Research record, fact-checked

Aligned Project Caprock, Abernathy

Location
Abernathy, Hale County, TX, United States. Site address: 1421 FM 54, Abernathy, TX 79311 (Hale County), address of LBB01. See it on the map, in 3D
Stage
Under construction, as of April 2026 (Aligned Data Centers). Aligned's own press release, titled about breaking ground on Project Caprock and dated April 9, 2026, describes the campus under development with a first-quarter 2027 delivery target for the first building.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperAligned Data Centers
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
540 MW, plannedCapacity, its measure not stated by the sourceWhole campusApril 2026Aligned Data Centers
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all6Whole campusAligned Data Centers
Site area313 acresWhole campusAligned Data Centers
Floor area1,650,000 sq ftWhole campusAligned Data Centers
CoolingDeltaFlow liquid cooling combined with air-cooled heat dissipation in a closed loop that recirculates waterWhole campusAligned Data Centers
Floor area of one building190,694 sq ftOne buildingTexas Department of Licensing and Regulation
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
Aligned Data CentersDeveloperAligned Data Centers
Xcel EnergyEnergy partnerAligned Data Centers
CorganDesignDesign firm of record of LBB01, the campus's first building, in its state accessibility registration.Texas Department of Licensing and Regulation
Aligned Data Centers (Abernathy) PropCo, LLCOwnerTexas Department of Licensing and Regulation
LambdaTenantLambda Procurement, LLC is the registered occupant and Lambda, Inc. the registered operator of LBB01.Texas Comptroller of Public Accounts
Companies named by the operator, the developer, a filing or a government, each with its role

General contractor: Not found in the sources consulted.

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
April 24, 2026Texas Department of Licensing and Regulation
July 10, 2026Texas Comptroller of Public Accounts
January 2027 (planned)Aligned targets first-quarter 2027 for the first building, LBB-01, at Project Caprock.Aligned Data Centers
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Project Caprock is Aligned Data Centers' campus in Hale County near Abernathy, Texas, announced on April 9, 2026 at 540 MW across six facilities on 313 acres with 1.65 million square feet, using DeltaFlow liquid cooling in a closed loop. Its first building, LBB01, at 1421 FM 54, is registered with the state at 190,694 square feet and an estimated cost of $425 million, with Corgan as design firm and works registered from April 24, 2026 to November 15, 2027. Lambda is the registered occupant and operator of LBB01.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.