Meta Montgomery Data Center

Location
Montgomery, AL, United States. See it on the map, in 3D
Stage
Under construction, as of September 2025 (Meta). Meta's own September 2025 announcement describes active on-site construction for the campus expansion.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
OwnerMeta
TypeHyperscale, self-builtMeta
Headline amountMore than US$1.5 billion (US dollars), as of September 2025Meta
What it coversAnnounced investment, lower bound. Not to be read as a construction cost.
Sourced facts of the campus

Investment and financing

An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
More than US$1.5 bnAnnounced investmentWhole campusSeptember 2025Meta
Amounts, each with its kind and scope

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Floor areaNearly 1,300,000 sq ftWhole campusMeta
Buildings, in allthe September 2025 expansion adds two new buildings to the campusWhole campusMeta
Floor area715,000 sq ftOne phaseHensel Phelps
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
MetaOwnerMeta
Alabama Power CompanyEnergy partnerMeta
Hensel PhelpsGeneral contractorAwarded the 715,000 square foot data center in May 2024; also building the campus's mass timber administrative facility.Hensel Phelps
Ralph L. Wadsworth ConstructionSite preparationSubcontractor in the preconstruction phase of the site development: soil testing and the conceptual design of wet utilities.Ralph L. Wadsworth Construction
BinderholzsupplierMass timber provider for the campus's administrative facilityHensel Phelps
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
May 9, 2024Hensel Phelps announces Meta's award of the Montgomery data center, scheduled for completion by the end of 2026Hensel Phelps
September 23, 2025Meta announced a two building expansion of the Montgomery campus.Meta
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Meta's Montgomery, Alabama data center campus was expanded with two additional buildings in a September 2025 announcement, bringing the campus to nearly 1.3 million square feet and raising total investment to more than 1.5 billion dollars. The campus supports more than 1,000 construction workers at peak and is expected to support more than 100 operational jobs.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.