Research record, fact-checked
CoreSite DE3 Denver
- Location
- Denver, CO, United States. Site address: 4900 Race St., Denver, CO 80216. See it on the map, in 3D
- Stage
- Under construction, as of 2026 (CoreSite). CoreSite's own construction page for DE3 gives a late 2026 operational target and describes active construction spend.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | CoreSite | |
| Type | Colocation | CoreSite |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 18 MW, planned | Capacity, its measure not stated by the source | One building | 2026 | CoreSite |
| 60 MW | IT capacity (power for the computing equipment) | Whole campus | CoreSite | |
| 18 MW | IT capacity (power for the computing equipment) | One building | CoreSite |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| More than US$16 M | Contract value | One building | 2026 | CoreSiteConstruction contracts awarded to Colorado vendors, not the total project cost. |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area of one building | About 170,000 sq ft | One building | CoreSite |
| Buildings, in all | 3 | Whole campus | CoreSite |
| Floor area | About 590,000 sq ft | Whole campus | CoreSite |
| Floor area of one building | 180,000 sq ft | One building | DPR Construction |
| Stories | 3 | One building | CoreSite |
| Site area | 15 acres | Whole campus | CoreSite |
| Substation capacity | on-site substation anticipated | Whole campus | CoreSite |
| Cooling | Water-cooled magnetic bearing variable speed chillers with cooling towers and water-side economization | One building | CoreSite |
| Generators | Backup diesel generators, N+1 | One building | DPR Construction |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| CoreSite | Owner | CoreSite | |
| DPR Construction | General contractor | Constructor of the DE3 core and shell and tenant improvements, per DPR's own project page. | DPR Construction |
| Corgan | Design | Design team named on DPR's project page. | DPR Construction |
| Schneider Electric | Trade contractor | vendor (role not stated); Named by CoreSite among the project's vendors. | CoreSite (Business Wire) |
| Power Distribution Systems | Trade contractor | vendor (role not stated); Named by CoreSite among the project's vendors. | CoreSite (Business Wire) |
| Power Systems West | Trade contractor | vendor (role not stated); Named by CoreSite among the project's vendors. | CoreSite (Business Wire) |
| Xcel Energy | Energy partner | CoreSite |
Milestones
| Date | Milestone | Source |
|---|---|---|
| October 6, 2025 | Topping off celebrated | CoreSite (Business Wire) |
About the campus
DE3 is the first of three buildings CoreSite plans on a 15-acre campus at 4900 Race St. in Denver's Elyria-Swansea neighborhood, a former concrete plant, for about 590,000 square feet and 60 critical MW in all. DPR Construction is building DE3, a three-story building of about 180,000 square feet with 18 MW across three computer rooms designed by Corgan; CoreSite celebrated its topping off in October 2025 and targets availability in 2026.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- DE3 Construction, CoreSite. Consulted 19 Nov 2026.
- CoreSite DE3 Data Center, DPR Construction. Consulted 20 Nov 2026.
- CoreSite Achieves Key Construction Milestone for New DE3 Data Center in Denver, CoreSite (Business Wire), 6 Oct 2025. Consulted 20 Nov 2026.
- Denver DE3 specification sheet, CoreSite. Consulted 20 Nov 2026.
- DE3 Construction, CoreSite. Consulted 20 Nov 2026.