Research record, fact-checked
Manassas hyperscale data centers (2 x 96MW)
- Location
- Manassas, Prince William County, VA, United States. Site address: 10050 and 10051 Brickyard Way, Manassas, VA 20110 (Prince William County). See it on the map, in 3D
- Stage
- Under construction, as of June 2026 (Digital Realty Trust, Inc.). Digital Realty's SEC filing describes remaining capex to complete the ongoing development and future stabilization dates
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owner | Digital Realty | |
| Type | Leased hyperscale campuses | Digital Realty Trust, Inc. |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 96 MW | IT capacity (power for the computing equipment) | One building | June 2026 | Digital Realty Trust, Inc. |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$3.5 bn | Financing | Several sites | June 29, 2026 | Digital Realty Trust, Inc.Covers the whole three-building portfolio (two Manassas buildings plus the Sterling building), not only Manassas |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Digital Realty | Owner | Digital Realty Trust, Inc. | |
| Blackstone | Financing | Selling its interest | Digital Realty Trust, Inc. |
General contractor: Not found in the sources consulted.
Milestones
| Date | Milestone | Source |
|---|---|---|
| June 29, 2026 | Digital Realty agrees to purchase Blackstone's interest in the Manassas and Sterling data centers | Digital Realty Trust, Inc. |
| June 2027 (planned) | Two of the data centers expected to stabilize in the first half of 2027 | Digital Realty Trust, Inc. |
About the campus
Digital Realty agreed in June 2026 to purchase Blackstone's interest in two 96MW hyperscale data centers in Manassas, Virginia, part of a three-building portfolio that also includes one 96MW building on the Digital Dulles campus in Sterling. The buildings are 100 percent leased to three distinct investment-grade hyperscale customers; two are expected to stabilize in the first half of 2027 and the third in the first half of 2028, with the filing noting remaining capex to complete the ongoing development.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Form 8-K, Exhibit 99.1: Digital Realty Announces Purchase of Blackstone Interest in Three Northern Virginia Data Centers, Digital Realty Trust, Inc., 29 Jun 2026. Consulted 19 Nov 2026.
- Form 8-K (June 29, 2026), Digital Realty Trust, Inc., 29 Jun 2026. Consulted 20 Nov 2026.
- Parcels (OpenData/OpenData MapServer, layer 0): Brickyard Way, Prince William County, Virginia. Consulted 20 Nov 2026.
- VA_Address_Points (VA_Base_Layers FeatureServer, layer 0): Brickyard Way, Virginia Geographic Information Network (VGIN), Virginia Department of Emergency Management. Consulted 20 Nov 2026.