Research record, fact-checked

EdgeCore Ashburn Campus

Location
Sterling, Loudoun County, VA, United States. Site address: AS01: 45831 Maries Road, Sterling, VA; AS02: 22425 Sous Vide Lane, Sterling, VA (Moran Road Limited subdivision). See it on the map, in 3D
Stage
Stage not confirmed: Not found in the sources consulted (Loudoun County, Virginia). EdgeCore secured construction financing for AS01 and AS02 in April 2026 and scheduled the first occupancy of AS01 for November 2026; it gives no date for the start of works.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperEdgeCore Digital Infrastructure
TypeLeased hyperscale campusesEdgeCore Digital Infrastructure
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
114 MW, plannedIT capacity (power for the computing equipment)Whole campusApril 2026EdgeCore Digital Infrastructure
Capacity figures, each with what it measures

Investment and financing

An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
US$1.5 bnFinancingWhole campusApril 2026EdgeCore Digital InfrastructureConstruction financing for AS01 and AS02 together.
Amounts, each with its kind and scope

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all2Whole campusEdgeCore Digital Infrastructure
Floor area685,000 sq ftWhole campusEdgeCore Digital Infrastructure
CoolingAir cooled chillers, with flexible design supporting air-cooled and direct-to-chip liquid-cooled serversWhole campusEdgeCore Digital Infrastructure
Floor area of one building416,100 sq ftOne buildingLoudoun County, Virginia
Floor area of one building246,630 sq ftOne buildingLoudoun County, Virginia
Stories3One buildingLoudoun County, Virginia
GeneratorsAS02 first-floor data hall: 8 new generators, 8 MV transformers and 12 rooftop chillersOne phaseLoudoun County, Virginia
GeneratorsAS01: 14 generator fuel tanks (7 belly and 7 day tanks), 77,000 gallons in totalOne buildingLoudoun County, Virginia
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
EdgeCore Digital InfrastructureDeveloperEdgeCore Digital Infrastructure
Apterra Infrastructure Capital, LLCFinancingEdgeCore Digital Infrastructure
Global Infrastructure Partners (GIP)FinancingPart of BlackRockEdgeCore Digital Infrastructure
ING Capital LLCFinancingEdgeCore Digital Infrastructure
Dominion EnergyEnergy partnerEdgeCore Digital Infrastructure
Holder ConstructionGeneral contractorEdgeCore names Holder Construction as its partner for the tradespeople building its data centers at its campuses in Phoenix, Silicon Valley, Ashburn and Reno (May 2025).EdgeCore Digital Infrastructure
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
December 10, 2024Loudoun County issues AS01's grading permit for a data center with parking lot and utilities at 45865 Maries RoadLoudoun County, Virginia
February 26, 2025Loudoun County issues AS01's core and shell building permit (416,100 square feet, with a 24 MW third-floor data center build-out)Loudoun County, Virginia
August 29, 2025Loudoun County issues AS02's core and shell and foundation building permit (246,630 square feet, 28 MW of power)Loudoun County, Virginia
February 26, 2026Loudoun County issues the tenant fit-out permit for three data halls and offices of AS01, about 107,583 square feetLoudoun County, Virginia
April 21, 2026EdgeCore secures $1.5 billion of construction financing for AS01 and AS02EdgeCore Digital Infrastructure
November 2026 (planned)Initial occupancy of AS01 scheduledEdgeCore Digital Infrastructure
July 2027 (planned)Initial occupancy of AS02 scheduledEdgeCore Digital Infrastructure
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

AS01 and AS02 are two single-tenant, fully leased EdgeCore data centers less than two miles apart, on Maries Road and Moran Road in Sterling, Virginia, together rated at 114 MW of critical load across 685,000 square feet. EdgeCore secured $1.5 billion of construction financing on April 21, 2026 from Apterra, Global Infrastructure Partners and ING Capital, with AS01 occupancy scheduled for November 2026 and AS02 for July 2027.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.