Hillsboro, OR, United States. Site address: NE 30th Ave. & NE Evergreen Rd., Hillsboro, OR 97124. See it on the map, in 3D
Stage
Stage not confirmed: Not found in the sources consulted (Aligned Data Centers). Aligned's own Hillsboro page describes the building's design standard and the market, but gives no construction progress and no delivery date.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperAligned Data Centers
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
108 MWCapacity, its measure not stated by the sourceWhole campusAligned Data Centers
72 MWIT capacity (power for the computing equipment)One buildingAligned Data Centers
36 MWCapacity, its measure not stated by the sourceOne buildingAligned Data Centers
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Site area27 acresWhole campusAligned Data Centers
Buildings, in all2Whole campusAligned Data Centers
Floor area of one building628,276 sq ftOne buildingLargo Concrete
StoriesFour levels above grade (elevated slabs on metal deck)One buildingLargo Concrete
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
Aligned Data CentersDeveloperAligned Data Centers
Holder ConstructionGeneral contractorGeneral contractor on PDX-01, as named by two of its subcontractors on their own project pages.Largo Concrete
GenslerDesignLargo Concrete
Thornton TomasettiDesignLargo Concrete
Largo ConcreteTrade contractorconcrete; Elevated slabs on metal deck.Largo Concrete
Pacific FoundationTrade contractorfoundations (ground improvement); Rigid-inclusion ground improvement.Pacific Foundation
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
January 10, 2023Campus announcedAligned Data Centers
January 2025Concrete subcontractor's work on PDX-01 completedLargo Concrete
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

PDX-01 is Aligned Data Centers' 27-acre campus at NE 30th Ave. and NE Evergreen Rd. in Hillsboro, Oregon, designed to Tier III standards. Aligned's own page gives no capacity figure, construction status or delivery date for the building.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.