Research record, fact-checked
Meta Sturgeon County Data Center
- Location
- Sturgeon County, AB, Canada. See it on the map, in 3D
- Stage
- Under construction, as of November 2026 (Impact Assessment Agency of Canada). The Impact Assessment Agency of Canada's response of November 2026 says construction has been under way since June 2026 (site preparation, earthworks, underground utilities, stormwater ponds).
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | Meta | |
| Type | Hyperscale, self-built | Meta |
| Headline amount | C$13 billion (Canadian dollars), as of July 2026 | Meta |
| What it covers | Announced investment: Total investment announced for the campus once complete. Not to be read as a construction cost. |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 1,000 MW, planned | Capacity, its measure not stated by the source | Whole campus | July 2026 | Meta |
| 1,600 MW | Capacity, its measure not stated by the source | Whole campus | Sturgeon Data Centre (project site) | |
| 970 MW | Capacity, its measure not stated by the source | Whole campus | Sturgeon County |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| C$13 bn | Announced investment | Whole campus | July 2026 | MetaTotal investment announced for the campus once complete. |
| C$60 M | Public incentive | Whole campus | July 2026 | MetaLocal road and water infrastructure improvements funded by Meta. |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Cooling | null | Whole campus | Meta |
| Cooling | closed-loop, liquid-cooled system with dry cooling; no operational water use in the cooling system | Whole campus | Meta |
| On-site generation | 932 MW from the Greenlight Electricity Centre (AUC approved), listed by the County as the project's onsite electricity | Whole campus | Sturgeon County |
| Site area | 1,750 acres | Whole campus | Impact Assessment Agency of Canada |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Meta | Owner | Meta | |
| Frost Collective (joint venture of Clark Builders and PCL Construction) | General contractor | Meta | |
| Capital Power | Energy partner | Meta | |
| AltaLink | Energy partner | Meta | |
| Alberta Electric System Operator | Energy partner | Meta | |
| Greenlight Limited Partnership | Energy partner | Meta | |
| Stantec | Trade contractor | delivery team support (role not specified) | Sturgeon Data Centre (project site) |
| SLB | Trade contractor | delivery team support (role not specified) | Sturgeon Data Centre (project site) |
Milestones
| Date | Milestone | Source |
|---|---|---|
| June 2026 | Construction activities under way | Impact Assessment Agency of Canada |
| June 16, 2026 | Sturgeon County issues the master site development permit DP-26-0028 for a Data Processing Facility (Major) at 56111 Range Road 223 | Sturgeon County |
| July 8, 2026 | Meta broke ground on its first Canadian data center in Sturgeon County, Alberta. | Meta |
| November 10, 2026 | Federal agency declines to designate the project under the Impact Assessment Act because the physical activity has substantially begun | Impact Assessment Agency of Canada |
| 2028 | Sturgeon County | |
| 2028 | Sturgeon County lists 2028 as the year Meta's data centre becomes operational | Sturgeon County |
About the campus
Meta is building a 1 GW AI data center campus in Sturgeon County, Alberta, its first in Canada, with groundbreaking held on July 8, 2026. The project represents an investment of more than CAD 13 billion, supported by about CAD 60 million in local infrastructure improvements, with Frost Collective (a joint venture of Clark Builders and PCL Construction) as general contractor and a closed loop liquid cooling system with no operational water use.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Breaking Ground on Meta's First Data Center in Canada, Meta, Jul 2026. Consulted 19 Nov 2026.
- Hello, Sturgeon County! - Meta Data Centers, Meta, Jul 2026. Consulted 19 Nov 2026.
- Sturgeon Data Centre, Sturgeon Data Centre (project site). Consulted 20 Nov 2026.
- Hello, Sturgeon County!, Meta, 8 Jul 2026. Consulted 20 Nov 2026.
- Data Centre Development, Sturgeon County. Consulted 20 Nov 2026.
- Heartland Activity Update, August 2026 (council presentation), Sturgeon County, Aug 2026. Consulted 20 Nov 2026.
- Development permit approval notice for 56111 Rge Rd 223 (DP-26-0028), Sturgeon County, 16 Jun 2026. Consulted 20 Nov 2026.
- Full road closure: Range Road 223 from Hwy 643 south to Township Road 560, Sturgeon County, 24 Aug 2026. Consulted 20 Nov 2026.
- Sturgeon Data Centre Project (Canadian Impact Assessment Registry, reference 90873), Impact Assessment Agency of Canada, 10 Nov 2026. Consulted 20 Nov 2026.
- Vice-President's Response, Sturgeon Data Centre Project designation request, Impact Assessment Agency of Canada, 10 Nov 2026. Consulted 20 Nov 2026.