Bell AI Fabric data centre campus
- Location
- Sherwood, Rural Municipality of Sherwood, SK, Canada. See it on the map, in 3D
- Stage
- Under construction, as of October 1, 2026 (Government of Saskatchewan). Government of Saskatchewan construction update of October 1, 2026 reports all four first-phase buildings underway and more than 500 people on site.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | Bell Canada | |
| Type | AI and HPC campuses | Government of Saskatchewan |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 300 MW, planned | Capacity, its measure not stated by the source | Whole campus, Phase 1 | May 2026 | Bird Construction |
| Up to 900 MW, planned | Capacity, its measure not stated by the source | Whole campus, Announced expansion (separate from Phase 1) | September 2026 | BCE Inc. |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings, in all | 4 | One phase | Government of Saskatchewan |
| Site area | About 64.5 ha | Whole campus | RM of Sherwood No. 159 (executive summary filed by Fusion) |
| Cooling | advanced air-cooled, closed-loop chilling technology | Whole campus | RM of Sherwood No. 159 (executive summary filed by Fusion) |
| Substation capacity | a private SaskPower-linked electrical substation, and a future natural gas plant in an energy generation zone to the west | Whole campus | RM of Sherwood No. 159 (executive summary filed by Fusion) |
| Buildings, in all | concept plan: four data centre buildings (Phase 1 to Phase 4) around a central administration building, with two further 'Future Phase' pads to the east | Whole campus | RM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.) |
| Floor area of one building | 24,968 sq ft | One building | RM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.) |
| Site area | 3.83 acres | One building | RM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.) |
| On-site generation | renewable energy system area of 30 acres and a future gas plant expansion area of 6.08 acres on the concept plan | Whole campus | RM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.) |
| Generators | generator yards drawn along the data centre buildings (labelled GENERATORS) with chiller yards (CHILLERS) | Whole campus | RM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.) |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Bell Canada | Owner | Bell AI Fabric is Bell's own platform | Government of Saskatchewan |
| Bird Construction | General contractor | Lead construction partner | Bird Construction |
| Dynamo Electric | Site preparation | Building the high-voltage substation | Government of Saskatchewan |
| Prairie Steel | General contractor | Manufacturing the pre-engineered building systems | Government of Saskatchewan |
| George Gordon Developments Ltd. | Site preparation | Site fencing, security, fuel, logistics and support services | Government of Saskatchewan |
| Alton Tangedal Architect Ltd. | Design | Architect of record | Bird Construction |
| Hipperson Construction | Site preparation | early phases of construction | Bird Construction |
| Dynamo Electric | Trade contractor | electrical: high-voltage substation | Government of Saskatchewan |
| Prairie Steel | Trade contractor | steel: pre-engineered building systems (manufacture) | Government of Saskatchewan |
Milestones
| Date | Milestone | Source |
|---|---|---|
| September 2026 (planned) | Bell announces a further expansion of up to 900 MW, for a 1.2 GW total | BCE Inc. |
| October 1, 2026 | Four first-phase buildings underway, more than 500 workers on site | Government of Saskatchewan |
| 2027 (planned) | First data hall targeted to come online in the first half of 2027 | Government of Saskatchewan |
About the campus
Bell Canada is building the first 300 MW phase of its Bell AI Fabric data centre campus in the Rural Municipality of Sherwood, near Regina, Saskatchewan. A government construction update of October 1, 2026 reported all four first-phase buildings underway with more than 500 workers on site, Bird Construction as lead contractor, and the first data hall on track for the first half of 2027. Bell separately announced a path to a further 900 MW of capacity, for a 1.2 GW total, as an expansion distinct from the 300 MW first phase.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Bell AI Fabric Provides Construction Update in Saskatchewan, Announces $1 Million Mental Health Commitment, Government of Saskatchewan, 1 Oct 2026. Consulted 19 Nov 2026.
- Bell names construction partners for 300 MW Saskatchewan AI Fabric facility and announces long-term partnership with Bird Construction, Bird Construction, 14 May 2026. Consulted 19 Nov 2026.
- Bell AI Fabric to expand nation-building project in Saskatchewan with up to 900 MW of additional power, BCE Inc., 14 Sep 2026. Consulted 19 Nov 2026.
- Bell names construction partners for 300 MW Saskatchewan AI Fabric facility and announces long-term partnership with Bird Construction, Bird Construction, 14 May 2026. Consulted 20 Nov 2026.
- Bell AI Fabric Provides Construction Update in Saskatchewan, Announces $1 Million Mental Health Commitment, Government of Saskatchewan, 1 Oct 2026. Consulted 20 Nov 2026.
- Sherwood Data Centre, Executive Summary, RM of Sherwood No. 159 (executive summary filed by Fusion), 1 Apr 2026. Consulted 20 Nov 2026.
- Sherwood Data Center, A000 Overall Site Plan (Concept), RM of Sherwood No. 159 (concept site plan filed with DP 26-005, title block TrueNorth Sustainable Infrastructure Inc.), 26 Mar 2026. Consulted 20 Nov 2026.
- Advanced Notification of Development Agreement for DP 26-005, Proposed Data Centre at NW 33-16-19 W2M, RM of Sherwood No. 159, 2 Apr 2026. Consulted 20 Nov 2026.