Research record, fact-checked
Stream ORDC (Chicago III)
- Location
- Elk Grove Village, Cook County, IL, United States. Site address: 2000 Landmeier Rd, Elk Grove Village, Illinois 60007. See it on the map, in 3D
- Stage
- Announced, as of November 19, 2026 (Stream Data Centers). Stream's own location page lists ORDC as 'In Development' / 'Coming Soon', with no groundbreaking or under-construction statement for building one.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Stream Data Centers | |
| Type | Leased hyperscale campuses | Stream Data Centers |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 40 MW, planned | Capacity, its measure not stated by the source | One building, Building one | November 2026 | Stream Data Centers |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Site area | More than 35 acres | Whole campus | Stream Data Centers |
| Floor area | 2,000,000 sq ft | Whole campus | Stream Data Centers |
| Buildings, in all | 3 | Whole campus | Stream Data Centers |
| Stories | 2 | One building | Stream Data Centers |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Stream Data Centers | Developer | Stream Data Centers | |
| ComEd | Energy partner | Stream Data Centers |
General contractor: Not found in the sources consulted.
About the campus
Stream Data Centers describes ORDC, also called Chicago III, as a planned 35-plus acre, three-building hyperscale campus in Elk Grove Village, Illinois, with building one set to deliver 40 MW across two stories. Stream's own site lists the campus as 'In Development' and 'Coming Soon' rather than confirming groundbreaking, so it is recorded here as announced rather than under construction. It is a separate project from Stream's existing ORDB (Chicago II) facility.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Chicago Data Center Solutions, Stream Data Centers. Consulted 19 Nov 2026.
- Chicago Data Center Solutions, Stream Data Centers. Consulted 20 Nov 2026.