CoreSite DE3 Denver

Location
Denver, CO, United States. Site address: 4900 Race St., Denver, CO 80216. See it on the map, in 3D
Stage
Under construction, as of 2026 (CoreSite). CoreSite's own construction page for DE3 gives a late 2026 operational target and describes active construction spend.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
OwnerCoreSite
TypeColocationCoreSite
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
18 MW, plannedCapacity, its measure not stated by the sourceOne building2026CoreSite
60 MWIT capacity (power for the computing equipment)Whole campusCoreSite
18 MWIT capacity (power for the computing equipment)One buildingCoreSite
Capacity figures, each with what it measures

Investment and financing

An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
More than US$16 MContract valueOne building2026CoreSiteConstruction contracts awarded to Colorado vendors, not the total project cost.
Amounts, each with its kind and scope

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Floor area of one buildingAbout 170,000 sq ftOne buildingCoreSite
Buildings, in all3Whole campusCoreSite
Floor areaAbout 590,000 sq ftWhole campusCoreSite
Floor area of one building180,000 sq ftOne buildingDPR Construction
Stories3One buildingCoreSite
Site area15 acresWhole campusCoreSite
Substation capacityon-site substation anticipatedWhole campusCoreSite
CoolingWater-cooled magnetic bearing variable speed chillers with cooling towers and water-side economizationOne buildingCoreSite
GeneratorsBackup diesel generators, N+1One buildingDPR Construction
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
CoreSiteOwnerCoreSite
DPR ConstructionGeneral contractorConstructor of the DE3 core and shell and tenant improvements, per DPR's own project page.DPR Construction
CorganDesignDesign team named on DPR's project page.DPR Construction
Schneider ElectricTrade contractorvendor (role not stated); Named by CoreSite among the project's vendors.CoreSite (Business Wire)
Power Distribution SystemsTrade contractorvendor (role not stated); Named by CoreSite among the project's vendors.CoreSite (Business Wire)
Power Systems WestTrade contractorvendor (role not stated); Named by CoreSite among the project's vendors.CoreSite (Business Wire)
Xcel EnergyEnergy partnerCoreSite
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
October 6, 2025Topping off celebratedCoreSite (Business Wire)
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

DE3 is the first of three buildings CoreSite plans on a 15-acre campus at 4900 Race St. in Denver's Elyria-Swansea neighborhood, a former concrete plant, for about 590,000 square feet and 60 critical MW in all. DPR Construction is building DE3, a three-story building of about 180,000 square feet with 18 MW across three computer rooms designed by Corgan; CoreSite celebrated its topping off in October 2025 and targets availability in 2026.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.