Compass Goodyear campus
- Location
- Goodyear, AZ, United States. See it on the map, in 3D
- Stage
- Stage not confirmed: Not found in the sources consulted (Compass Datacenters). Compass's own markets page lists the campus and its MW figure but gives no construction or operational status, and no dated source confirming either was found.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Compass Datacenters | |
| Type | Leased hyperscale campuses | |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 212 MW | Capacity, its measure not stated by the source | Whole campus | Compass Datacenters | |
| 72 MW | IT capacity (power for the computing equipment) | One phase, first two buildings | Compass Datacenters | |
| 240 MW | Capacity, its measure not stated by the source | Whole campus | Compass Datacenters |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Site area | 190 acres | Whole campus | Compass Datacenters |
| Substation capacity | 235 kV and 69 kV substations | Whole campus | Compass Datacenters |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Compass Datacenters | Developer | Compass Datacenters | |
| Arizona Public Service (APS) | Energy partner | Compass Datacenters |
General contractor: Not found in the sources consulted.
Milestones
| Date | Milestone | Source |
|---|---|---|
| July 9, 2019 | Construction begun on the first two data centers | Compass Datacenters |
About the campus
Compass Datacenters lists a 212 MW campus in Goodyear, Arizona, on its own markets page, without a building count, an address or a construction stage.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Data Center Markets, Compass Datacenters. Consulted 19 Nov 2026.
- Building for What's Next in Phoenix, AZ, Compass Datacenters, 2 Sep 2020. Consulted 20 Nov 2026.
- Compass Datacenters Begins Construction of First Two Data Centers on Phoenix Campus, Compass Datacenters, 9 Jul 2019. Consulted 20 Nov 2026.