A bid package to read first
Plans, specifications and special provisions, geotechnical reports, DBE goals, Buy America requirements and the owner's bid form, all read before a single item is priced.
Mirage Metrics is the AI deployment partner heavy civil contractors and joint ventures bring into the estimating department for a pursuit. Our engineers set the agents up on your documents, and the quantities, the risk log and the leveled quotes reach your estimate before bid day.
On federal-aid highway work the advertisement runs at least three weeks (23 CFR 635.112). In that window, the estimators who should be pricing risk spend their days reading, counting and reconciling.
Plans, specifications and special provisions, geotechnical reports, DBE goals, Buy America requirements and the owner's bid form, all read before a single item is priced.
Older standard drawings and as-builts arrive scanned, and they still hold quantities the estimate needs.
Each addendum moves sheets, quantities or clauses that are already priced, sometimes days before the letting.
Subcontractor and supplier quotes come in their own formats, with their own exclusions, and have to be mapped to your scope before they can be compared.
Every output carries the sheet or the clause it came from, and goes where your estimators already work: HeavyBid, InEight or B2W through the interface each vendor documents, or Excel.
Every sheet indexed, scanned ones included: discipline, sheet number, revision, addendum. Changes between issues are listed, not guessed.
Quantities mapped to the items or pay items of your bid schedule, each with its sheet, so an estimator checks a line against its sheet instead of measuring it again.
Departures from the standard specifications, measurement and payment clauses, liquidated damages, milestones and Buy America requirements in one risk log, each with its clause.
Each addendum compared with the current set and the current quantities: what moved, what it touches, who needs to know.
Quotes read, scope mapped against your scope sheet, exclusions and gaps flagged, a leveled comparison ready for the chief estimator.
Delivery method, bonding, DBE goal, schedule and specification risks summarized from the documents, in your Go/No-Go format. Your team makes the call.
The owner's tabulation read against your estimate, item by item: where you were high, where you were low, what the low bidder priced differently. Kept for your unit-price history.
Change orders traced to the drawing, the clause and the quantity that created them; pay applications checked against the contract quantities and the approved changes.
We do not sell a licence and leave. Our engineers work with your pursuit team on one bid, judged on a number agreed at the start.
We take the plan set, the bid schedule, your scope sheets and your unit-price format. We agree the number the sprint is judged on, such as estimator hours on takeoff and spec review.
One week after the first meeting, a proof of concept on your own sheets: the set indexed, first quantities on your bid items, a first risk log. Your estimators correct it.
Quantities, addenda, quotes and the risk log kept current as documents arrive. An engineer works with the team; your estimators stay in charge of the estimate.
The owner's bid tabs read against your estimate, then a debrief with the chief estimator: what the agents got right, what they missed, what changes.
If the number was met, the agents on every pursuit and the next workflow on the job you win. If not, you stop there.
A fixed fee for the sprint, set once we have seen the plan set and the workflows you pick. After it, an annual subscription priced by volume, not per user.
Transit and bridge work in North America is bid package by package. On each type, every quantity keeps the sheet and the revision it was measured on.
276 major projects in Canada and the US, on one mapSee the infrastructure mapSegment counts by type from the segment schedules, pier and pier cap concrete and reinforcement, bearings, plinths and drainage. Between packages, the span arrangement, pier heights and segment types move.
Deck concrete and reinforcement, stay cables from the cable schedule, pylons, foundations and approach spans, barriers. Between packages, deck widths, cable schedules and foundation types move.
Tunnel lengths and lining rings by type, cross-passages, station box excavation and temporary walls from the sections, waterproofing areas. Between packages, the alignment chainage, box depths and the number of cross-passages move.
Track by type along the alignment, stops and platforms, overhead line poles, utility relocations and road reinstatement areas. Between packages, the alignment, stop layouts and utility conflicts move.
Criteria only, no prices. The question on a heavy civil bid is less how a line is measured than what happens to it when the next package arrives.
| Criterion | Manual takeoff | On-Screen Takeoff | Bluebeam Revu | Mirage |
|---|---|---|---|---|
| Who measures | An estimator, with a scale and a workbook | An estimator traces area, linear and count conditions on the plans | An estimator places length, area, volume and count markups on the PDF | An agent measures from the drawings and schedules; an estimator reviews |
| Where a quantity comes from | Notes in the workbook | Conditions on the plan page of the project | Each measurement is a markup on its page, tracked in the Markups List | Every quantity carries its sheet and revision |
| A reissued package | Measured again | Overlay compares two plan versions in colour; the estimator updates the conditions | Overlay Pages or Compare Documents show what changed; the estimator updates the markups | Both sets compared in full; the moved quantities listed with their sheets |
| Into the estimate | Typed in | Exported to Quick Bid, Excel or CSV | Markups List summaries exported to a spreadsheet | Structured against your bid items or pay items and exported to your estimating system |
| Earthworks volumes | From separate earthwork software | From an area and a thickness, not from a ground model | From an area and a depth, not from a ground model | Cut and fill from a ground model stay in your earthwork and estimating software |
| Metric and imperial sheets | Both | Both, by the scale set on each sheet | Both, by the calibrated scale | Plan sets in metric or imperial units |
Features as Bluebeam's and On Center's own documentation describe them on November 9, 2026 (Bluebeam's comparison tools need a Core or Complete subscription). The estimator decides what is priced, whichever tool measured it.
Rouandi, a civil engineering and construction firm, runs one estimating workflow on live projects. Clients in civil and infrastructure also include Flatiron Dragados, Demathieu Bard Construction and Green Infrastructure Partners.
Plan sheets verified in production
Of OCBM's quantities traceable to a source drawing
Less time on piping takeoff at John Cockerill
A quantity your team cannot verify is a quantity nobody will use. Each result Mirage returns carries the reference it came from, and your estimators and engineers review it against the original before it reaches a bid, a cost system or a project workflow.
Yes. Scanned sheets, vector PDFs and DWG go through the same pass, older standard drawings and as-builts included, and each quantity keeps the sheet it was read from. The proof of concept runs on your own sheets, before you commit to anything.
An engineer from Mirage works with your pursuit team for the whole sprint, and the agents do the reading, counting and reconciling. Your estimators review every output and stay in charge of the estimate: Mirage removes the reading, not the estimator.
Only what you decide. Access is role-based, every agent action is logged with its inputs and sources, the agents can run in your own cloud account, and we sign an NDA on request.
A fixed fee from $10,000, set once we have seen the plan set and the workflows you pick, and you can stop after it. Then an annual subscription from $1,000 a month, priced by volume, never per user.
It measures what the drawings show: areas and lengths from plans and sections, counts from schedules, cross-section areas where sections are drawn, each tied to its sheet. Cut and fill volumes from a ground model, unit-rate build-ups and the pay-item structure stay with your estimators and your software; Mirage feeds them, it does not replace them.
Quantities are structured around the bill of quantities or pay-item schedule you price in, so each measured quantity lands against the item it is paid under. At application for payment, the measured record is what the certified quantity is checked against.
Yes. Mirage reads plan sets drawn in metric or imperial units, and documents in English or French, so a project designed to Canadian standards and one designed to a US DOT's can go through the same workflow. Each quantity keeps the unit and the scale of the sheet it was measured on.
Each package is measured against the same bid item or pay item structure, and the next package is compared with it in full: what was added, removed or modified, on which sheet, and which quantities moved. The estimate's class follows the design's maturity, as AACE's classes describe.
It measures what the drawings and schedules show: segment, ring and cable counts by type, concrete and reinforcement of piers, decks and boxes, lengths along the alignment, each tied to its sheet. Structural design, erection engineering and the tunnelling method stay with your engineers.
Yes. On a P3 or a progressive design-build bid the design matures over several packages and the price is set late, so the work is keeping quantities current from one package to the next and checking the bid documents against each other. Mirage does both; your bid team prices and decides.
Quantities go to HCSS HeavyBid, InEight Estimate and B2W Estimate through the interface each vendor documents, or to Excel. Bluebeam markups and Autodesk Construction Cloud documents are read as inputs. Nothing is migrated, and your estimators keep the tools they use.
On the job you win, the same agents trace each change order to the drawing, the clause and the quantity that created it, and check pay applications against the contract quantities and the approved changes. Most of the reading is the same; only the question changes.
A proof of concept on your own documents one week after the first meeting, then the first workflow in production in 4 to 6 weeks. The pilot is fixed-price and you can stop after it.
Mirage will map the workflow, identify what can be automated and define the fastest path to production.
Leave your work email, then pick a time for a 30-minute call on the workflow where your team loses the most time. You leave with a written plan to automate it. No commitment.