Research record, fact-checked

Project Phoenix

Location
Shippingport, PA, United States. Site address: Church Lane, Shippingport, PA 15077 (Shippingport Borough, Beaver County). See it on the map, in 3D
Stage
Under construction, as of September 2026 (Aligned Data Centers). Aligned's own press release, dated September 10, 2026, announces the groundbreaking of the campus.
Status
Research record, fact-checked: compiled from the primary sources below (the operator, the developer, filings, governments and utilities), each fact checked against its source on 20 Nov 2026; an editor has not yet reviewed it.
Research as of

Who, how big, how much

Sourced facts of the campus
FieldValueSource
Owners and developersAligned Data Centers, Aligned.AI PA Owner
TypeLeased hyperscale campuses
AmountNot found in the sources consulted
Sourced facts of the campus

Capacity

Each figure as its source states it. Megawatts of IT capacity (the power available to the computing equipment), of power supplied to the site and of generation measure different things and are never added together; a campus figure is not a building's.

Capacity figures, each with what it measures
CapacityWhat it measuresScopeAs ofSource
2,000 MW, plannedCapacity, its measure not stated by the sourceWhole campusSeptember 2026Aligned Data Centers
Capacity figures, each with what it measures

Investment and financing

An announced investment, a construction loan, a public incentive and a regional programme are different objects: each is listed with what it covers, never added to another.

Amounts, each with its kind and scope
AmountWhat it isScopeAs ofSource
About US$10 bnAnnounced investment in the regionWhole campusSeptember 2026Aligned Data CentersStated as regional economic investment anchored by the project, not a company construction cost.
Amounts, each with its kind and scope

Buildings and site

The campus's buildings, land and plant, as their sources describe them
FieldValueScopeSource
Buildings, in all3Whole campusAligned Data Centers
Generatorseight 4,680 hp diesel-fired emergency generator engines and three 1,483 hp diesel-fired emergency generator engines, plus one 175 bhp diesel-fired fire pump engine and sixty-four 100 bhp temporary generators (proposed sources in the air quality plan approval)Whole campusPennsylvania Department of Environmental Protection (Pennsylvania Bulletin)
On-site generationSolid oxide fuel cells and four 7.25 MMBtu/hr natural gas-fired line heaters among the proposed sources of the air quality plan approvalWhole campusPennsylvania Department of Environmental Protection (Pennsylvania Bulletin)
The campus's buildings, land and plant, as their sources describe them

Companies and their roles

Companies named by the operator, the developer, a filing or a government, each with its role
CompanyRoleNoteSource
Aligned Data CentersDeveloperAligned Data Centers
Aligned.AI PA OwnerOwnerApplicant of the air quality plan approval for the Shippingport Data Center, 2800 Summit Avenue, Plano, TX.Pennsylvania Department of Environmental Protection (Pennsylvania Bulletin)
Aligned Data Centers (PIT) Propco, LLCOwnerPennsylvania Department of Environmental Protection (Pennsylvania Bulletin)
Companies named by the operator, the developer, a filing or a government, each with its role

General contractor: Not found in the sources consulted.

Milestones

Dated milestones, at the precision of their source; a planned date is marked as such
DateMilestoneSource
September 2026Aligned announced the groundbreaking of Project Phoenix in Shippingport, Pennsylvania.Aligned Data Centers
Dated milestones, at the precision of their source; a planned date is marked as such

About the campus

Project Phoenix is Aligned Data Centers' planned data center campus in the Shippingport Industrial Park, Pennsylvania, next to the former Shippingport Power Station. Aligned announced the groundbreaking on September 10, 2026, for a campus designed for 2 GW of power across three facilities, anchoring an estimated $10 billion in regional economic investment.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the campus's land, its buildings with their mapped heights, its substations and the power lines around it, with the published figures on its card. What no map or source gives (a hall's height where none is tagged, the rooftop plant, the generator yards) is drawn as typical equipment and listed as illustrative under the model. Open the campus in 3D.

Sources

See it on the map. How the map is made.