CloudHQ ORD Campus, Mount Prospect
- Location
- Mount Prospect, IL, United States. Site address: 1200 E. Algonquin Road and 1200 Dempster Street, Mount Prospect, Illinois. See it on the map, in 3D
- Stage
- Stage not confirmed: Not found in the sources consulted (Village of Mount Prospect (Planning and Zoning Commission)). CloudHQ's campus page gives a ready-for-service target within 20 months and no date for the start of works.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | CloudHQ | |
| Type | Leased hyperscale campuses | |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Floor area | 1,700,000 sq ft | Whole campus | CloudHQ |
| Buildings, in all | 2 | Whole campus | Village of Mount Prospect |
| Floor area | About 2,172,000 sq ft | Whole campus | Village of Mount Prospect (Planning and Zoning Commission) |
| Stories | 3 | One building | Village of Mount Prospect (Planning and Zoning Commission) |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| CloudHQ | Developer | CloudHQ | |
| Commonwealth Edison (ComEd) | Energy partner | Village of Mount Prospect | |
| TUR Ventures LLC | Developer | petitioner for the October 2025 PUD amendment; party to the November 18, 2025 Public Improvements Agreement with the Village | Village of Mount Prospect (Planning and Zoning Commission) |
| Holder Construction | General contractor | Demolition of the former United Airlines headquarters, June 2022 to February 2023, under the earlier three-building plan; Named by its demolition contractor, American Demolition, as the client of the demolition together with CloudHQ. | American Demolition |
| American Demolition | Site preparation | Demolition of the former United Airlines headquarters, June 2022 to February 2023; Total demolition of structures up to eight stories and a 30-foot-deep subterranean data center, with environmental remediation; contract value $12,600,000. | American Demolition |
About the campus
CloudHQ's ORD campus occupies the former United Airlines site at 1200 E. Algonquin Road and 1200 Dempster Street in Mount Prospect, Illinois. In October 2025 the Village of Mount Prospect amended the planned unit development to a two-building data center campus of approximately 2,172,000 square feet of gross floor area, with three-story buildings, two electrical substations and 365 parking spaces. The petitioner was TUR Ventures LLC.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- CloudHQ ORD Campus, CloudHQ. Consulted 19 Nov 2026.
- Cloud HQ - Data Center (Community Information and Fact Check Portal), Village of Mount Prospect. Consulted 20 Nov 2026.
- P&Z agenda packet, CivicClerk file 822 (case PZ-21-25, 1200 E. Algonquin Road, 1200 Dempster Street), Village of Mount Prospect (Planning and Zoning Commission), 23 Oct 2025. Consulted 20 Nov 2026.
- United Airlines World HQ (project page), American Demolition. Consulted 20 Nov 2026.