North American transit and bridge projects, on one map

Mirage Metrics maps 39 transit, bridge and tunnel projects in Canada and the United States, from planning to recent openings. For each one you can see who owns it, how it is delivered, which consortium builds it, what budget was announced, where it stands and what is dated next. Every fact comes from the owner, the procurement agency, a government or the companies themselves, and links to its source on the project's page.

Published
Updated
Reading time
Reference
Written by
Jules Toussaint

Public facts only, as the owners and companies published them, with no forecast and no judgement of any project. Last updated November 10, 2026. The data is free to reuse under CC BY 4.0.

Explore the projects

39 of 39 projects

All 39 projects

This list holds the same projects as the explorer above, as text: 24 in Canada and 15 in the United States. Each name opens the project's page, with its contracts, its teams, its dated milestones and the source of every fact.

Canada: 24 projects. Compiled by Mirage Metrics, November 2026
ProjectWhereTypeStageOwnerDeliveryNext milestone
Broadway SubwayVancouver, British ColumbiaTransitConstructionProvince of British Columbia, Transportation Investment Corporationdesign-build-finance2027: Scheduled to open for passenger service in fall 2027
Calgary Green Line LRT (Phase 1)Calgary, AlbertaTransitConstructionCity of Calgarymultiple construction contracts (City-delivered)
Eglinton Crosstown LRT (Line 5 Eglinton)Toronto, OntarioTransitCompletedMetrolinx, Infrastructure OntarioP3 (DBFM)
Eglinton Crosstown West ExtensionToronto and Mississauga, OntarioTransitConstructionMetrolinx, Infrastructure OntariomixedMarch 2027: Stations, rail and systems development phase completed (anticipated in fiscal 2026-27)
Finch West LRT (Line 6 Finch West)Toronto, OntarioTransitCompletedMetrolinx, Infrastructure OntarioP3 (DBFM)
Fraser River Tunnel (George Massey Tunnel replacement)Richmond and Delta, British ColumbiaTunnelProcurementProvince of British Columbiaseveral procurement packages2026: Environmental Assessment Office review expected to conclude before the end of 2026
GO Expansion On-Corridor WorksGreater Toronto and Hamilton Area, OntarioTransitConstructionMetrolinx, Infrastructure Ontarioprogressive contractsMarch 2027: First GO trains fitted with ETCS Level 2 equipment (planned in fiscal 2026-27)
Gordie Howe International BridgeWindsor, Ontario, Canada, and Detroit, Michigan, United StatesBridgeCompletedWindsor-Detroit Bridge AuthorityP3 (DBFOM)
Hamilton LRTHamilton, OntarioTransitDevelopment phaseMetrolinxallianceMarch 2027: Utility relocation enabling works completed (expected by the end of fiscal 2026-27)
Hazel McCallion Line (Hurontario LRT)Mississauga and Brampton, OntarioTransitConstructionMetrolinx, Infrastructure OntarioP3 (DBFOM)March 2027: Systems installation from Gateway Terminal to Cooksville, vehicle burn-in and system site integration tests completed (expected in fiscal 2026-27)
Île-aux-Tourtes Bridge reconstructionVaudreuil-Dorion and Senneville, QuébecBridgeConstructionMinistère des Transports et de la Mobilité durable du Québecdesign-build-finance2026: First structure scheduled to open in late 2026, with five lanes managed according to peak traffic
Montréal Metro Blue Line extensionMontréal, QuébecTransitConstructionSociété de transport de Montréal
New Île d'Orléans BridgeQuébec City and Île d'Orléans, QuébecBridgeConstructionMinistère des Transports et de la Mobilité durable du Québecdesign-build
Ontario LineToronto, OntarioTransitConstructionMetrolinx, Infrastructure OntariomixedMarch 2027: Second pair of tunnel boring machines, for the tunnels under Pape Avenue, delivered and assembled (planned in fiscal 2026-27)
Ottawa O-Train Stage 2Ottawa, OntarioTransitConstructionCity of OttawaP3 (DBF and DBFM)2027: West extension (Lines 1 and 3) handover to the City anticipated in Q2 2027, then preparation for passenger service in Q3
Pattullo Bridge replacement (stal̕əw̓asəm Bridge)New Westminster and Surrey, British ColumbiaBridgeConstructionProvince of British Columbia, Transportation Investment Corporationdesign-build
QEW Garden City Skyway Bridge TwinningSt. Catharines and Niagara-on-the-Lake, OntarioBridgeDevelopment phaseOntario Ministry of Transportation, Infrastructure Ontarioprogressive design-build2027: Construction start
Réseau express métropolitain (REM)Greater Montréal, QuébecTransitConstructionCDPQ InfraEPC and RSSOM contracts2027: Airport branch to Montréal-Trudeau International Airport scheduled to open
Scarborough Subway ExtensionToronto, OntarioTransitConstructionMetrolinx, Infrastructure Ontariomixed
Surrey Langley SkyTrainSurrey and Langley, British ColumbiaTransitConstructionProvince of British Columbia, Transportation Investment Corporationmixed
TramCité (Québec City tramway)Québec City, QuébecTransitDevelopment phaseGouvernement du Québec, CDPQ Infraco-development (target price)2027: Target price and schedule set at the end of the planning phase
TRAMGO (Gatineau-Ottawa tramway)Gatineau, Québec, and Ottawa, OntarioTransitPlanningMobilité Infra QuébecNovember 30, 2026: Mobilité Infra Québec submits its final recommendations
Valley Line West LRTEdmonton, AlbertaTransitConstructionCity of Edmontondesign, build and partially finance2028: Construction anticipated to be complete, followed by testing and commissioning before opening
Yonge North Subway ExtensionToronto, Markham, Vaughan and Richmond Hill, OntarioTransitConstructionMetrolinx, Infrastructure OntariomixedMarch 2027: Stations, rail and systems alliance partners selected and development phase begun (anticipated in fiscal 2026-27)
Canada: 24 projects. Compiled by Mirage Metrics, November 2026
United States: 15 projects. Compiled by Mirage Metrics, November 2026
ProjectWhereTypeStageOwnerDeliveryNext milestone
BART Silicon Valley Phase IISan José and Santa Clara, CaliforniaTransitConstructionSanta Clara Valley Transportation Authoritydesign-build
Brent Spence Bridge CorridorCovington, Kentucky, and Cincinnati, OhioBridgeConstructionKentucky Transportation Cabinet, Ohio Department of Transportationdesign-build
CTA Red Line ExtensionChicago, IllinoisTransitDevelopment phaseChicago Transit Authoritydesign-build
East San Fernando Valley Light Rail TransitVan Nuys Boulevard, San Fernando Valley, Los Angeles County, CaliforniaTransitConstructionLos Angeles County Metropolitan Transportation Authority
Frederick Douglass Tunnel ProgramBaltimore, MarylandTunnelConstructionAmtrakmultiple contracts (tunnel by construction manager at-risk)
Hampton Roads Bridge-Tunnel ExpansionHampton and Norfolk, VirginiaTunnelConstructionVirginia Department of Transportationdesign-build
Hudson Tunnel ProjectUnder the Hudson River, between New Jersey and Manhattan, New YorkTunnelConstructionGateway Development Commission
I-10 Calcasieu River BridgeLake Charles, LouisianaBridgeDevelopment phaseState of LouisianaP3 (design-build with 50 years of operations and maintenance)
Interstate Bridge Replacement ProgramVancouver, Washington, and Portland, OregonBridgeProcurementOregon Department of Transportation, Washington State Department of Transportationprogressive design-build (bridge)2027: Progressive design-builder selected (mid-2027), with construction to start in 2028
LA Metro D Line Subway ExtensionLos Angeles, CaliforniaTransitConstructionLos Angeles County Metropolitan Transportation Authority
Portal North BridgeHackensack River, New JerseyBridgeConstructionNJ TRANSIT, Amtrakcompetitive bid (invitation for bid)
Purple Line (Maryland)Bethesda to New Carrollton, Montgomery and Prince George's counties, MarylandTransitConstructionMaryland Transit AdministrationP32027: Opening for service, planned for winter 2027 (announcement of March 2024)
Second Avenue Subway Phase 2East Harlem, Manhattan, New York City, New YorkTransitConstructionMetropolitan Transportation Authoritymultiple contracts2027: Tunnel boring begins
SR 400 Express LanesFulton and Forsyth counties, metro Atlanta, GeorgiaHighwayConstructionGeorgia Department of Transportation, State Road and Tollway AuthorityP3
West Seattle Link ExtensionSeattle, WashingtonTransitPlanningSound Transit
United States: 15 projects. Compiled by Mirage Metrics, November 2026

Largest budgets, companies on several projects, next milestones

The tables below read the same data three ways. Budgets are compared within one currency only, and as each owner stated them (a total project cost, a capital budget or a contract value, as the basis column says). The budget lists therefore rank announcements, not final costs.

