CONSTRUCTION INTELLIGENCE / REVISION COMPARISON

Compare Plan Revisions, Flag Every Change

Send us two plan or schedule revisions. Mirage flags exactly what changed and where in 48 hours, so your team can assess the schedule impact before it becomes a delay claim.

Running at OCBM and a US rail contractor.

THE REALITY

Identifying what changed between one plan revision and the next used to mean a side-by-side visual comparison. It introduced errors and regularly missed delta items on complex sections, and by the time a change was noticed, its schedule impact was already someone's problem.

WHAT MIRAGE DOES

Every revision compared, every change flagged

01

Compares revisions automatically

On every new revision, Mirage compares it against the prior version and generates a structured delta report, no manual side-by-side comparison required. Runs on plan sets, schedules, and specification documents alike.

02

Names exactly what changed, and where

Every flagged change points to the specific sheet, clause, or quantity that differs, with both versions referenced. Nothing is summarized into a vague "revised" note that leaves your team re-checking anyway.

03

Feeds your existing scheduling process

The structured delta drops into the scheduling and document workflow you already run, connecting to Procore, Autodesk, and the systems already in place. Your team applies the impact assessment; Mirage removes the manual comparison step.

THE OUTPUT

Every change, named and located

ItemRev ARev BChange TypeLocation
Turnout geometry, No. 10 crossoverReduced radius on this crossover falls outside the tolerance stated in the applicable spec, flagged for review before it's applied.Standard radiusReduced radiusGeometry deviationSheet C-14
Work zone WZ-08Not presentAddedNew scopeSheet C-22
Clearance requirement, Section 6.1Clearance value increased by 25 mm between revisions, flagged so the schedule and procurement impact can be assessed before proceeding.150 mm175 mmValue changeSheet 21, profile
Rebar cover, Section 03 20 00No changeNo changeNoneSheet S-108

PROOF

What teams see once revisions stop hiding changes

US Rail Contractor

Delta revision processing down from 2-3 hours to under 20 minutes per revision

Revisions arrived every 11 working days across 6 active sites, each one compared automatically

31 spec-to-plan inconsistencies caught before inspection over 7 months

Read the case study

OCBM

Dedicated agent compares drawing revisions and tender documents to surface discrepancies before submission

100% of quantities traceable to a source drawing

Every flagged inconsistency reaches an engineer before it's acted on

Read the case study

Ready to see what changed on your next revision?

Send us two revisions from an active project, and we'll show you exactly what the delta report flags.

FAQ

Frequently asked questions

No. Mirage identifies exactly what changed between two plan or schedule revisions and where. Your scheduling team still runs the actual critical-path or float analysis; Mirage removes the manual comparison step that comes before it.

Any geometry, quantity, work zone, or clause that differs between the two versions you send in. Every flag names exactly what changed and points to both source locations, so nothing has to be found by eye.

Yes. Mirage doesn't replace your scheduling tool. It reads the plan and document revisions that feed into it and returns a structured delta your team applies inside the system you already use.

Yes. Once connected, it compares each new revision against the prior one automatically and returns the delta, so nobody has to manually trigger a comparison every time a revision lands.

Specification review checks a spec against a plan. This compares two versions of the same document set against each other, to isolate exactly what changed between them.

Yes. Mirage flags what changed; your team decides what it means for the schedule. Nothing is escalated to a delay claim or a schedule revision automatically.

Under four weeks on average to a production deployment, following the same audit-then-pilot approach as our other construction agents: indexing and setup first, then a parallel pilot on one active project's revision cycle.

Pricing starts with a fixed-price pilot run on two real revisions from an active project, so you see the delta output before committing to anything larger. After that, it moves to an annual subscription priced by volume, quoted in your first conversation with us.