Research record, fact-checked

PowerHouse Pacific

Location
Ashburn, VA, United States. Site address: 22000 AOL Way, Sterling, VA 20166 (former AOL campus); the new buildings carry 22190 (Building A), 22214 (Building B) and 22279 (Building C) Power Player in the county's permits. See it on the map, in 3D
Stage
Stage not confirmed: Not found in the sources consulted (Loudoun County, Virginia). PowerHouse gives a construction and delivery window from the fourth quarter of 2023 to the second quarter of 2027, without dating a start of works or a delivery.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperPowerHouse Data Centers
TypeLeased hyperscale campusesAmerican Real Estate Partners (AREP)
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
265 MW, plannedPower capacity of the site or its substationsWhole campusNovember 2026PowerHouse Data Centers
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all3Whole campusPowerHouse Data Centers
Floor area1,131,350 sq ftWhole campusPowerHouse Data Centers
Site area43 acresWhole campusPowerHouse Data Centers
Stories3One buildingPowerHouse Data Centers
Buildings under construction3Whole campusLoudoun County, Virginia
Substation capacityA distribution substation is part of the approved site planWhole campusLoudoun County, Virginia
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
PowerHouse Data CentersDeveloperAmerican Real Estate Partners (AREP)
E.E. Reed ConstructionGeneral contractorPowerHouse named E.E. Reed Construction as PowerHouse Pacific's general contractor in October 2023, when it mobilized for demolition; Berg Demo Group's page gives the contracting entity as E.E. Reed East Coast LLC.PowerHouse Data Centers
Berg Demo Group LLCTrade contractordemolition; demolition of the former AOL office complex; Berg Demo Group's own project page: gut and full raze of the former office complex at 22000 AOL Way.Berg Demo Group LLC
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
October 25, 2023Loudoun County issues the demolition permit for the former AOL buildings at 22000 AOL WayLoudoun County, Virginia
March 13, 2025Loudoun County issues the grading permit for the data center projectLoudoun County, Virginia
June 5, 2025Loudoun County issues the core and shell building permit of Building A (22190 Power Player)Loudoun County, Virginia
July 29, 2025Loudoun County issues the shell building permit of the third building (22279 Power Player, Building C)Loudoun County, Virginia
undefined 2026PowerHouse Data Centers
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

PowerHouse Pacific is PowerHouse Data Centers' redevelopment of the former AOL headquarters on Pacific Boulevard in Ashburn, Virginia, into a three-building, 265 MW data center campus with 1.13 million square feet of developable space for hyperscale tenants. The project's own schedule places it in construction and delivery through the second quarter of 2027. Site power MW is not the same as critical IT load.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.