CONSTRUCTION INTELLIGENCE / CHANGE ORDERS
Check Every Change Order Against Scope
Send us a change order along with your original scope and contract. Mirage flags what's already covered and what's genuinely new within a week, before it turns into a dispute.
Running at OCBM.
THE REALITY
Change orders get priced and approved without anyone systematically checking them against the original contract. Scope that was already covered gets paid for twice, and the dispute shows up months later, when it's expensive to untangle.
WHAT MIRAGE DOES
Every change order, checked against the original contract
Reads the change order against your scope
Mirage cross-references every requested item in a change order against the original scope of work and contract, line by line, to determine what's already covered and what's genuinely new.
Flags overlap with the exact clause attached
Every match or partial match is shown with the specific clause or line item it overlaps, so your team isn't re-reading the original contract to verify the flag.
Feeds into your existing approval workflow
The scope comparison drops into the change order process your team already runs, or into Procore or Autodesk directly. No new software for contract administration to learn.
THE OUTPUT
Every line item, checked against the contract
| Change Order Item | Requested Qty | Original Scope Match | Status |
|---|---|---|---|
| Additional site fencing, north perimeter | 180 LF | Not in original scope | New scope |
| Rebar supply, foundation zone C↳ This request matches an item already priced in the original contract, off by 0.4 tons within normal tolerance. Flagged before it's paid twice. | 12.4 tons | Section 03 20 00, 12 tons | Already covered |
| Waterproofing membrane, roof level 2 | 3,200 SF | Not in original scope | New scope |
| Site fencing & signage, general conditions↳ General conditions already includes this exact fencing scope. Flagged as a duplicate rather than approved as new work. | 60 LF | Section 01 50 00, 60 LF | Already covered |
PROOF
What teams see once change orders get checked against scope
OCBM
Dedicated agent cross-checks DCE, CCTP, and drawing revisions to surface discrepancies before they reach a submitted bid
100% of quantities traceable to a source drawing
Every flagged inconsistency reaches an engineer before it's acted on
Ready to check your next change order against scope?
Send us a real change order and your original scope, and we'll show you exactly what's already covered.
How a deployment runs: Observe, Map, Build, Run, Expand. See the method
Prefer to talk it through first? Book a call