Research record, fact-checked
EdgeCore Phoenix (Mesa) Campus
- Location
- Mesa, Maricopa County, AZ, United States. See it on the map, in 3D
- Stage
- Under construction, as of May 20, 2025 (EdgeCore Digital Infrastructure). EdgeCore's own May 20, 2025 press release states PH02 and PH03 are currently under construction, with completion expected in 2025 and 2026.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | EdgeCore Digital Infrastructure | |
| Type | Hyperscale, self-built | EdgeCore Digital Infrastructure |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 496 MW | IT capacity (power for the computing equipment) | Whole campus, Whole Phoenix/Mesa campus (PH01-PH03, not broken down per building) | November 2026 | EdgeCore Digital Infrastructure |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings, in all | 5 | Whole campus | EdgeCore Digital Infrastructure |
| Floor area | 2,700,000 sq ft | Whole campus | EdgeCore Digital Infrastructure |
| Site area | 84 acres | Whole campus | EdgeCore Digital Infrastructure |
| Cooling | Closed-loop air-cooled systems, air-cooled and direct-to-chip liquid-cooled capable; closed-loop chilled water, WUE below .01 L/kWh | Whole campus | EdgeCore Digital Infrastructure |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| EdgeCore Digital Infrastructure | Developer | EdgeCore Digital Infrastructure | |
| Holder Construction | General contractor | EdgeCore's construction partner at its Phoenix (Mesa) campus, among four campuses. | EdgeCore Digital Infrastructure |
| DMB Mesa Proving Grounds LLC | landowner | Owner of record of the EDI Mesa 2 site at the January 2024 hearing. | City of Mesa |
Milestones
| Date | Milestone | Source |
|---|---|---|
| January 24, 2024 | Mesa Planning and Zoning Board approved the major site plan modification for 'EDI Mesa 2' (44 acres) | City of Mesa |
| May 20, 2025 | PH02 and PH03 awarded Designed to Earn ENERGY STAR certification | EdgeCore Digital Infrastructure |
| May 20, 2025 | PH02 and PH03 awarded Designed to Earn ENERGY STAR certification | EdgeCore Digital Infrastructure |
About the campus
EdgeCore is building PH02, the second of three buildings on its Mesa, Arizona campus, confirmed under construction in EdgeCore's own May 20, 2025 release alongside the third building PH03, both expected complete in 2025 and 2026 and both awarded Designed to Earn ENERGY STAR certification. The whole Phoenix-area campus is now described by EdgeCore as five buildings totaling 496 MW of critical IT load across 2.7 million square feet on 84 acres, a figure not broken down per building.
- EdgeCore Phoenix (Mesa) Campus: Building PH02, the second building of the Mesa campus
- EdgeCore Phoenix (Mesa) Campus: Building PH03, the third building of the Mesa campus
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW, EdgeCore Digital Infrastructure, 20 May 2025. Consulted 19 Nov 2026.
- Phoenix Data Centers, EdgeCore Digital Infrastructure. Consulted 19 Nov 2026.
- EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW, EdgeCore Digital Infrastructure, 20 May 2025. Consulted 19 Nov 2026.
- Phoenix Data Centers, EdgeCore Digital Infrastructure. Consulted 19 Nov 2026.
- EdgeCore Digital Infrastructure Celebrates Construction Safety Week in Recognition of its Corporate Commitment to Ensuring Workforce Safety, EdgeCore Digital Infrastructure, 8 May 2025. Consulted 20 Nov 2026.
- Planning and Zoning Board, Public Hearing, Meeting Minutes, January 24, 2024, City of Mesa, 24 Jan 2024. Consulted 20 Nov 2026.