Research record, fact-checked
Compass Meridian campus
- Location
- Meridian, Lauderdale County, MS, United States. Site address: I20-59 Industrial Park, Meridian, MS 39301 (Lauderdale County). See it on the map, in 3D
- Stage
- Partly in service, partly under construction, as of November 2026 (Compass Datacenters). Compass's own November 10, 2026 release ties a community event to the commissioning of the first building at the campus, while the campus overall is an eight-year, multi-building development.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Developer | Compass Datacenters | |
| Type | Leased hyperscale campuses | |
| Headline amount | US$10 billion (US dollars), as of January 2025 | Compass Datacenters |
| What it covers | Announced investment: Stated as the investment at full completion of the eight-building campus. Not to be read as a construction cost. |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 320 MW | Capacity, its measure not stated by the source | Whole campus | Compass Datacenters | |
| About 500 MW, planned | Power capacity of the site or its substations | Whole campus | January 2025 | Compass Datacenters |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$10 bn | Announced investment | Whole campus | January 2025 | Compass DatacentersStated as the investment at full completion of the eight-building campus. |
| More than US$300 M | Announced investment in the region | Several sites | November 2026 | Compass DatacentersCompany-wide grid investment the Meridian campus is said to be part of, not a Meridian-specific figure. |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings, in all | 8 | Whole campus | Compass Datacenters |
| Cooling | closed-loop hybrid cooling that consumes no water to cool IT equipment | Whole campus | Compass Datacenters |
| Generators | 42 | One building | Mississippi Department of Environmental Quality |
| Generators | the permit lists Buildings 1 through 10, each with the same 42 emergency generators | Whole campus | Mississippi Department of Environmental Quality |
| Generators | Ten buildings, each with 42 emergency generators: forty 2,000 kW gensets (Caterpillar 3516C), one 800 kW and one 500 kW | Whole campus | Mississippi Department of Environmental Quality |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Compass Datacenters | Developer | Compass Datacenters | |
| Mississippi Power | Energy partner | Compass Datacenters | |
| Corderill LLC | Tenant | Mississippi Development Authority | |
| Caterpillar | Trade contractor | Mississippi Department of Environmental Quality |
General contractor: Not found in the sources consulted.
Milestones
| Date | Milestone | Source |
|---|---|---|
| June 24, 2026 | Mississippi Department of Environmental Quality | |
| June 24, 2026 | Mississippi Department of Environmental Quality | |
| November 2026 | Compass tied a Meridian community event to the commissioning of the campus's first building. | Compass Datacenters |
About the campus
Compass Datacenters' Meridian campus in Lauderdale County, Mississippi is planned as an eight-building, eight-year development with Mississippi Power supplying about 500 MW to the site. Compass's own November 2026 release ties a community event to the commissioning of the campus's first building, so the campus should be tracked as partly in service rather than a single uncompleted site.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Compass Datacenters Makes One-Time $5 Million Gift to Meridian's Public Schools, Compass Datacenters, 10 Nov 2026. Consulted 19 Nov 2026.
- Compass Project Generates $10B Investment in Lauderdale County, Compass Datacenters, 9 Jan 2025. Consulted 19 Nov 2026.
- Data Center Markets, Compass Datacenters. Consulted 19 Nov 2026.
- Technology company Corderill investing at least $100 million in Meridian, Mississippi Development Authority, 22 Apr 2026. Consulted 20 Nov 2026.
- Air Construction Permit No. 1460-00133, Compass Datacenters JAN I, LLC (Draft/Proposed, February 18, 2026), Mississippi Department of Environmental Quality, 18 Feb 2026. Consulted 20 Nov 2026.
- enSearch Online facility details, Compass Datacen (AI 87959), Mississippi Department of Environmental Quality. Consulted 20 Nov 2026.
- Meridian I-20/59 Industrial Park (site flyer, last updated 11/14/2023), Mississippi Power (mississippipowered.com site listing), 13 May 2024. Consulted 20 Nov 2026.
- Air Pollution Control Permit to Construct Air Emissions Equipment No. 1460-00133, Compass Datacenters JAN I, LLC (issued June 24, 2026), Mississippi Department of Environmental Quality, 24 Jun 2026. Consulted 20 Nov 2026.
- Parcels owned by Compass Datacenters JAN I and JAN IA to IH LLC, Lauderdale County, Mississippi parcel layer (ArcGIS Online feature service LauderdaleService, layer 9 Parcels). Consulted 20 Nov 2026.