Meta Sturgeon County Data Center

Location
Sturgeon County, AB, Canada. See it on the map, in 3D
Stage
Under construction, as of November 2026 (Impact Assessment Agency of Canada). The Impact Assessment Agency of Canada's response of November 2026 says construction has been under way since June 2026 (site preparation, earthworks, underground utilities, stormwater ponds).
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
OwnerMeta
TypeHyperscale, self-builtMeta
Headline amountC$13 billion (Canadian dollars), as of July 2026Meta
What it coversAnnounced investment: Total investment announced for the campus once complete. Not to be read as a construction cost.
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
1,000 MW, plannedCapacity, its measure not stated by the sourceWhole campusJuly 2026Meta
1,600 MWCapacity, its measure not stated by the sourceWhole campusSturgeon Data Centre (project site)
970 MWCapacity, its measure not stated by the sourceWhole campusSturgeon County
Capacity figures, each with what it measures

Investment and financing

An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
C$13 bnAnnounced investmentWhole campusJuly 2026MetaTotal investment announced for the campus once complete.
C$60 MPublic incentiveWhole campusJuly 2026MetaLocal road and water infrastructure improvements funded by Meta.
Amounts, each with its kind and scope

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
CoolingnullWhole campusMeta
Coolingclosed-loop, liquid-cooled system with dry cooling; no operational water use in the cooling systemWhole campusMeta
On-site generation932 MW from the Greenlight Electricity Centre (AUC approved), listed by the County as the project's onsite electricityWhole campusSturgeon County
Site area1,750 acresWhole campusImpact Assessment Agency of Canada
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
MetaOwnerMeta
Frost Collective (joint venture of Clark Builders and PCL Construction)General contractorMeta
Capital PowerEnergy partnerMeta
AltaLinkEnergy partnerMeta
Alberta Electric System OperatorEnergy partnerMeta
Greenlight Limited PartnershipEnergy partnerMeta
StantecTrade contractordelivery team support (role not specified)Sturgeon Data Centre (project site)
SLBTrade contractordelivery team support (role not specified)Sturgeon Data Centre (project site)
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
June 2026Construction activities under wayImpact Assessment Agency of Canada
June 16, 2026Sturgeon County issues the master site development permit DP-26-0028 for a Data Processing Facility (Major) at 56111 Range Road 223Sturgeon County
July 8, 2026Meta broke ground on its first Canadian data center in Sturgeon County, Alberta.Meta
November 10, 2026Federal agency declines to designate the project under the Impact Assessment Act because the physical activity has substantially begunImpact Assessment Agency of Canada
2028Sturgeon County
2028Sturgeon County lists 2028 as the year Meta's data centre becomes operationalSturgeon County
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Meta is building a 1 GW AI data center campus in Sturgeon County, Alberta, its first in Canada, with groundbreaking held on July 8, 2026. The project represents an investment of more than CAD 13 billion, supported by about CAD 60 million in local infrastructure improvements, with Frost Collective (a joint venture of Clark Builders and PCL Construction) as general contractor and a closed loop liquid cooling system with no operational water use.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.