AI for heavy civil estimating, from plan set to bid day

Mirage Metrics is the AI deployment partner heavy civil contractors and joint ventures bring into the estimating department for a pursuit. Our engineers set the agents up on your documents, and the quantities, the risk log and the leveled quotes reach your estimate before bid day.

The bid clock is the problem

On federal-aid highway work the advertisement runs at least three weeks (23 CFR 635.112). In that window, the estimators who should be pricing risk spend their days reading, counting and reconciling.

A bid package to read first

Plans, specifications and special provisions, geotechnical reports, DBE goals, Buy America requirements and the owner's bid form, all read before a single item is priced.

Scanned sheets

Older standard drawings and as-builts arrive scanned, and they still hold quantities the estimate needs.

Addenda late in the window

Each addendum moves sheets, quantities or clauses that are already priced, sometimes days before the letting.

Quotes in every shape

Subcontractor and supplier quotes come in their own formats, with their own exclusions, and have to be mapped to your scope before they can be compared.

What the agents do during a pursuit

Every output carries the sheet or the clause it came from, and goes where your estimators already work: HeavyBid, InEight or B2W through the interface each vendor documents, or Excel.

Plan set intake

Every sheet indexed, scanned ones included: discipline, sheet number, revision, addendum. Changes between issues are listed, not guessed.

Quantities on your bid items

Quantities mapped to the items or pay items of your bid schedule, each with its sheet, so an estimator checks a line against its sheet instead of measuring it again.

Addenda

Each addendum compared with the current set and the current quantities: what moved, what it touches, who needs to know.

Go/No-Go

Delivery method, bonding, DBE goal, schedule and specification risks summarized from the documents, in your Go/No-Go format. Your team makes the call.

Bid tabs after the letting

The owner's tabulation read against your estimate, item by item: where you were high, where you were low, what the low bidder priced differently. Kept for your unit-price history.

On the job you win

Change orders traced to the drawing, the clause and the quantity that created them; pay applications checked against the contract quantities and the approved changes.

How a pursuit sprint runs

We do not sell a licence and leave. Our engineers work with your pursuit team on one bid, judged on a number agreed at the start.

  1. Kick-off

    We take the plan set, the bid schedule, your scope sheets and your unit-price format. We agree the number the sprint is judged on, such as estimator hours on takeoff and spec review.

  2. First outputs

    One week after the first meeting, a proof of concept on your own sheets: the set indexed, first quantities on your bid items, a first risk log. Your estimators correct it.

  3. Through bid day

    Quantities, addenda, quotes and the risk log kept current as documents arrive. An engineer works with the team; your estimators stay in charge of the estimate.

  4. After the letting

    The owner's bid tabs read against your estimate, then a debrief with the chief estimator: what the agents got right, what they missed, what changes.

  5. Next pursuits

    If the number was met, the agents on every pursuit and the next workflow on the job you win. If not, you stop there.

What you send us

  • The plan set, scanned sheets included
  • Specifications, special provisions and addenda as they arrive
  • The bid schedule or pay-item list
  • Your scope sheets and unit-price format
  • Subcontractor and supplier quotes

What comes back

  • Quantities on your bid items, each with its sheet and revision
  • A risk log with the clause behind each line
  • Addenda compared with the current set
  • Leveled subcontractor and supplier quotes
  • A Go/No-Go summary in your format
  • The bid tabs read against your estimate

A fixed fee for the sprint, set once we have seen the plan set and the workflows you pick. After it, an annual subscription priced by volume, not per user.

Project types: what is measured, and what moves between packages

Transit and bridge work in North America is bid package by package. On each type, every quantity keeps the sheet and the revision it was measured on.

Map of major infrastructure projects in Canada and the United States276 major projects in Canada and the US, on one mapSee the infrastructure map

Manual takeoff, On-Screen Takeoff, Bluebeam Revu and Mirage on heavy civil work

Criteria only, no prices. The question on a heavy civil bid is less how a line is measured than what happens to it when the next package arrives.

Manual takeoff, On-Screen Takeoff, Bluebeam Revu and Mirage on heavy civil work
CriterionManual takeoffOn-Screen TakeoffBluebeam RevuMirage
Who measuresAn estimator, with a scale and a workbookAn estimator traces area, linear and count conditions on the plansAn estimator places length, area, volume and count markups on the PDFAn agent measures from the drawings and schedules; an estimator reviews
Where a quantity comes fromNotes in the workbookConditions on the plan page of the projectEach measurement is a markup on its page, tracked in the Markups ListEvery quantity carries its sheet and revision
A reissued packageMeasured againOverlay compares two plan versions in colour; the estimator updates the conditionsOverlay Pages or Compare Documents show what changed; the estimator updates the markupsBoth sets compared in full; the moved quantities listed with their sheets
Into the estimateTyped inExported to Quick Bid, Excel or CSVMarkups List summaries exported to a spreadsheetStructured against your bid items or pay items and exported to your estimating system
Earthworks volumesFrom separate earthwork softwareFrom an area and a thickness, not from a ground modelFrom an area and a depth, not from a ground modelCut and fill from a ground model stay in your earthwork and estimating software
Metric and imperial sheetsBothBoth, by the scale set on each sheetBoth, by the calibrated scalePlan sets in metric or imperial units

Features as Bluebeam's and On Center's own documentation describe them on November 9, 2026 (Bluebeam's comparison tools need a Core or Complete subscription). The estimator decides what is priced, whichever tool measured it.

