Research record, fact-checked

DataBank IAD5, Culpeper

Location
Culpeper, Culpeper County, VA, United States. Site address: 14601 Germanna Hwy, Culpeper, VA 22701. See it on the map, in 3D
Stage
Stage not confirmed: Not found in the sources consulted (DataBank). DataBank describes IAD5 as the first data center to be built on the Culpeper campus and gives no date for the start of works.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
OwnerDataBank
TypeColocationDataBank
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
72 MW, plannedIT capacity (power for the computing equipment)One building2026DataBank
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Floor area of one building229,932 sq ftOne buildingDataBank
Rack density45 kW/rackOne buildingDataBank
Rack density100 kW/rackOne buildingDataBank
CoolingnullOne buildingDataBank
Buildings under construction2Whole campusDataBank (republishing the Culpeper Star-Exponent)
Floor area1,300,000 sq ftWhole campusDataBank (republishing the Culpeper Star-Exponent)
Site area85 acresWhole campusDataBank (republishing the Culpeper Star-Exponent)
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
DataBankOwnerDataBank
Companies named by the operator, the developer, a filing or a government, each with its role

General contractor: Not found in the sources consulted.

About the campus

IAD5 is the first data center DataBank plans on its new Culpeper campus at 14601 Germanna Hwy, Culpeper, Virginia, with 72 MW of critical IT load and 229,932 square feet of IT space. DataBank describes N+1 power and cooling with rack densities over 45 kW per cabinet in air cooling and over 100 kW per cabinet in liquid cooling.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.