Largest announced budgets, Canadian dollars. Compiled by Mirage Metrics, November 2026
ProjectBudgetBasisAs of
Ontario LineC$29.8 billionMetrolinx current baseline less exclusions, in year-of-expenditure dollars; includes 30-year financing, lifecycle, operations and maintenance of the RSSOM contract and omits progressive-contract scope not yet in its implementation phase, so Metrolinx notes it is not the full project costJune 30, 2026
Scarborough Subway ExtensionC$10.2 billionMetrolinx current baseline less exclusions, in year-of-expenditure dollarsJune 30, 2026
Eglinton Crosstown LRT (Line 5 Eglinton)C$9.1 billionDBFM contract value including inflation (stated by Infrastructure Ontario as $8.25 billion, or $9.1 billion including inflation)November 2015
Fraser River Tunnel (George Massey Tunnel replacement)C$8.5 billionupdated total project budget (federal contribution of up to $3 billion in capital costs)July 2026
Réseau express métropolitain (REM)C$8.3 billiontotal construction cost2026
TRAMGO (Gatineau-Ottawa tramway)C$8 billionorder-of-magnitude investment for a route of about 24 km, from an independent estimateJune 2026
Montréal Metro Blue Line extensionC$7.6 billiontotal cost, Québec and partner contributions, in the Plan québécois des infrastructures 2026-2036March 2026
Calgary Green Line LRT (Phase 1)C$6.2 billionPhase 1 funding commitments from the City of Calgary, the Province of Alberta and the Government of Canada
Largest announced budgets, Canadian dollars. Compiled by Mirage Metrics, November 2026
Largest announced budgets, US dollars. Compiled by Mirage Metrics, November 2026
ProjectBudgetBasisAs of
Hudson Tunnel ProjectUS$16 billiontotal commitment needed to complete the projectJuly 2024
SR 400 Express LanesUS$10.8 billionapproximate project valueApril 2026
Second Avenue Subway Phase 2US$7 billionproject budgetAugust 2025
Frederick Douglass Tunnel ProgramUS$6 billionapproximate total program costFebruary 2024
Interstate Bridge Replacement ProgramUS$5.7 billionavailable funding (state contributions, federal grants and future tolling) backing the first construction phaseAugust 2026
CTA Red Line ExtensionUS$5.3 billionoverall project budget, including financing expensesAugust 2024
Hampton Roads Bridge-Tunnel ExpansionUS$3.9 billiontotal project costNovember 2026
I-10 Calcasieu River BridgeUS$2.3 billiontotal project valueAugust 2024
Largest announced budgets, US dollars. Compiled by Mirage Metrics, November 2026
Companies named on more than one project in this dataset. Compiled by Mirage Metrics, November 2026
CompanyProjectsWhere
Aecon Concessions5Eglinton Crosstown LRT (Line 5 Eglinton), Eglinton Crosstown West Extension, Finch West LRT (Line 6 Finch West), GO Expansion On-Corridor Works, Yonge North Subway Extension
Aecon Infrastructure Management Inc.5Eglinton Crosstown LRT (Line 5 Eglinton), Eglinton Crosstown West Extension, GO Expansion On-Corridor Works, Scarborough Subway Extension, Yonge North Subway Extension
Dragados Canada Inc.5Eglinton Crosstown LRT (Line 5 Eglinton), Eglinton Crosstown West Extension, Finch West LRT (Line 6 Finch West), Réseau express métropolitain (REM), Surrey Langley SkyTrain
Acciona Infrastructure Canada Inc.4Broadway Subway, Eglinton Crosstown West Extension, Ontario Line, Surrey Langley SkyTrain
Fomento de Construcciones y Contratas Canada Ltd.4GO Expansion On-Corridor Works, Ontario Line, Scarborough Subway Extension, Yonge North Subway Extension
ACS Infrastructure Canada Inc.3Eglinton Crosstown LRT (Line 5 Eglinton), Finch West LRT (Line 6 Finch West), Gordie Howe International Bridge
EXP Services Inc.3Eglinton Crosstown West Extension, Hazel McCallion Line (Hurontario LRT), Yonge North Subway Extension
Ghella Canada Ltd.3Broadway Subway, Eglinton Crosstown West Extension, Yonge North Subway Extension
WSP Canada Inc.3Eglinton Crosstown West Extension, GO Expansion On-Corridor Works, Ontario Line
ACCIONA2I-10 Calcasieu River Bridge, SR 400 Express Lanes
Aecon2GO Expansion On-Corridor Works, Gordie Howe International Bridge
Aecon O&M2Finch West LRT (Line 6 Finch West), GO Expansion On-Corridor Works
Companies named on more than one project in this dataset. Compiled by Mirage Metrics, November 2026
Milestones dated publicly between November 2026 and February 2027. Compiled by Mirage Metrics, November 2026
DateProjectMilestone
November 30, 2026TRAMGO (Gatineau-Ottawa tramway)Mobilité Infra Québec submits its final recommendations
January 2027QEW Garden City Skyway Bridge TwinningDesign phase planned to end
Milestones dated publicly between November 2026 and February 2027. Compiled by Mirage Metrics, November 2026

