Research record, fact-checked
PHX01-01
- Location
- Avondale, Maricopa County, AZ, United States. Site address: 3700 S. Avondale Blvd. See it on the map, in 3D
- Stage
- Under construction, as of November 2026 (Prime Data Centers). Prime's Phoenix page, read on 2026-11-20, lists PHX01-01 to PHX01-03 as under construction and leased, PHX01-04 under construction and available, PHX01-05 in development.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Prime Data Centers | |
| Type | Leased hyperscale campuses | |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 48 MW | IT capacity (power for the computing equipment) | One building, Building PHX01-01 of the Prime Phoenix Campus PHX01 | October 2025 | Prime Data Centers |
| 48 MW | IT capacity (power for the computing equipment) | One building, Building PHX01-02 of the Prime Phoenix Campus PHX01 | November 2026 | Prime Data Centers |
| 48 MW | IT capacity (power for the computing equipment) | One building, Building PHX01-03 of the Prime Phoenix Campus PHX01 | October 2025 | Prime Data Centers |
| 48 MW | IT capacity (power for the computing equipment) | One building, Building PHX01-04 of the Prime Phoenix Campus PHX01 | October 2025 | Prime Data Centers |
| 250 MW | Capacity, its measure not stated by the source | Whole campus | Prime Data Centers |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area of one building | 267,000 sq ft | One building | Prime Data Centers |
| Site area | 66.5 acres | Whole campus | Prime Data Centers |
| Buildings, in all | 5 | Whole campus | Prime Data Centers |
| Floor area | 1,300,000 sq ft | Whole campus | Prime Data Centers |
| Cooling | Closed air loop and liquid | Whole campus | Prime Data Centers |
| Substation capacity | null | Whole campus | Prime Data Centers |
| Buildings under construction | 4 | Whole campus | Prime Data Centers |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Prime Data Centers | Developer | Prime Data Centers | |
| SRP (Salt River Project) | Energy partner | Prime Data Centers | |
| ARCO/Murray | General contractor | Phase 1: site development, private substation coordination and core and shell of the first three buildings (PHX01-01 to PHX01-03); ARCO/Murray's own release describes its scope on the campus. | ARCO/Murray |
Milestones
| Date | Milestone | Source |
|---|---|---|
| May 21, 2026 | Prime breaks ground on the first three data centers of the five-building PHX01 campus in Avondale | Prime Data Centers |
About the campus
PHX01-01 is a 48MW, 267,000 square foot hyperscale building at 3700 S. Avondale Blvd, part of Prime Data Centers' 66.5-acre Phoenix Campus PHX01, planned for five hyperscale data centers totaling 240MW and 1.3 million square feet. Prime's own technical data sheet lists the building's status as Construction, with on-site substation power from SRP and closed air loop and liquid cooling.
- PHX01-01: Building PHX01-01 of the Prime Phoenix Campus PHX01
- PHX01-02: Building PHX01-02 of the Prime Phoenix Campus PHX01
- PHX01-03: Building PHX01-03 of the Prime Phoenix Campus PHX01
- PHX01-04: Building PHX01-04 of the Prime Phoenix Campus PHX01
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- PHX01-01 technical data sheet, Phoenix Campus PHX01, Prime Data Centers, Oct 2025. Consulted 19 Nov 2026.
- Phoenix Data Centers (location page), Prime Data Centers. Consulted 19 Nov 2026.
- PHX01-03 technical data sheet, Phoenix Campus PHX01, Prime Data Centers, Oct 2025. Consulted 19 Nov 2026.
- PHX01-04 technical data sheet, Phoenix Campus PHX01, Prime Data Centers, Oct 2025. Consulted 19 Nov 2026.
- PHX01-01 technical data sheet, Phoenix Campus PHX01, Prime Data Centers, Oct 2025. Consulted 20 Nov 2026.
- Phoenix Data Centers (location page), Prime Data Centers. Consulted 20 Nov 2026.
- ARCO and Prime Data Centers Celebrate Data Center Campus Groundbreaking in Avondale, AZ, ARCO/Murray. Consulted 20 Nov 2026.
- Prime Data Centers Breaks Ground on Three Buildings at its 240MW Campus in Phoenix, Advancing $3B Investment in Avondale, Prime Data Centers, 21 May 2026. Consulted 20 Nov 2026.