Research record, fact-checked

Stafford Technology Campus (STC)

Location
Stafford County, VA, United States. See it on the map, in 3D
Stage
Announced, as of January 2025 (STACK Infrastructure). STACK's own press release announces the campus; no primary source found confirming construction had started
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperSTACK Infrastructure
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
More than 1,000 MW, plannedCapacity, its measure not stated by the sourceWhole campusJanuary 2025STACK Infrastructure
1,100 MWCapacity, its measure not stated by the sourceWhole campusSTACK Infrastructure
Capacity figures, each with what it measures

Investment and financing

An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
More than US$80 MPublic incentiveWhole campusJanuary 2025STACK InfrastructureAnnual tax revenue at full buildout, not a construction cost
Amounts, each with its kind and scope

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Site area500 acresWhole campusSTACK Infrastructure
Buildings, in all19Whole campusSTACK Infrastructure
Substation capacity300 MWWhole campusSTACK Infrastructure
Waterre-claimed (purple pipe) water system for permanent industrial coolingWhole campusSTACK Infrastructure
Site area526 acresWhole campusSTACK Infrastructure
Site areaAbout 523.94 acresWhole campusStafford County (application RC23154931)
Building height105 ftOne buildingStafford County (application RC23154931)
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
STACK InfrastructureDeveloperSTACK Infrastructure
Dominion EnergyEnergy partnerSTACK Infrastructure
Bohler EngineeringDesignPrepared the Generalized Development Plan for the rezoning.Stafford County (application RC23154931)
Stafford Technology LCapplicant and record owner at rezoning (2023)Stafford County (application RC23154931)
SI NVA07CAMPUS LLCcurrent owner of most campus parcelsStafford County Commissioner of the Revenue
Companies named by the operator, the developer, a filing or a government, each with its role

General contractor: Not found in the sources consulted.

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
January 2025STACK announces the 1+GW Stafford Technology CampusSTACK Infrastructure
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Stafford Technology Campus is a STACK Infrastructure development in Stafford County, Virginia, announced in January 2025 as a 1 plus GW campus spanning 500 acres, with four sub-campuses and a total of 19 data centers planned, drawing power from six 300MW substations supplied by Dominion Energy. Trade press has since reported a groundbreaking and a May 2026 topping out of the first building, but no STACK-published confirmation of construction progress was found.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.