Sets that keep changing
Drawings reissued through design and construction, each issue moving quantities that have already been priced.
AI for heavy civil and infrastructure estimating does one thing a spreadsheet cannot: it keeps every quantity, earthworks, structures, drainage and linear works, tied to the drawing revision it was measured on, so that when the set is reissued the change is a list of moved quantities rather than a fresh measure, and a change order or a payment application can be justified against the contract line by line. Mirage runs that for civil contractors; Rouandi, a civil engineering firm, runs one estimating workflow on live projects.
Long projects, many issues of the same drawings, and a contract that every quantity eventually answers to.
Drawings reissued through design and construction, each issue moving quantities that have already been priced.
A change has to be traced to the drawing, the clause and the quantity that created it before it can be claimed or agreed.
Earthworks, structures and linear works measured across plans, sections and details, then checked again at every issue.
Applications for payment checked against contract quantities and approved changes, line by line, by hand.
Every result carries the revision it came from. That is what lets a quantity survive the next issue of the drawings.
Two drawing sets compared in full: what was added, removed or modified, where it sits, and what it changes in the quantities.
Each change traced back to the drawings, specification clauses, contract scope and quantities that created it.
Drawing sets measured, quantities structured around your bill of quantities and cost codes, each tied to its drawing and revision.
Applications for payment and subcontractor invoices checked against the contract, the quantities and the approved changes.
Transit and bridge work in North America is bid package by package. On each type, every quantity keeps the sheet and the revision it was measured on.
Segment counts by type from the segment schedules, pier and pier cap concrete and reinforcement, bearings, plinths and drainage. Between packages, the span arrangement, pier heights and segment types move.
Deck concrete and reinforcement, stay cables from the cable schedule, pylons, foundations and approach spans, barriers. Between packages, deck widths, cable schedules and foundation types move.
Tunnel lengths and lining rings by type, cross-passages, station box excavation and temporary walls from the sections, waterproofing areas. Between packages, the alignment chainage, box depths and the number of cross-passages move.
Track by type along the alignment, stops and platforms, overhead line poles, utility relocations and road reinstatement areas. Between packages, the alignment, stop layouts and utility conflicts move.
The quantity types a civil estimate is built from, where each one is read, and what a reissued set usually changes. Every quantity carries its revision, so the third column is a list, not a re-measure.
| Quantity | Measured from | What a revision typically moves | Checked against |
|---|---|---|---|
| Earthworks: strip, excavate, fill by class | Plans, long and cross sections, geotechnical notes | Formation levels, batter slopes, extents of a platform | The pay item or bill item, and the previous revision's figure |
| Structures: concrete, reinforcement, formwork | General arrangement and reinforcement drawings, bar schedules | Member sizes, bar marks, a schedule that no longer matches the drawing | The bar schedule against the drawing; the previous revision |
| Drainage and utilities | Drainage layouts, long sections, manhole and chamber schedules | Invert levels, pipe runs rerouted, chamber types | The schedule against the layout; counts against the plan |
| Linear works: kerbs, barriers, fencing, pavement layers | Plans, typical cross sections, pavement schedules | Chainage limits, layer thicknesses, a typical section applied to a new length | Chainage against the plan; the previous revision |
| Pay applications and changes | Contract bill, approved changes, measured record | Nothing: this is where the moved quantities are priced and justified | Contract quantities and approved changes, line by line |
Illustrative of the quantity types, not of any client's project. Volumes from a digital ground model and unit-rate build-ups stay in your estimating software; Mirage feeds it.
Criteria only, no prices. The question on a heavy civil bid is less how a line is measured than what happens to it when the next package arrives.
| Criterion | Manual takeoff | On-Screen Takeoff | Bluebeam Revu | Mirage |
|---|---|---|---|---|
| Who measures | An estimator, with a scale and a workbook | An estimator traces area, linear and count conditions on the plans | An estimator places length, area, volume and count markups on the PDF | An agent measures from the drawings and schedules; an estimator reviews |
| Where a quantity comes from | Notes in the workbook | Conditions on the plan page of the project | Each measurement is a markup on its page, tracked in the Markups List | Every quantity carries its sheet and revision |
| A reissued package | Measured again | Overlay compares two plan versions in colour; the estimator updates the conditions | Overlay Pages or Compare Documents show what changed; the estimator updates the markups | Both sets compared in full; the moved quantities listed with their sheets |
| Into the estimate | Typed in | Exported to Quick Bid, Excel or CSV | Markups List summaries exported to a spreadsheet | Structured against your bid items or pay items and exported to your estimating system |
| Earthworks volumes | From separate earthwork software | From an area and a thickness, not from a ground model | From an area and a depth, not from a ground model | Cut and fill from a ground model stay in your earthwork and estimating software |
| Metric and imperial sheets | Both | Both, by the scale set on each sheet | Both, by the calibrated scale | Plan sets in metric or imperial units |
Features as Bluebeam's and On Center's own documentation describe them on November 9, 2026 (Bluebeam's comparison tools need a Core or Complete subscription). The estimator decides what is priced, whichever tool measured it.
Rouandi is a civil engineering and construction firm. Clients in civil and infrastructure also include Flatiron Dragados and Green Infrastructure Partners.
A quantity your team cannot verify is a quantity nobody will use. Each result Mirage returns carries the reference it came from, and your estimators and engineers review it against the original before it reaches a bid, a cost system or a project workflow.
Yes. Two drawing sets are compared in full: what was added, removed or modified, where it sits, and what it changes in the quantities. Each quantity keeps the revision it was measured on.
It traces each change back to the drawings, specification clauses, contract scope and quantities that created it, so the references are in one place. Your commercial team still builds and agrees the change.
It measures what the drawings show: areas and lengths from plans and sections, counts from schedules, cross-section areas where sections are drawn, each tied to its sheet. Cut and fill volumes from a ground model, unit-rate build-ups and the pay-item structure stay with your estimators and your software; Mirage feeds them, it does not replace them.
Quantities are structured around the bill of quantities or pay-item schedule you price in, so each measured quantity lands against the item it is paid under. At application for payment, the measured record is what the certified quantity is checked against.
Yes. Mirage reads plan sets drawn in metric or imperial units, and documents in English or French, so a project designed to Canadian standards and one designed to a US DOT's can go through the same workflow. Each quantity keeps the unit and the scale of the sheet it was measured on.
Each package is measured against the same bid item or pay item structure, and the next package is compared with it in full: what was added, removed or modified, on which sheet, and which quantities moved. The estimate's class follows the design's maturity, as AACE's classes describe.
It measures what the drawings and schedules show: segment, ring and cable counts by type, concrete and reinforcement of piers, decks and boxes, lengths along the alignment, each tied to its sheet. Structural design, erection engineering and the tunnelling method stay with your engineers.
Yes. On a P3 or a progressive design-build bid the design matures over several packages and the price is set late, so the work is keeping quantities current from one package to the next and checking the bid documents against each other. Mirage does both; your bid team prices and decides.
A proof of concept on your own documents one week after the first meeting, then the first workflow in production in 4 to 6 weeks. The pilot is fixed-price and you can stop after it.
Project management and document control platforms such as Procore and Autodesk Construction Cloud, estimating spreadsheets, ERP and accounting systems such as SAP, Oracle and Sage, and scheduling software. Where a documented interface exists, Mirage connects to it; where none exists, our engineers build the connector during deployment. Nothing is migrated.
Mirage will map the workflow, identify what can be automated and define the fastest path to production.
Tell us where your team loses time. We send back which workflows are worth automating, what a deployment involves on your systems and the shortest path to production. No commitment.