Calgary Green Line LRT (Phase 1)
Phase 1 of Calgary's Green Line is 17 kilometres of twin-track light rail and 11 stations, from Shepard in the southeast to downtown. The City of Calgary is delivering it through multiple construction contracts, with $6.248 billion in funding commitments. Construction of the SE Segment began in June 2025. In September 2026 Council approved an at-grade downtown alignment, which is now in a design phase of about one year. Compiled by Mirage Metrics from the owner's and the companies' own publications.
- Published
- Reading time
- 2 min
- Written by
- Mirage Metrics
Last checked November 9, 2026. Every fact below links to its source. You can also find the project on the map at /infrastructure-map#calgary-green-line.
At a glance
| Field | Value | Source |
|---|---|---|
| Owner | City of Calgary | |
| Location | Calgary, Alberta, Canada | |
| Type | Transit, light rail | |
| Delivery model | multiple construction contracts (City-delivered) | |
| Budget announced | C$6.2 billion, Phase 1 funding commitments from the City of Calgary, the Province of Alberta and the Government of Canada | City of Calgary |
| Length | 17 km | City of Calgary |
| Stage | Construction |
Contracts and teams
Each contract is listed as the owner or the team announced it, with the members and the role the announcement gives each one.
| Contract | Delivery | Team | Members and roles | Status | Date | Source |
|---|---|---|---|---|---|---|
| Elevated guideway at Barlow Trail and 114 Avenue S.E. | Graham | awarded | City of Calgary | |||
| LRT bridge over Blackfoot Trail | EllisDon | awarded | City of Calgary | |||
| Maintenance and Storage Facility: foundational work | PCL Construction | awarded | City of Calgary | |||
| Maintenance and Storage Facility: structural steel | Supreme Steel | awarded | City of Calgary | |||
| Light rail vehicles (28) | CAF (vehicle manufacturer) | awarded | City of Calgary |
Milestones
| Date | Milestone | Source |
|---|---|---|
| June 26, 2025 | Groundbreaking: construction of the SE Segment begins | City of Calgary |
| September 22, 2026 | Council approves an at-grade Downtown Segment along 10 Avenue S, from Event Centre/Grand Central Station to a station near 2 Street SW | City of Calgary |
Mirage Metrics and this project
This page describes the project from public sources only and says nothing about any work by Mirage Metrics. Mirage Metrics builds AI agents for heavy civil estimating and preconstruction teams. The agents measure quantities from each design package and tie them to their drawing, track what moves between packages, and check bid documents against each other. See AI for heavy civil estimating and the infrastructure map.
If something on this page is wrong or missing, write to mehdi@miragemetrics.com with a public source.
Sources and scope
Checked on .