenewable energy system area of 30 acres and a future gas plant expansion area of 6.08 acres on the concept planWhole campusRM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.)
Generatorsgenerator yards drawn along the data centre buildings (labelled GENERATORS) with chiller yards (CHILLERS)Whole campusRM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.)
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
Bell CanadaOwnerBell AI Fabric is Bell's own platformGovernment of Saskatchewan
Bird ConstructionGeneral contractorLead construction partnerBird Construction
Dynamo ElectricSite preparationBuilding the high-voltage substationGovernment of Saskatchewan
Prairie SteelGeneral contractorManufacturing the pre-engineered building systemsGovernment of Saskatchewan
George Gordon Developments Ltd.Site preparationSite fencing, security, fuel, logistics and support servicesGovernment of Saskatchewan
Alton Tangedal Architect Ltd.DesignArchitect of recordBird Construction
Hipperson ConstructionSite preparationearly phases of constructionBird Construction
Dynamo ElectricTrade contractorelectrical: high-voltage substationGovernment of Saskatchewan
Prairie SteelTrade contractorsteel: pre-engineered building systems (manufacture)Government of Saskatchewan
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
September 2026 (planned)Bell announces a further expansion of up to 900 MW, for a 1.2 GW totalBCE Inc.
October 1, 2026Four first-phase buildings underway, more than 500 workers on siteGovernment of Saskatchewan
2027 (planned)First data hall targeted to come online in the first half of 2027Government of Saskatchewan
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Bell Canada is building the first 300 MW phase of its Bell AI Fabric data centre campus in the Rural Municipality of Sherwood, near Regina, Saskatchewan. A government construction update of October 1, 2026 reported all four first-phase buildings underway with more than 500 workers on site, Bird Construction as lead contractor, and the first data hall on track for the first half of 2027. Bell separately announced a path to a further 900 MW of capacity, for a 1.2 GW total, as an expansion distinct from the 300 MW first phase.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources