CONSTRUCTION INTELLIGENCE / CHANGE ORDERS

Check Every Change Order Against Scope

Send us a change order along with your original scope and contract. Mirage flags what's already covered and what's genuinely new in 48 hours, before it turns into a dispute.

Running at OCBM and a US rail contractor.

THE REALITY

Change orders get priced and approved without anyone systematically checking them against the original contract. Scope that was already covered gets paid for twice, and the dispute shows up months later, when it's expensive to untangle.

WHAT MIRAGE DOES

Every change order, checked against the original contract

01

Reads the change order against your scope

Mirage cross-references every requested item in a change order against the original scope of work and contract, line by line, to determine what's already covered and what's genuinely new.

02

Flags overlap with the exact clause attached

Every match or partial match is shown with the specific clause or line item it overlaps, so your team isn't re-reading the original contract to verify the flag.

03

Feeds into your existing approval workflow

The scope comparison drops into the change order process your team already runs, or into Procore or Autodesk directly. No new software for contract administration to learn.

THE OUTPUT

Every line item, checked against the contract

Change Order ItemRequested QtyOriginal Scope MatchStatus
Additional site fencing, north perimeter180 LFNot in original scopeNew scope
Rebar supply, foundation zone CThis request matches an item already priced in the original contract, off by 0.4 tons within normal tolerance. Flagged before it's paid twice.12.4 tonsSection 03 20 00, 12 tonsAlready covered
Waterproofing membrane, roof level 23,200 SFNot in original scopeNew scope
Site fencing & signage, general conditionsGeneral conditions already includes this exact fencing scope. Flagged as a duplicate rather than approved as new work.60 LFSection 01 50 00, 60 LFAlready covered

PROOF

What teams see once change orders get checked against scope

OCBM

Dedicated agent cross-checks DCE, CCTP, and drawing revisions to surface discrepancies before they reach a submitted bid

100% of quantities traceable to a source drawing

Every flagged inconsistency reaches an engineer before it's acted on

Read the case study

US Rail Contractor

31 spec-to-plan inconsistencies caught before inspection over 7 months

14 geometry, 9 missing work zones, 8 contradictory tolerances

0 required post-inspection remediation on any flagged item

Read the case study

Ready to check your next change order against scope?

Send us a real change order and your original scope, and we'll show you exactly what's already covered.

FAQ

Frequently asked questions

No. It flags whether the requested work overlaps scope already in the contract, and by how much. Your team still makes the approval and pricing decision; Mirage removes the manual cross-check that comes before it.

Work that matches an item, quantity, or clause already present in the original scope of work or contract. Every match is shown with the specific clause it overlaps, not just a yes/no flag.

Yes. Mirage separates a change order into what's already covered and what's genuinely new, rather than treating it as one all-or-nothing comparison, so your team prices only the actual delta.

Yes. Scanned change order forms, emailed requests, and native documents are all read the same way, adapting to different formats without requiring a specific template.

Yes. Every flag references the exact clause or line item in the original scope and contract, so anyone reviewing the change order can check the comparison itself in seconds.

No. It sits alongside the process your team already runs. Mirage prepares the scope comparison; your team still negotiates, prices, and approves every change order.

Under four weeks on average to a production deployment, following the same audit-then-pilot approach as our other construction agents: indexing your contract and scope documents first, then a parallel pilot on real change orders from one active project.

Pricing starts with a fixed-price pilot run on real change orders from one active project, so you see the comparison before committing to anything larger. After that, it moves to an annual subscription priced by volume, quoted in your first conversation with us.

← Back to Construction Intelligence