Research record, fact-checked

QTS Phoenix 2

Location
Phoenix, Maricopa County, AZ, United States. Site address: 1500 N 40th Street, Phoenix, AZ 85008. See it on the map, in 3D
Stage
Stage not confirmed: Not found in the sources consulted (QTS Data Centers). QTS's own campus page gives the address and campus totals but does not state the construction status of DC5 specifically among the campus's five buildings.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
OwnerQTS
TypeColocationQTS Data Centers
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
More than 210 MWCapacity, its measure not stated by the sourceWhole campusNovember 2026QTS Data Centers
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all5Whole campusQTS Data Centers
Site area80 acresWhole campusQTS Data Centers
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
QTSOwnerQTS Data Centers
Companies named by the operator, the developer, a filing or a government, each with its role

General contractor: Not found in the sources consulted.

About the campus

QTS Phoenix 2 is a five-building campus (DC1 through DC5) at 1500 N 40th Street, Phoenix, Arizona, with 210 MW or more of critical campus capacity. QTS's page does not give the construction status of its fifth building, DC5.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

  • Phoenix 2, QTS Data Centers. Consulted 19 Nov 2026.
  • Phoenix 2, QTS Data Centers. Consulted 20 Nov 2026.

See it on the map. How the map is made.