AI for heavy civil estimating: quantities, revisions, changes

AI for heavy civil and infrastructure estimating does one thing a spreadsheet cannot: it keeps every quantity, earthworks, structures, drainage and linear works, tied to the drawing revision it was measured on, so that when the set is reissued the change is a list of moved quantities rather than a fresh measure, and a change order or a payment application can be justified against the contract line by line. Mirage runs that for civil contractors; Rouandi, a civil engineering firm, runs one estimating workflow on live projects.

Book a call

Where the time goes on civil and infrastructure work

Long projects, many issues of the same drawings, and a contract that every quantity eventually answers to.

Sets that keep changing

Drawings reissued through design and construction, each issue moving quantities that have already been priced.

Changes to justify

A change has to be traced to the drawing, the clause and the quantity that created it before it can be claimed or agreed.

Quantities across hundreds of sheets

Earthworks, structures and linear works measured across plans, sections and details, then checked again at every issue.

Payment against the contract

Applications for payment checked against contract quantities and approved changes, line by line, by hand.

What Mirage runs for civil and infrastructure contractors

Every result carries the revision it came from. That is what lets a quantity survive the next issue of the drawings.

Drawing revision comparison

Two drawing sets compared in full: what was added, removed or modified, where it sits, and what it changes in the quantities.

Change orders

Each change traced back to the drawings, specification clauses, contract scope and quantities that created it.

Pay applications

Applications for payment and subcontractor invoices checked against the contract, the quantities and the approved changes.

Civil quantities: what is measured, from which drawing, and what moves between revisions

The quantity types a civil estimate is built from, where each one is read, and what a reissued set usually changes. Every quantity carries its revision, so the third column is a list, not a re-measure.

Civil quantities: what is measured, from which drawing, and what moves between revisions
QuantityMeasured fromWhat a revision typically movesChecked against
Earthworks: strip, excavate, fill by classPlans, long and cross sections, geotechnical notesFormation levels, batter slopes, extents of a platformThe pay item or bill item, and the previous revision's figure
Structures: concrete, reinforcement, formworkGeneral arrangement and reinforcement drawings, bar schedulesMember sizes, bar marks, a schedule that no longer matches the drawingThe bar schedule against the drawing; the previous revision
Drainage and utilitiesDrainage layouts, long sections, manhole and chamber schedulesInvert levels, pipe runs rerouted, chamber typesThe schedule against the layout; counts against the plan
Linear works: kerbs, barriers, fencing, pavement layersPlans, typical cross sections, pavement schedulesChainage limits, layer thicknesses, a typical section applied to a new lengthChainage against the plan; the previous revision
Pay applications and changesContract bill, approved changes, measured recordNothing: this is where the moved quantities are priced and justifiedContract quantities and approved changes, line by line

Illustrative of the quantity types, not of any client's project. Volumes from a digital ground model and unit-rate build-ups stay in your estimating software; Mirage feeds it.

In production at Rouandi

Rouandi is a civil engineering and construction firm. Clients in civil and infrastructure also include Flatiron Dragados and Green Infrastructure Partners.

Scope
One real workflow already running inside the team's estimating process, on live projects, rather than a broad roll-out.
Review
Every output went through Rouandi's team before it was used. Their corrections adjusted the system before the next document.
Now
The workflow runs inside Rouandi's estimating process, not as a pilot beside it, and five or more team members were trained along the way.

Every result can be checked against its source.

A quantity your team cannot verify is a quantity nobody will use. Each result Mirage returns carries the reference it came from, and your estimators and engineers review it against the original before it reaches a bid, a cost system or a project workflow.

Quantity
The drawing, sheet, element and revision it was measured on.
Conflict
The specification clause and the drawing that disagree.
Revision
The two sets compared, and each element added, removed or modified.
Bid line
The quotation line and the scope item it is compared with.
Sign-off
The person who validated it before it was used.

Questions from civil and infrastructure contractors

  • Yes. Two drawing sets are compared in full: what was added, removed or modified, where it sits, and what it changes in the quantities. Each quantity keeps the revision it was measured on.

Bring us the operation you need to improve.

Mirage will map the workflow, identify what can be automated and define the fastest path to production.

Start with a written plan

Tell us where your team loses time. We send back which workflows are worth automating, what a deployment involves on your systems and the shortest path to production. No commitment.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy