Research record, fact-checked

Aligned IAD-04, Frederick

Location
Frederick, MD, United States. Site address: 5601 Manor Woods Road, Frederick, MD 21703. See it on the map, in 3D
Stage
Under construction, as of March 2026 (Turner Construction Company). Turner, Aligned's general contractor, announced on March 9, 2026 the topping out of the IAD-06 building in Frederick, fewer than five months after breaking ground.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
DeveloperAligned Data Centers
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
72 MWCapacity, its measure not stated by the sourceOne buildingTurner Construction Company
Capacity figures, each with what it measures

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Site area75 acresWhole campusAligned Data Centers
CoolingDelta3 air cooling arrays in dedicated mechanical galleries, with secondary loops for DeltaFlow liquid coolingWhole campusAligned Data Centers
Generators3 MW back-up generatorsOne buildingAligned Data Centers
Floor area of one building450,000 sq ftOne buildingTurner Construction Company
Stories2One buildingTurner Construction Company
Coolinghigh-efficiency hybrid cooling integrating liquid- and air-cooled technologiesOne buildingTurner Construction Company
Floor area1,149,000 sq ftOne phaseFrederick County Planning Commission
Site area74.89 acresWhole campusFrederick County Planning Commission
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
Aligned Data CentersDeveloperAligned Data Centers
Turner Construction CompanyGeneral contractorGeneral contractor for the IAD-06 building at Frederick, topped out in March 2026.Turner Construction Company
Rodgers Consulting, Inc.DesignEngineer named for Aligned's 2023 water and sewer plan amendment for the 74.9-acre parcel.Frederick County Division of Planning and Permitting
Aligned Data Centers (MD) PropCo, LLCOwnerFrederick County Division of Planning and Permitting
Companies named by the operator, the developer, a filing or a government, each with its role

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
May 10, 2023Frederick County Division of Planning and Permitting
May 14, 2025Frederick County Planning Commission
March 9, 2026Turner Construction Company
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Aligned Data Centers is building its Frederick, Maryland campus on a 74.89-acre parcel at 5601 Manor Woods Road, inside the former Alcoa Eastalco Works. Turner Construction, its general contractor, topped out the two-story, 450,000 square foot IAD-06 building, a 72 MW facility, in March 2026, fewer than five months after breaking ground. In May 2025 Frederick County's Planning Commission took up a site plan for three additional buildings totaling 1,149,000 square feet on the same parcel.

  • IAD-04: Building 1 (IAD-04) of the Quantum Frederick campus
  • IAD-06: A building at the Quantum Frederick campus, distinct from IAD-04

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.