Calgary Green Line LRT (Phase 1)

Phase 1 of Calgary's Green Line is 17 kilometres of twin-track light rail and 11 stations, from Shepard in the southeast to downtown. The City of Calgary is delivering it through multiple construction contracts, with $6.248 billion in funding commitments. Construction of the SE Segment began in June 2025. In September 2026 Council approved an at-grade downtown alignment, which is now in a design phase of about one year. Compiled by Mirage Metrics from the owner's and the companies' own publications.

Published
Reading time
2 min
Written by
Mirage Metrics

Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#calgary-green-line.

At a glance

Calgary Green Line LRT (Phase 1) at a glance. Compiled by Mirage Metrics, November 2026
FieldValueSource
OwnerCity of Calgary
LocationCalgary, Alberta, Canada
TypeTransit, light rail
Delivery modelmultiple construction contracts (City-delivered)
Budget announcedC$6.2 billion, Phase 1 funding commitments from the City of Calgary, the Province of Alberta and the Government of CanadaCity of Calgary
Length17 kmCity of Calgary
StageConstruction
Calgary Green Line LRT (Phase 1) at a glance. Compiled by Mirage Metrics, November 2026

Contracts and teams

Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.

Calgary Green Line LRT (Phase 1): contracts and teams. Compiled by Mirage Metrics, November 2026
ContractDeliveryTeamMembers and rolesStatusDateSource
Elevated guideway at Barlow Trail and 114 Avenue S.E.GrahamawardedCity of Calgary
LRT bridge over Blackfoot TrailEllisDonawardedCity of Calgary
Maintenance and Storage Facility: foundational workPCL ConstructionawardedCity of Calgary
Maintenance and Storage Facility: structural steelSupreme SteelawardedCity of Calgary
Light rail vehicles (28)CAF (vehicle manufacturer)awardedCity of Calgary
Calgary Green Line LRT (Phase 1): contracts and teams. Compiled by Mirage Metrics, November 2026

Milestones

Calgary Green Line LRT (Phase 1): dated milestones. Compiled by Mirage Metrics, November 2026
DateMilestoneSource
June 26, 2025Groundbreaking: construction of the SE Segment beginsCity of Calgary
September 22, 2026Council approves an at-grade Downtown Segment along 10 Avenue S, from Event Centre/Grand Central Station to a station near 2 Street SWCity of Calgary
Calgary Green Line LRT (Phase 1): dated milestones. Compiled by Mirage Metrics, November 2026

Mirage Metrics and this project

This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.

If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.

Estimating a project like this one?

Mirage builds AI agents that measure quantities from each design package, track what moves between packages and check a bid's documents against each other, with every quantity tied to its drawing.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy