Research record, fact-checked
DataBank DFW9 Red Oak
- Location
- Red Oak, Ellis County, TX, United States. Site address: 3080 Batchler Rd., Red Oak, TX 75154. See it on the map, in 3D
- Stage
- Under construction, as of April 2026 (DataBank). DataBank secured construction financing for the first three buildings of the campus, with the first delivery expected in Q3 2026.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | DataBank | |
| Type | Colocation | DataBank |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 60 MW, planned | IT capacity (power for the computing equipment) | One building, Phase 1 | 2026 | DataBank |
| 480 MW, planned | IT capacity (power for the computing equipment) | Whole campus | 2026 | DataBank |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$2 bn | Financing | One phase | April 21, 2026 | DataBankCovers the first three of eight planned buildings on the campus, not DFW9 alone. |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area of one building | 200,000 sq ft | One building | DataBank |
| Buildings, in all | 8 | Whole campus | DataBank |
| Floor area of one building | 425,170 sq ft | One building | Texas Department of Licensing and Regulation |
| Stories | 2 | One building | Texas Department of Licensing and Regulation |
| Substation capacity | 400 MW | Whole campus | DataBank |
| Cooling | two data hall floors per building, one air-cooled and one liquid-cooled on a closed loop | One building | DataBank |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| DataBank | Owner | DataBank | |
| Rogers-O'Brien Construction | General contractor | first phase (DFW9 to DFW12); Named by DataBank as general contractor leading the first phase | DataBank |
| Yates Construction | General contractor | first phase (DFW9 to DFW12); Named by DataBank as general contractor leading the first phase | DataBank |
| JHET Architects | Design | DFW9; Design firm on the state registrations of DFW9 and its fit-out | Texas Department of Licensing and Regulation |
| DB Data Center Red Oak, LLC | Owner | Texas Department of Licensing and Regulation | |
| DB Data Center Red Oak 12, LLC | Owner | Texas Department of Licensing and Regulation |
Milestones
| Date | Milestone | Source |
|---|---|---|
| September 15, 2024 | Texas Department of Licensing and Regulation | |
| February 15, 2025 | Texas Department of Licensing and Regulation | |
| December 16, 2025 | Texas Department of Licensing and Regulation | |
| March 1, 2026 | Texas Department of Licensing and Regulation | |
| April 21, 2026 | DataBank secured 2.0 billion dollars of construction financing for the first three buildings. | DataBank |
| May 8, 2026 | Texas Department of Licensing and Regulation | |
| August 2026 | DataBank |
About the campus
DataBank's Red Oak campus, on Batchler Road about 20 miles south of Dallas, is planned for eight two-story buildings with a 400 MW substation. Its first building, DFW9, is registered with the state at 425,170 square feet and an estimated cost of $256 million, designed by JHET Architects; DataBank names Rogers-O'Brien Construction and Yates Construction as the general contractors leading the first phase, DFW9 to DFW12.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- DataBank Secures $2.0B of Construction Financing for First Three Data Centers on New South Dallas Campus, DataBank, 21 Apr 2026. Consulted 19 Nov 2026.
- Red Oak Data Center - DataBank, DataBank. Consulted 19 Nov 2026.
- Inside DataBank's Multibillion-Dollar Red Oak Data Center Campus, DataBank, 26 Jul 2026. Consulted 20 Nov 2026.
- TABS Project TABS2024020821, Databank Red Oak - DFW9, Texas Department of Licensing and Regulation, 13 Jun 2024. Consulted 20 Nov 2026.
- TABS Project TABS2026008169, Databank Red Oak - DFW9 TFO, Texas Department of Licensing and Regulation, 16 Dec 2025. Consulted 20 Nov 2026.
- TABS Project TABS2026018081, DataBank Red Oak - DFW12 TFO, Texas Department of Licensing and Regulation. Consulted 20 Nov 2026.
- TABS Project TABS2025004329, Databank Red Oak - DFW10, Texas Department of Licensing and Regulation. Consulted 20 Nov 2026.
- TABS Project TABS2026009183, Databank Red Oak - DFW13, Texas Department of Licensing and Regulation. Consulted 20 Nov 2026.
- TABS Project TABS2026008169, Databank Red Oak - DFW9 TFO, Texas Department of Licensing and Regulation. Consulted 20 Nov 2026.
- Ellis_County_Parcel_Ownership FeatureServer, query for DB DATA CENTER RED OAK LLC, City of Red Oak (Ellis County parcel ownership layer). Consulted 20 Nov 2026.