Research record, fact-checked
Project Phoenix
- Location
- Shippingport, PA, United States. Site address: Church Lane, Shippingport, PA 15077 (Shippingport Borough, Beaver County). See it on the map, in 3D
- Stage
- Under construction, as of September 2026 (Aligned Data Centers). Aligned's own press release, dated September 10, 2026, announces the groundbreaking of the campus.
- Status
- Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
- Research as of
Who, how big, how much
| Field | Value | Source |
|---|---|---|
| Owners and developers | Aligned Data Centers, Aligned.AI PA Owner | |
| Type | Leased hyperscale campuses | |
| Amount | Not found in the sources consulted |
Capacity
Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.
| Capacity | What it measures | Scope | As of | Source |
|---|---|---|---|---|
| 2,000 MW, planned | Capacity, its measure not stated by the source | Whole campus | September 2026 | Aligned Data Centers |
Investment and financing
An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| About US$10 bn | Announced investment in the region | Whole campus | September 2026 | Aligned Data CentersStated as regional economic investment anchored by the project, not a company construction cost. |
Buildings and site
| Field | Value | Scope | Source |
|---|---|---|---|
| Buildings, in all | 3 | Whole campus | Aligned Data Centers |
| Generators | eight 4,680 hp diesel-fired emergency generator engines and three 1,483 hp diesel-fired emergency generator engines, plus one 175 bhp diesel-fired fire pump engine and sixty-four 100 bhp temporary generators (proposed sources in the air quality plan approval) | Whole campus | Pennsylvania Department of Environmental Protection (Pennsylvania Bulletin) |
| On-site generation | Solid oxide fuel cells and four 7.25 MMBtu/hr natural gas-fired line heaters among the proposed sources of the air quality plan approval | Whole campus | Pennsylvania Department of Environmental Protection (Pennsylvania Bulletin) |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Aligned Data Centers | Developer | Aligned Data Centers | |
| Aligned.AI PA Owner | Owner | Applicant of the air quality plan approval for the Shippingport Data Center, 2800 Summit Avenue, Plano, TX. | Pennsylvania Department of Environmental Protection (Pennsylvania Bulletin) |
| Aligned Data Centers (PIT) Propco, LLC | Owner | Pennsylvania Department of Environmental Protection (Pennsylvania Bulletin) |
General contractor: Not found in the sources consulted.
Milestones
| Date | Milestone | Source |
|---|---|---|
| September 2026 | Aligned announced the groundbreaking of Project Phoenix in Shippingport, Pennsylvania. | Aligned Data Centers |
About the campus
Project Phoenix is Aligned Data Centers' planned data center campus in the Shippingport Industrial Park, Pennsylvania, next to the former Shippingport Power Station. Aligned announced the groundbreaking on September 10, 2026, for a campus designed for 2 GW of power across three facilities, anchoring an estimated $10 billion in regional economic investment.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.
Sources
- Project Phoenix Data Center Campus Breaks Ground, Aligned Data Centers, 10 Sep 2026. Consulted 19 Nov 2026.
- Applications, Actions and Special Notices, Southwest Region: Air Quality Program, PA-04-00953A: Aligned.AI PA Owner (Pa.B. vol. 56, no. 44), Pennsylvania Department of Environmental Protection (Pennsylvania Bulletin), 31 Oct 2026. Consulted 20 Nov 2026.
- Actions taken under the Clean Streams Law, NPDES stormwater discharges associated with construction activities, PAC040198: Aligned Data Centers (PIT) Propco, LLC (Pa.B. vol. 56, no. 35, Doc. No. 26-1251), Pennsylvania Department of Environmental Protection (Pennsylvania Bulletin), 29 Aug 2026. Consulted 20 Nov 2026.
- Shippingport Data Center: Project Phoenix Breaks Ground, Aligned Data Centers. Consulted 20 Nov 2026.