Mount Prospect, IL, United States. Site address: 1200 E. Algonquin Road and 1200 Dempster Street, Mount Prospect, Illinois. See it on the map, in 3D
Stage
Stage not confirmed: Not found in the sources consulted (Village of Mount Prospect (Planning and Zoning Commission)). CloudHQ's campus page gives a ready-for-service target within 20 months and no date for the start of works.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperCloudHQ
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
252 MWIT capacity (power for the computing equipment)Whole campusCloudHQ
Up to 300 MW, plannedIT capacity (power for the computing equipment)Whole campusCloudHQ
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Floor area1,700,000 sq ftWhole campusCloudHQ
Buildings, in all2Whole campusVillage of Mount Prospect
Floor areaAbout 2,172,000 sq ftWhole campusVillage of Mount Prospect (Planning and Zoning Commission)
Stories3One buildingVillage of Mount Prospect (Planning and Zoning Commission)
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
CloudHQDeveloperCloudHQ
Commonwealth Edison (ComEd)Energy partnerVillage of Mount Prospect
TUR Ventures LLCDeveloperpetitioner for the October 2025 PUD amendment; party to the November 18, 2025 Public Improvements Agreement with the VillageVillage of Mount Prospect (Planning and Zoning Commission)
Holder ConstructionGeneral contractorDemolition of the former United Airlines headquarters, June 2022 to February 2023, under the earlier three-building plan; Named by its demolition contractor, American Demolition, as the client of the demolition together with CloudHQ.American Demolition
American DemolitionSite preparationDemolition of the former United Airlines headquarters, June 2022 to February 2023; Total demolition of structures up to eight stories and a 30-foot-deep subterranean data center, with environmental remediation; contract value $12,600,000.American Demolition
Companies named by the operator, the developer, a filing or a government, each with its role

About the campus

CloudHQ's ORD campus occupies the former United Airlines site at 1200 E. Algonquin Road and 1200 Dempster Street in Mount Prospect, Illinois. In October 2025 the Village of Mount Prospect amended the planned unit development to a two-building data center campus of approximately 2,172,000 square feet of gross floor area, with three-story buildings, two electrical substations and 365 parking spaces. The petitioner was TUR Ventures LLC.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.