CONSTRUCTION INTELLIGENCE / PIPING TAKEOFF

Piping takeoff software: from isometrics to MTO and BOM

Mirage is piping takeoff software of a different kind: an AI agent, deployed by engineers, that reads isometric drawings (ISOs), P&IDs, piping layouts and line lists and returns the piping material take-off (MTO) and the fabrication bill of materials (BOM), with every line traced to its drawing and every doubt flagged. In production at John Cockerill, where piping takeoff takes 80 to 90% less time. Send us a set from a live project: we reply within two business hours.

Piping takeoff in production at John Cockerill.

THE REALITY

Before Mirage, takeoff on 2D drawings at John Cockerill took 3 to 4 days per project, and up to 15 once suppliers were brought into the costing. A fabrication bill of materials took longer still: the 3D model had to be rebuilt first.

WHAT IT COUNTS

What goes into the piping MTO

Built for EPC contractors (engineering, procurement and construction), piping fabricators and the estimators who price their work. Piping estimation starts from the MTO, so every line below arrives with its line number, its size, its spec and the ISO sheet it was read from.

Pipe
Lengths read line by line, then summed by nominal size and piping spec for purchasing.
Fittings
Elbows, tees, reducers and caps, by size, spec and end type.
Flanges
By type, size, pressure rating and facing, with blind and open flanges kept apart.
Valves
By type, size and rating, with the tag read from the isometric or the P&ID where one is shown.
Supports
Counted per line from the support symbols and tags drawn on the isometric.
Welds
Counted drawing by drawing for the fabrication BOM, with shop welds and field welds kept apart.
Weight and paint surface
Totalled from the pipe and fittings counted, for costing.
What the drawing does not say
A missing spec break, a support without a tag, a size that differs from the line list: returned as a flag, never filled in by assumption.

The quantities and the attributes behind them (line number, size, spec, rating, insulation, tag, sheet) are what we call the information take-off (ITO). The MTO and the BOM are both built from it.

WHAT MIRAGE DOES

Piping takeoff software that reads the drawings

Reads the ISO against the P&ID and the line list

Each isometric is read with the documents around it: the P&ID for valves and tags, the line list for size, spec and insulation, the piping layout for routing. Scanned sheets, vector PDFs, DWG and IFC go through the same pass, and no 3D model has to exist first.

Every line traced to its sheet

Each MTO line carries its line number and the ISO sheet it was counted on. Where the isometric and the line list disagree on a size or a spec, the line comes back flagged for the piping engineer instead of picking one. When a revision comes in, Mirage returns what changed and on which sheets.

Two outputs, in the formats you already use

The MTO for purchasing and costing and the BOM for the fabrication shop come out separately from the same drawings. Export to Excel, to the import format of your estimating system, or a write into your cost database or ERP. Your catalogue, rates and supplier quotes stay where they are.

THE OUTPUT

One isometric set, every line traced to its sheet

An illustrative example of the MTO format, not client data: six lines from two isometrics, two of them flagged before anything is priced.

Line numberSizeSpecItemQtyUnitISO sheetFlag
6"-P-1201-A1A6"A1APipe, carbon steel, seamless, SCH 4042.8mISO-1201-01None
6"-P-1201-A1A6"A1AElbow 90° long radius, butt weld7EAISO-1201-01None
6"-P-1201-A1A↳ The isometric shows Class 300 flanges at the pump nozzle, but A1A, the piping spec the line list gives this line, is rated Class 150. Flagged for the piping engineer before it is priced.6"A1AFlange, weld neck, Class 300, RF2EAISO-1201-02Spec conflict
6"-P-1201-A1A6"A1AGate valve, flanged, tag HV-12031EAISO-1201-02None
4"-P-1202-A1A↳ Two of the six supports on this sheet carry no support tag. The type is read from the symbol and the line is flagged for confirmation.4"A1APipe support, shoe6EAISO-1202-01Tag missing
4"-P-1202-A1A4"A1AButt weld, field3EAISO-1202-01None

MTO AND BOM

What the piping MTO and the fabrication BOM each hold

Two outputs from the same isometrics, built for two readers. The MTO is grouped for purchasing and costing; the BOM is grouped for the shop. At John Cockerill the BOM used to need a 3D model rebuilt first.

What the MTO and the BOM hold, column by column
Material take-off (MTO)Fabrication bill of materials (BOM)
Grouped byNominal size and piping spec, across the whole setDrawing, then spool or assembly
PipeTotal length by size, spec and scheduleCut lengths per spool, with the line number
Fittings, flanges, valvesCounts by size, spec, rating and end type; valves with their tagPer spool, in fabrication sequence
WeldsNot listedShop welds and field welds counted separately, by size
SupportsCounts by type from the support symbols and tagsPer drawing, with the tag where one is shown
Weight and paint surfaceTotals for costing and transportPer spool, for handling and coating
TraceabilityLine number and ISO sheet on every lineDrawing and revision on every line
FlagsSpec conflicts with the line list, missing tags, size mismatchesThe same flags, carried to the spool they affect

CHOOSING

How do you choose piping takeoff software?

Seven questions to put to any tool or vendor, Mirage included. Each one has an answer you can test on one of your own isometric sets before anything is signed.

  1. What does it read?

    Vector PDFs only, or scanned sheets, DWG and IFC in the same pass; the ISO alone, or the ISO with the P&ID and the line list, so valves, tags, specs and insulation are resolved rather than guessed.

  2. Does it need a 3D model first?

    Model-based MTO tools need a current model. A tool that reads the 2D deliverables as issued works on the sets that actually arrive, including subcontracted and legacy work.

  3. Is every line traced?

    Line number, size, spec and the ISO sheet it was counted on, on every row, so an engineer checks a line by opening its sheet instead of recounting the set.

  4. What happens to a conflict?

    An ISO that shows Class 300 flanges on a line the line list rates Class 150, a support without a tag: flagged for a person, or silently resolved one way. Ask to see a flag.

  5. Two outputs or one?

    The MTO for purchasing and the BOM for the shop are grouped differently. A single list means someone regroups it by hand.

  6. Where does it land?

    Excel, the import format of your estimating system, or a write into your cost database or ERP, with your catalogue, rates and supplier quotes staying where they are.

  7. What happens on revision 2?

    A full recount, or a list of what changed and on which sheets, with the previous figure kept beside the new one.

The one answer that cannot be read off a feature list is time: at John Cockerill, takeoff on 2D drawings took 3 to 4 days per project before Mirage and up to 15 with supplier costing. Ask any vendor for a figure like that from a named client, with the definition behind it.

PROOF

Piping takeoff in production at John Cockerill

John Cockerill's estimating team uses the piping (ISO) takeoff module directly, and its engineers review the output before it is used.

John Cockerill

80 to 90% less time spent on piping takeoff

Fabrication BOM ten times faster, no 3D model required first

Separate MTO and BOM outputs from the same drawing

See the case study

Send us a set of isometrics from a live project

Not a sample file: ISOs, P&IDs or a line list from a job you are estimating now. We reply within two business hours, run the proof of concept on your own drawings one week after the first meeting, and walk you through the MTO, the BOM and every flag.

Attach isometrics or a drawing set (recommended)

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy

How a deployment runs: Observe, Map, Build, Run, Expand. See the method

FAQ

Questions piping estimators ask

  • The list of every material needed to buy, cost and build a piping system: pipe lengths by size and spec, fittings, flanges, valves, supports and the rest, read from the isometric drawings (ISOs), the P&IDs (piping and instrumentation diagrams) and the line list. Mirage produces it automatically, with each line traced to the ISO sheet it was counted on.

  • The MTO groups materials for purchasing and costing. The BOM (bill of materials) is organised for the fabrication shop, drawing by drawing, with shop welds and field welds kept apart. Mirage produces both from the same drawings, as two separate outputs, which is how John Cockerill uses them.

  • Yes. Scanned and vector sheets go through the same pass, with no template to set up first. Accuracy follows scan quality, and confidence flags show which lines to check before anything is priced.

  • No. It reads 2D drawings directly. At John Cockerill, producing a fabrication bill of materials used to mean rebuilding a 3D model first; that step is gone. If you have DWG or IFC files, they go through the same pass as the PDFs.

  • No. Mirage hands the quantities to whatever you price in: your estimating system, your rates, your supplier quotes. It does not maintain a material catalogue or a labour database; it feeds yours.

  • Your engineers. Every line can be reviewed against the drawing it came from, and flagged lines go to a person before they are used. At John Cockerill, the estimating and method engineers validate the output instead of measuring the drawings themselves.

  • The proof of concept runs on your own drawings one week after the first meeting. The first workflow is in production in 4 to 6 weeks. A workflow that spans several systems, such as a write into an ERP, can take longer, and that is scoped at the first meeting.

  • A fixed-price pilot on site, which you can stop after, then an annual subscription priced by volume. The scope and the price are set once we have seen your drawings.