In production on construction drawings

Rouandi, a civil engineering and construction firm, runs one estimating workflow on live projects. Clients in civil and infrastructure also include Flatiron Dragados, Demathieu Bard Construction and Green Infrastructure Partners.

15,000+

Plan sheets verified in production

100%

Of OCBM's quantities traceable to a source drawing

80-90%

Less time on piping takeoff at John Cockerill

Scope
One real workflow already running inside the team's estimating process, on live projects, rather than a broad roll-out.
Review
Every output went through Rouandi's team before it was used. Their corrections adjusted the system before the next document.
Now
The workflow runs inside Rouandi's estimating process, not as a pilot beside it, and five or more team members were trained along the way.

Every result can be checked against its source.

A quantity your team cannot verify is a quantity nobody will use. Each result Mirage returns carries the reference it came from, and your estimators and engineers review it against the original before it reaches a bid, a cost system or a project workflow.

Quantity
The drawing, sheet, element and revision it was measured on.
Conflict
The specification clause and the drawing that disagree.
Revision
The two sets compared, and each element added, removed or modified.
Bid line
The quotation line and the scope item it is compared with.
Sign-off
The person who validated it before it was used.

Questions from civil and infrastructure contractors

  • Yes. Scanned sheets, vector PDFs and DWG go through the same pass, older standard drawings and as-builts included, and each quantity keeps the sheet it was read from. The proof of concept runs on your own sheets, before you commit to anything.

  • An engineer from Mirage works with your pursuit team for the whole sprint, and the agents do the reading, counting and reconciling. Your estimators review every output and stay in charge of the estimate: Mirage removes the reading, not the estimator.

  • Only what you decide. Access is role-based, every agent action is logged with its inputs and sources, the agents can run in your own cloud account, and we sign an NDA on request.

  • A fixed fee from $10,000, set once we have seen the plan set and the workflows you pick, and you can stop after it. Then an annual subscription from $1,000 a month, priced by volume, never per user.

  • It measures what the drawings show: areas and lengths from plans and sections, counts from schedules, cross-section areas where sections are drawn, each tied to its sheet. Cut and fill volumes from a ground model, unit-rate build-ups and the pay-item structure stay with your estimators and your software; Mirage feeds them, it does not replace them.

  • Quantities are structured around the bill of quantities or pay-item schedule you price in, so each measured quantity lands against the item it is paid under. At application for payment, the measured record is what the certified quantity is checked against.

  • Yes. Mirage reads plan sets drawn in metric or imperial units, and documents in English or French, so a project designed to Canadian standards and one designed to a US DOT's can go through the same workflow. Each quantity keeps the unit and the scale of the sheet it was measured on.

  • Each package is measured against the same bid item or pay item structure, and the next package is compared with it in full: what was added, removed or modified, on which sheet, and which quantities moved. The estimate's class follows the design's maturity, as AACE's classes describe.

  • It measures what the drawings and schedules show: segment, ring and cable counts by type, concrete and reinforcement of piers, decks and boxes, lengths along the alignment, each tied to its sheet. Structural design, erection engineering and the tunnelling method stay with your engineers.

  • Yes. On a P3 or a progressive design-build bid the design matures over several packages and the price is set late, so the work is keeping quantities current from one package to the next and checking the bid documents against each other. Mirage does both; your bid team prices and decides.

  • Quantities go to HCSS HeavyBid, InEight Estimate and B2W Estimate through the interface each vendor documents, or to Excel. Bluebeam markups and Autodesk Construction Cloud documents are read as inputs. Nothing is migrated, and your estimators keep the tools they use.

  • On the job you win, the same agents trace each change order to the drawing, the clause and the quantity that created it, and check pay applications against the contract quantities and the approved changes. Most of the reading is the same; only the question changes.

  • A proof of concept on your own documents one week after the first meeting, then the first workflow in production in 4 to 6 weeks. The pilot is fixed-price and you can stop after it.

Bring us the operation you need to improve.

Mirage will map the workflow, identify what can be automated and define the fastest path to production.

Start with one workflow

Leave your work email, then pick a time for a 30-minute call on the workflow where your team loses the most time. You leave with a written plan to automate it. No commitment.