Centra RNO2, Reno

Location
Reno, NV, United States. Site address: 265 Keystone Ave, Reno, NV 89503, USA. See it on the map, in 3D
Stage
Under construction, as of July 2026 (City of Reno). The City of Reno's FAQ, updated in July 2026, describes concrete pours in May and June 2026 and the final soils and compaction letter approved in June 2026.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperCentra
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
4.4 MW, plannedCapacity, its measure not stated by the sourceOne building2026Centra
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Floor area of one building230,000 sq ftOne buildingCentra
Site area3.26 acresWhole campusCity of Reno Planning Commission
Stories2One buildingCentra
Waterabout 2 acre-feet of waterOne buildingCity of Reno
CoolingRooftop chillers behind a 15-foot acoustically absorptive barrierOne buildingCity of Reno
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
CentraDeveloperCentra
Clark ConstructionGeneral contractorNamed by the City of Reno as the contractor granted extended hours for the concrete pours.City of Reno
ENGEODesignPrepared the geotechnical report.City of Reno
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
January 15, 2025Conditional use permit approved by the Reno Planning CommissionCity of Reno
September 11, 2025Geotechnical report approved by the City, before the original building permitCity of Reno
October 15, 2025Site preparation for foundation pouring was underway.Centra
November 18, 2025Centra announced groundbreaking on RNO2.Centra
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Centra's RNO2 data center is under construction at 265 Keystone Ave in Reno, Nevada, on a site of about 3.26 acres approved for a conditional use permit by the Reno Planning Commission on January 15, 2025. Centra describes a two-story precast building targeting 4.4 MW in the fourth quarter of 2026. The City of Reno names Clark Construction as the contractor that poured concrete in May and June 2026.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.