CONSTRUCTION INTELLIGENCE / CHANGE ORDERS
Send us a change order along with your original scope and contract. Mirage flags what's already covered and what's genuinely new in 48 hours, before it turns into a dispute.
Running at OCBM and a US rail contractor.
THE REALITY
Change orders get priced and approved without anyone systematically checking them against the original contract. Scope that was already covered gets paid for twice, and the dispute shows up months later, when it's expensive to untangle.
WHAT MIRAGE DOES
01
Mirage cross-references every requested item in a change order against the original scope of work and contract, line by line, to determine what's already covered and what's genuinely new.
02
Every match or partial match is shown with the specific clause or line item it overlaps, so your team isn't re-reading the original contract to verify the flag.
03
The scope comparison drops into the change order process your team already runs, or into Procore or Autodesk directly. No new software for contract administration to learn.
THE OUTPUT
| Change Order Item | Requested Qty | Original Scope Match | Status |
|---|---|---|---|
| Additional site fencing, north perimeter | 180 LF | Not in original scope | New scope |
| Rebar supply, foundation zone C↳ This request matches an item already priced in the original contract, off by 0.4 tons within normal tolerance. Flagged before it's paid twice. | 12.4 tons | Section 03 20 00, 12 tons | Already covered |
| Waterproofing membrane, roof level 2 | 3,200 SF | Not in original scope | New scope |
| Site fencing & signage, general conditions↳ General conditions already includes this exact fencing scope. Flagged as a duplicate rather than approved as new work. | 60 LF | Section 01 50 00, 60 LF | Already covered |
PROOF
OCBM
Dedicated agent cross-checks DCE, CCTP, and drawing revisions to surface discrepancies before they reach a submitted bid
100% of quantities traceable to a source drawing
Every flagged inconsistency reaches an engineer before it's acted on
US Rail Contractor
31 spec-to-plan inconsistencies caught before inspection over 7 months
14 geometry, 9 missing work zones, 8 contradictory tolerances
0 required post-inspection remediation on any flagged item
Send us a real change order and your original scope, and we'll show you exactly what's already covered.
FAQ
No. It flags whether the requested work overlaps scope already in the contract, and by how much. Your team still makes the approval and pricing decision; Mirage removes the manual cross-check that comes before it.
Work that matches an item, quantity, or clause already present in the original scope of work or contract. Every match is shown with the specific clause it overlaps, not just a yes/no flag.
Yes. Mirage separates a change order into what's already covered and what's genuinely new, rather than treating it as one all-or-nothing comparison, so your team prices only the actual delta.
Yes. Scanned change order forms, emailed requests, and native documents are all read the same way, adapting to different formats without requiring a specific template.
Yes. Every flag references the exact clause or line item in the original scope and contract, so anyone reviewing the change order can check the comparison itself in seconds.
No. It sits alongside the process your team already runs. Mirage prepares the scope comparison; your team still negotiates, prices, and approves every change order.
Under four weeks on average to a production deployment, following the same audit-then-pilot approach as our other construction agents: indexing your contract and scope documents first, then a parallel pilot on real change orders from one active project.
Pricing starts with a fixed-price pilot run on real change orders from one active project, so you see the comparison before committing to anything larger. After that, it moves to an annual subscription priced by volume, quoted in your first conversation with us.