Microsoft Alviso datacenter

Location
San Jose, CA, United States. Site address: 1657 Alviso-Milpitas Road, San Jose, California. See it on the map, in 3D
Stage
Site preparation under way, as of 2026 (Microsoft). Microsoft's own update describes a multi-phase effort to prepare the land, with construction beginning in fall 2025 focused on earthmoving and soil remediation, and site preparation expected to finish by summer 2026; no vertical building construction or MW figure is stated.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
OwnerMicrosoft Corporation
TypeHyperscale, self-builtMicrosoft
AmountNot found in the sources consulted
Sourced facts of the campus

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all2Whole campusCalifornia Energy Commission
Floor areaAbout 396,914 sq ftWhole campusCalifornia Energy Commission
Stories1One buildingCalifornia Energy Commission
Site area64.5 acresWhole campusCalifornia Office of Land Use and Climate Innovation (CEQAnet)
Generators224Whole campusCalifornia Energy Commission
Substation capacityOnsite 115 kV substation with two 115 kV supply linesWhole campusCalifornia Energy Commission
On-site generationBackup generators with a generating capacity not exceeding 100 MWWhole campusCalifornia Office of Land Use and Climate Innovation (CEQAnet)
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
HITT Contracting Inc.General contractorMicrosoft
Microsoft CorporationOwnerCalifornia Energy Commission
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
July 14, 2022California Energy Commission adopts the Small Power Plant Exemption order (docket 19-SPPE-04)California Energy Commission
2025Construction began, focused on earthmoving and soil remediation.Microsoft
2026 (planned)Site preparation expected to be completed by summer 2026.Microsoft
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Microsoft is preparing its Alviso site at 1657 Alviso-Milpitas Road in San Jose, California (parcel 015-31-054, 64.5 acres) for a datacenter campus. The California Energy Commission's 2022 exemption describes two single-story data center buildings of about 396,914 gross square feet, an onsite 115 kV substation and 224 renewable natural gas backup generators. Microsoft's own update says land preparation began in fall 2025, with HITT Contracting Inc. as general contractor.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.