Aligned Project Caprock, Abernathy
- Location
- Abernathy, Hale County, TX, United States. Site address: 1421 FM 54, Abernathy, TX 79311 (Hale County), address of LBB01. See it on the map, in 3D
- Stage
- Under construction, as of April 2026 (Aligned Data Centers). Aligned's own press release, titled about breaking ground on Project Caprock and dated April 9, 2026, describes the campus under development with a first-quarter 2027 delivery target for the first building.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Aligned Data Centers | |
| Type | Leased hyperscale campuses | |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 540 MW, planned | Capacity, its measure not stated by the source | Whole campus | April 2026 | Aligned Data Centers |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings, in all | 6 | Whole campus | Aligned Data Centers |
| Site area | 313 acres | Whole campus | Aligned Data Centers |
| Floor area | 1,650,000 sq ft | Whole campus | Aligned Data Centers |
| Cooling | DeltaFlow liquid cooling combined with air-cooled heat dissipation in a closed loop that recirculates water | Whole campus | Aligned Data Centers |
| Floor area of one building | 190,694 sq ft | One building | Texas Department of Licensing and Regulation |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Aligned Data Centers | Developer | Aligned Data Centers | |
| Xcel Energy | Energy partner | Aligned Data Centers | |
| Corgan | Design | Design firm of record of LBB01, the campus's first building, in its state accessibility registration. | Texas Department of Licensing and Regulation |
| Aligned Data Centers (Abernathy) PropCo, LLC | Owner | Texas Department of Licensing and Regulation | |
| Lambda | Tenant | Lambda Procurement, LLC is the registered occupant and Lambda, Inc. the registered operator of LBB01. | Texas Comptroller of Public Accounts |
General contractor: Not found in the sources consulted.
Milestones
| Date | Milestone | Source |
|---|---|---|
| April 24, 2026 | Texas Department of Licensing and Regulation | |
| July 10, 2026 | Texas Comptroller of Public Accounts | |
| January 2027 (planned) | Aligned targets first-quarter 2027 for the first building, LBB-01, at Project Caprock. | Aligned Data Centers |
About the campus
Project Caprock is Aligned Data Centers' campus in Hale County near Abernathy, Texas, announced on April 9, 2026 at 540 MW across six facilities on 313 acres with 1.65 million square feet, using DeltaFlow liquid cooling in a closed loop. Its first building, LBB01, at 1421 FM 54, is registered with the state at 190,694 square feet and an estimated cost of $425 million, with Corgan as design firm and works registered from April 24, 2026 to November 15, 2027. Lambda is the registered occupant and operator of LBB01.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Aligned Breaks Ground on Project Caprock, Aligned Data Centers, 9 Apr 2026. Consulted 19 Nov 2026.
- Aligned Breaks Ground on Project Caprock, Aligned Data Centers, 9 Apr 2026. Consulted 20 Nov 2026.
- TABS Project TABS2026023621, ADC - LBB01, Texas Department of Licensing and Regulation. Consulted 20 Nov 2026.
- Data Centers in Texas: Registered Qualifying Large Data Center Projects, Texas Comptroller of Public Accounts. Consulted 20 Nov 2026.
- Hale CAD parcels layer (FeatureServer/0), Hale County Appraisal District (HaleCADWebService). Consulted 20 Nov 2026.