Research record, fact-checked
Meta Montgomery Data Center
- Location
- Montgomery, AL, United States. See it on the map, in 3D
- Stage
- Under construction, as of September 2025 (Meta). Meta's own September 2025 announcement describes active on-site construction for the campus expansion.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| More than US$1.5 bn | Announced investment | Whole campus | September 2025 | Meta |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area | Nearly 1,300,000 sq ft | Whole campus | Meta |
| Buildings, in all | the September 2025 expansion adds two new buildings to the campus | Whole campus | Meta |
| Floor area | 715,000 sq ft | One phase | Hensel Phelps |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Meta | Owner | Meta | |
| Alabama Power Company | Energy partner | Meta | |
| Hensel Phelps | General contractor | Awarded the 715,000 square foot data center in May 2024; also building the campus's mass timber administrative facility. | Hensel Phelps |
| Ralph L. Wadsworth Construction | Site preparation | Subcontractor in the preconstruction phase of the site development: soil testing and the conceptual design of wet utilities. | Ralph L. Wadsworth Construction |
| Binderholz | supplier | Mass timber provider for the campus's administrative facility | Hensel Phelps |
Milestones
| Date | Milestone | Source |
|---|---|---|
| May 9, 2024 | Hensel Phelps announces Meta's award of the Montgomery data center, scheduled for completion by the end of 2026 | Hensel Phelps |
| September 23, 2025 | Meta announced a two building expansion of the Montgomery campus. | Meta |
About the campus
Meta's Montgomery, Alabama data center campus was expanded with two additional buildings in a September 2025 announcement, bringing the campus to nearly 1.3 million square feet and raising total investment to more than 1.5 billion dollars. The campus supports more than 1,000 construction workers at peak and is expected to support more than 100 operational jobs.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Montgomery, we're growing! - Meta Data Centers, Meta, 23 Sep 2025. Consulted 19 Nov 2026.
- Meta Montgomery Data Center info sheet, Meta. Consulted 20 Nov 2026.
- Montgomery, we're growing!, Meta, 23 Sep 2025. Consulted 20 Nov 2026.
- Meta Awards Hensel Phelps Montgomery Data Center, Hensel Phelps, 9 May 2024. Consulted 20 Nov 2026.
- Meta, Montgomery Data Center Campus, Ralph L. Wadsworth Construction. Consulted 20 Nov 2026.
- Hensel Phelps Builds with Mass Timber at Meta Data Center, Hensel Phelps, 6 Aug 2025. Consulted 20 Nov 2026.