About this map

The map covers the transit (subway, light rail, automated light metro, commuter rail), bridge and tunnel projects, and the major highway structures, that a large heavy civil contractor or a consortium would bid. It includes projects in planning, in procurement, in a development phase or under construction on November 10, 2026, and the ones opened since 2024. It is a working list, not a census. A project is added once its owner has published enough to describe it, and the dataset says what was left out and why.

  • Owners and delivery models are named as the owner names them: P3 (DBFM), progressive design-build, alliance, design-build, design-bid-build.
  • Teams and roles are the ones the award announcement gives (builder, designer, systems, operations and maintenance, equity), member by member.
  • Each budget gives the amount, currency, basis and date of the owner's latest statement. Two figures for one project are not mixed.
  • Milestones are dated only as precisely as the source dates them: a year, a month or a day.

Mirage Metrics builds AI agents for heavy civil estimating and preconstruction: quantities measured from each design package and tied to their drawing, changes between packages, and bid documents checked against each other. This map is published as a reference for the people who bid and build these projects, and it says nothing about any work by Mirage Metrics. Where a project's builder is one of the companies Mirage Metrics names among its clients (Skyway Bridging Partners), the project's page says so and nothing more. For the vocabulary used here, see the guides on project delivery methods, AACE estimate classes, P3 project agreements and why estimates grow between design stages.

To report an error, write to mehdi@miragemetrics.com with a public source. Corrections follow the editorial policy.

The dataset

The dataset has one row per project. Each row gives the project's name and place, type and stage, owners, delivery model, the announced budget with its basis and date, the length where an owner gives one, every contract with its team and members, the next dated milestone, the coordinates used on the map, the page on this site and the source links. The file is regenerated from the same records as these pages at each update.

Creative Commons Attribution 4.0: credit Mirage Metrics and link this page.

Questions readers ask

  • The facts on this map come from the owners, the procurement agencies, the governments and the companies themselves: project pages, procurement notices, award releases, budget documents and the consortium members' own announcements. Every fact on a project's page links to the document it comes from and gives that document's date. A fact found only in the press is left out.

  • The map is kept current project by project: each project carries the date it was last checked, and the newest is November 10, 2026. A project is re-checked when its owner announces a shortlist, an award, a financial close or an opening, and its date moves with it. Budgets are shown as the owner stated them, with the date of that statement, not as a forecast.

  • Yes, you can reuse the data: the whole dataset is a CSV file under the Creative Commons Attribution 4.0 licence. You can chart it and publish it, with a credit to Mirage Metrics and a link to this page.

  • The map describes these projects from public sources and says nothing about any work by Mirage Metrics on them. Where a project's builder is a company Mirage Metrics names among its clients, the project's page says so and nothing more. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams, and it publishes the map as a reference, not as a list of deployments.

  • To report an error or a missing project, write to mehdi@miragemetrics.com with the project, the fact and a public source for the correction. A verified correction is made on the project's page and its date is updated, as the editorial policy describes.

Bidding one of these projects?

Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing. Tell us what your estimating team spends its weeks on.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy