Who owns and builds each project, its cost and its stage, every figure linked to its source, every site in 3D; how the map is made.
68 projects on the map.
Base map: Natural Earth. Sites, structures and the land around: OpenStreetMap contributors, ODbL. Each mark sits on its site.Every project as text, with its owner, its builders and its sources, below the map
Who builds Spain's and Portugal's megaprojects
The companies named on the most projects of this map, by number of projects; open a company to see its projects. A company counts once per project, whatever its number of lots, and a joint venture counts for each of its members.
Contractors
General contractors, lot contractors and EPC contractors, on two projects or more (86 named in all).
1FCC14 projects
- A-73 Burgos to Aguilar de Campoo motorway: Quintanaortuño to Montorio
- Barcelona La Sagrera station: structure and rail accesses
- Burgos-Vitoria high-speed line: Pancorbo-Ameyugo section
- Camp de Tarragona tram, phase 1: Cambrils Centre to Vila-seca (main works)
- Madrid A-5 undergrounding, Lot 1: Padre Piquer to Batán
- Madrid Metro Line 5 extension: Alameda de Osuna to Airport T1-T2-T3
- Madrid-Extremadura high-speed line: Talayuela-Plasencia section
- Montcada i Reixac R2 undergrounding and new station
- New Hospital of Aranda de Duero
- Pisão dam and Crato multi-purpose hydraulic scheme
- Port of Barcelona: liquid-bulk berths 34C, 34D and 34E on the Moll de l'Energia
- Porto Metro Ruby line (H): Casa da Música to Santo Ovídio, with the Ferreirinha bridge
- Raising of the Yesa dam and reservoir
- Tenerife island ring road closure: El Tanque to Santiago del Teide (Erjos tunnel)
2Acciona9 projects
- A-68 Arrúbal to Navarrete (Ronda Sur de Logroño)
- Barcelona La Sagrera station: structure and rail accesses
- Bilbao Metro Line 5, Aperribai to Galdakao section
- Hospital Central do Alentejo, Évora
- Madrid A-5 undergrounding, Lot 2: Batán to Avenida de Portugal
- Madrid Metro Line 11 extension: Plaza Elíptica to Conde de Casal
- Palma de Mallorca airport: processor building and Module A works
- Puente del Centenario (SE-30, Seville): stay-cable replacement and widening
- Valencia North expansion: container quay and reclamation works
3Dragados8 projects
- A-7 Valencia by-pass upgrade: CV-32 junction to CV-35 junction (km 313 to 324)
- Barcelona La Sagrera station: structure and rail accesses
- Madrid A-5 undergrounding, Lot 2: Batán to Avenida de Portugal
- Madrid Metro Line 11 extension: Plaza Elíptica to Conde de Casal
- Madrid Puerta de Atocha through station
- Salto de Chira pumped-storage hydroelectric plant
- Seville Metro Line 3 North, subtramo II: Los Mares to San Lázaro
- València rail access canal and Joaquín Sorolla station remodelling
3Ferrovial8 projects
- Barcelona La Sagrera station: structure and rail accesses
- Burgos-Vitoria high-speed line: Pancorbo-Ameyugo section
- FGC Line 8 extension: Plaça Espanya to Gràcia
- IP3 duplication and upgrade: Santa Comba Dão to Viseu
- Madrid A-5 undergrounding, Lot 1: Padre Piquer to Batán
- Montcada i Reixac R2 undergrounding and new station
- Porto Metro Pink line (G): São Bento to Casa da Música
- Raising of the Yesa dam and reservoir
5COMSA7 projects
- Barcelona La Sagrera station: structure and rail accesses
- Bilbao southern rail bypass, phase 1: Serantes connection section
- Camp de Tarragona tram, phase 1: Cambrils Centre to Vila-seca (main works)
- Lisbon Metro Circular Line: Rato to Cais do Sodré extension
- Madrid Metro Line 6 platform screen doors
- Montcada i Reixac R2 undergrounding and new station
- Port of Barcelona: liquid-bulk berths 34C, 34D and 34E on the Moll de l'Energia
5Mota-Engil7 projects
- Linha do Oeste: Meleças-Caldas da Rainha modernisation
- Lisbon Humberto Delgado airport: Terminal 1 South Pier expansion
- Lisbon Metro Circular Line: Rato to Cais do Sodré extension
- Lisbon Metro Red line extension: São Sebastião to Alcântara
- Minho line: Contumil-Ermesinde track quadrupling
- Porto-Lisbon high-speed line: Porto (Campanhã)-Oiã section
- Sines Terminal XXI container terminal expansion, phase 3
5Sacyr7 projects
- A-23 Autovía Mudéjar completion: Lanave to Embalse de Jabarrella to Sabiñánigo Sur
- Almería rail integration phase 2 and intermodal station
- Bilbao Metro Line 5, Aperribai to Galdakao section
- FGC Line 8 extension: Plaça Espanya to Gràcia
- Jaca bypass linking the A-21 and A-23 motorways
- Madrid Metro Line 5 extension: Alameda de Osuna to Airport T1-T2-T3
- Salto de Chira pumped-storage hydroelectric plant
8OHLA6 projects
- A-11 Autovía del Duero: Langa de Duero bypass to Aranda de Duero bypass
- Burgos-Vitoria high-speed line: Manzanos-La Puebla de Arganzón section
- Estadio de Gran Canaria extension and refurbishment ('La Nube')
- La Nueva Romareda stadium, Zaragoza (Ibercaja Romareda)
- Lorca rail integration: underground line and Lorca-Sutullena station
- New Hospital of Málaga (Hospital Virgen de la Esperanza)
9Copisa5 projects
10Convensa4 projects
10Rover4 projects
10Sando4 projects
10SANJOSE4 projects
10Teixeira Duarte4 projects
15ACA3 projects
15Altuna y Uria3 projects
15Azvi3 projects
15Gabriel Couto3 projects
15Puentes y Calzadas3 projects
20Acsa (Sorigué)2 projects
20Aldesa2 projects
20Alves Ribeiro2 projects
20CHM2 projects
20Copasa2 projects
Engineers, designers and architects
Owner's engineers, design and supervision firms, architects, on two projects or more (53 named in all).
1Cemosa2 projects
1Sener2 projects
1Sener Mobility2 projects
1Técnica y Proyectos2 projects
Owners and developers
The public owners, the developers and the concessionaires, on two projects or more (54 named in all).
1Adif15 projects
- Almería rail integration phase 2 and intermodal station
- Barcelona La Sagrera station: structure and rail accesses
- Burgos-Vitoria high-speed line: Burgos bypass-Valle de las Navas section
- Burgos-Vitoria high-speed line: Manzanos-La Puebla de Arganzón section
- Burgos-Vitoria high-speed line: Pancorbo-Ameyugo section
- Loja bypass: Loja-A-92 section
- Loja bypass: Valle del Genil section
- Lorca rail integration: underground line and Lorca-Sutullena station
- Madrid Puerta de Atocha through station
- Madrid-Extremadura high-speed line, Talayuela-Plasencia: signalling, ERTMS level 2 and fixed telecoms
- Madrid-Extremadura high-speed line: Talayuela-Plasencia section
- Montcada i Reixac R2 undergrounding and new station
- Murcia-Cartagena high-speed link: Torre Pacheco-Cartagena section
- Navarra high-speed corridor: Tafalla-Campanas section
- València rail access canal and Joaquín Sorolla station remodelling
2Dirección General de Carreteras14 projects
- A-11 Autovía del Duero: Langa de Duero bypass to Aranda de Duero bypass
- A-11 Autovía del Duero: Olivares de Duero to Tudela de Duero
- A-11 Autovía del Duero: Quintanilla de Arriba (west) to Olivares de Duero
- A-23 Autovía Mudéjar completion: Lanave to Embalse de Jabarrella to Sabiñánigo Sur
- A-23 Autovía Mudéjar: Sabiñánigo bypass (Sabiñánigo Este to Sabiñánigo Oeste)
- A-54 Lugo to Santiago motorway: Melide (south) to Arzúa (west)
- A-63 Oviedo to La Espina motorway: Cornellana to Salas
- A-67 motorway widening to three lanes: Polanco to Santander
- A-68 Arrúbal to Navarrete (Ronda Sur de Logroño)
- A-7 Valencia by-pass upgrade: CV-32 junction to CV-35 junction (km 313 to 324)
- A-73 Burgos to Aguilar de Campoo motorway: Quintanaortuño to Montorio
- Jaca bypass linking the A-21 and A-23 motorways
- Puente del Centenario (SE-30, Seville): stay-cable replacement and widening
- SE-40 Seville ring road: Valencina (A-8077) to Salteras (A-66)
2Ministerio de Transportes y Movilidad Sostenible14 projects
- A-11 Autovía del Duero: Langa de Duero bypass to Aranda de Duero bypass
- A-11 Autovía del Duero: Olivares de Duero to Tudela de Duero
- A-11 Autovía del Duero: Quintanilla de Arriba (west) to Olivares de Duero
- A-23 Autovía Mudéjar completion: Lanave to Embalse de Jabarrella to Sabiñánigo Sur
- A-23 Autovía Mudéjar: Sabiñánigo bypass (Sabiñánigo Este to Sabiñánigo Oeste)
- A-54 Lugo to Santiago motorway: Melide (south) to Arzúa (west)
- A-63 Oviedo to La Espina motorway: Cornellana to Salas
- A-67 motorway widening to three lanes: Polanco to Santander
- A-68 Arrúbal to Navarrete (Ronda Sur de Logroño)
- A-7 Valencia by-pass upgrade: CV-32 junction to CV-35 junction (km 313 to 324)
- A-73 Burgos to Aguilar de Campoo motorway: Quintanaortuño to Montorio
- Jaca bypass linking the A-21 and A-23 motorways
- Puente del Centenario (SE-30, Seville): stay-cable replacement and widening
- SE-40 Seville ring road: Valencina (A-8077) to Salteras (A-66)
4Infraestruturas de Portugal6 projects
- IP3 duplication and upgrade: Santa Comba Dão to Viseu
- Linha do Alentejo: Poceirão-Bombel modernisation and doubling
- Linha do Norte: Ovar (Válega)-Espinho renewal
- Linha do Oeste: Meleças-Caldas da Rainha modernisation
- Minho line: Contumil-Ermesinde track quadrupling
- Porto-Lisbon high-speed line: Porto (Campanhã)-Oiã section
5Junta de Andalucía3 projects
6Ayuntamiento de Madrid2 projects
6Comunidad de Madrid2 projects
6Consejería de Fomento2 projects
6Departament de Territori2 projects
6E.P.E2 projects
6Euskal Trenbide Sarea2 projects
6Generalitat de Catalunya2 projects
6Infraestructures de la Generalitat de Catalunya2 projects
6Metro do Porto2 projects
6Metropolitano de Lisboa2 projects
6Red Eléctrica2 projects
Lenders
The development banks and the banks that finance the projects, on two projects or more (5 named in all).
1European Investment Bank6 projects
Compiled by Mirage Metrics, November 2026, from the projects on the map and those listed under it.
A company missing, or a project missing from a company's row? Write to mehdi@miragemetrics.com with a public source. Share the ranking on LinkedIn.
All 68 projects on the map
The same projects as the map above, as text, by family. Each name opens the project's page, with every figure, the companies and their roles, and the sources.
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Almería rail integration phase 2 and intermodal station | Almería, Andalusia | Adif and Adif Alta Velocidad, Junta de Andalucía, Ayuntamiento de Almería | Sacyr | €235 M (total project cost) | Under construction |
| Barcelona La Sagrera station: structure and rail accesses | Barcelona (Sant Andreu and Sant Martí districts), Catalonia | Adif Alta Velocidad | Dragados, Acciona, Comsa and Acsa (Sorigué), Rubau, Copisa, FCC Construcción and Ferrovial Agromán | €340 M (budget) | Under construction |
| Bilbao southern rail bypass, phase 1: Serantes connection section | Ortuella, Bizkaia, Basque Country | Euskal Trenbide Sarea (ETS) | COMSA, Azvi, Iza Obras y Promociones | €108 M (budget) | Under construction |
| Burgos-Vitoria high-speed line: Burgos bypass-Valle de las Navas section | Burgos, Rubena, Quintanapalla and Valle de las Navas, Burgos, Castile and León | Adif Alta Velocidad | Gevora Construcciones, Copisa, Construcciones Sarrión | Contract awarded, works not confirmed | |
| Burgos-Vitoria high-speed line: Manzanos-La Puebla de Arganzón section | Manzanos (Ribera Baja, Álava) to La Puebla de Arganzón (Condado de Treviño, Burgos), Basque Country / Castile and León | Adif Alta Velocidad | OHLA, Sando (Construcciones Sánchez Domínguez), Altuna y Uria | €272 M (budget) | Contract awarded, works not confirmed |
| Burgos-Vitoria high-speed line: Pancorbo-Ameyugo section | Pancorbo and Ameyugo, Burgos, Castile and León | Adif Alta Velocidad | Ferrovial, FCC Construcción, Contratas y Ventas (Convensa) | €363 M (budget) | Under construction |
| Linha do Alentejo: Poceirão-Bombel modernisation and doubling | Palmela, Montijo and Vendas Novas, Lisbon / Alentejo | Infraestruturas de Portugal | ZAGOPE - Construções e Engenharia | €270 M (total project cost) | Under construction |
| Linha do Norte: Ovar (Válega)-Espinho renewal | Válega (Ovar) to Espinho, via Ovar and Esmoriz, Centro / Norte | Infraestruturas de Portugal | Somafel - Engenharia e Obras Ferroviárias, Construções Gabriel Couto, Teixeira Duarte | €160 M (total project cost) | Under construction |
| Linha do Oeste: Meleças-Caldas da Rainha modernisation | Mira Sintra-Meleças (Sintra) to Caldas da Rainha, via Malveira and Torres Vedras, Lisbon / Centro | Infraestruturas de Portugal | Construções Gabriel A. S. Couto, M. Couto Alves, Aldesa | Under construction | |
| Loja bypass: Loja-A-92 section | Loja, Granada, Andalusia | Adif Alta Velocidad | Copisa, Copasa, CHM | Under construction | |
| Loja bypass: Valle del Genil section | Loja, Salar and Huétor-Tájar, Granada, Andalusia | Adif Alta Velocidad | Puentes y Calzadas Infraestructuras, Rover Infraestructuras, Geotúnel | €341 M (budget) | Under construction |
| Lorca rail integration: underground line and Lorca-Sutullena station | Lorca, Murcia, Region of Murcia | Adif Alta Velocidad | OHLA | €400 M (budget) | Under construction |
| Madrid Puerta de Atocha through station | Madrid (Arganzuela district), Community of Madrid | Adif Alta Velocidad | Dragados, Tecsa, Constructora San José | Under construction | |
| Madrid-Extremadura high-speed line: Talayuela-Plasencia section | Talayuela, Navalmoral de la Mata, Casatejada, Toril, Malpartida de Plasencia and Plasencia, Cáceres, Extremadura | Adif Alta Velocidad | Hitachi Rail and Sistemas y Montajes Industriales (Grupo CPS), Nokia, Sociedad Ibérica and Syneox, FCC and Convensa | €39 M (contract value, tender estimated value, overhead contact line and associated systems, works and maintenance, 48 months) | Under construction |
| Minho line: Contumil-Ermesinde track quadrupling | Contumil (Porto) to Ermesinde (Valongo), via Rio Tinto and Águas Santas, Norte | Infraestruturas de Portugal | Mota-Engil | €226 M (total project cost) | Under construction |
| Montcada i Reixac R2 undergrounding and new station | Montcada i Reixac, Barcelona, Catalonia | Adif | Ferrovial Construcción, Comsa, FCC Construcción | €621 M (budget) | Under construction |
| Murcia-Cartagena high-speed link: Torre Pacheco-Cartagena section | Torre Pacheco and Cartagena (Pozo Estrecho), Murcia, Region of Murcia | Adif Alta Velocidad | Constructora San José (SANJOSE), Acsa (Sorigué) | Under construction | |
| Navarra high-speed corridor: Tafalla-Campanas section | Tafalla to Campanas (Tiebas-Muruarte de Reta), Navarra, Navarre | Adif Alta Velocidad | S.A. de Obras y Servicios Copasa, Puentes y Calzadas Infraestructuras, Constructora San José | €271 M (budget) | Under construction |
| Porto-Lisbon high-speed line: Porto (Campanhã)-Oiã section | Porto to Oiã (Oliveira do Bairro), through 10 municipalities, Norte / Centro | Infraestruturas de Portugal, AVAN Norte - Gestão da Ferrovia de Alta Velocidade | Mota-Engil, Serena, Teixeira Duarte | €2 bn (total project cost) | Under construction |
| València rail access canal and Joaquín Sorolla station remodelling | València (Quatre Carreres, Jesús and L'Eixample districts), Valencian Community | Adif Alta Velocidad | Dragados, Rover Infraestructuras, Rover Rail | €665 M (total project cost) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Barcelona Metro L9/L10 central section: Zona Universitària to La Sagrera | Barcelona (Les Corts, Sarrià-Sant Gervasi, Gràcia, Horta-Guinardó, Sant Andreu), Catalonia | Generalitat de Catalunya, Departament de Territori, Transports Metropolitans de Barcelona (TMB) | €926 M (budget) | Under construction | |
| Bilbao Metro Line 5, Aperribai to Galdakao section | Galdakao, Bizkaia, Basque Country | Euskal Trenbide Sarea (ETS) | Metro Bengoetxe UTE (Acciona, Sacyr, Altuna y Uria, Bycam, equal shares) | €91 M (budget) | Under construction |
| Camp de Tarragona tram, phase 1: Cambrils Centre to Vila-seca (main works) | Cambrils, Vinyols i els Arcs, Salou and Vila-seca, Tarragona, Catalonia | Infraestructures de la Generalitat de Catalunya, Ferrocarrils de la Generalitat de Catalunya (FGC) | COMSA, FCC Construcción, Syneox Rail and Garcia Riera (UTE) | €112 M (contract value, main works lot (track, catenary, 11 stops, 5 substations), excl. vat) | Contract awarded, works not confirmed |
| FGC Line 8 extension: Plaça Espanya to Gràcia | Barcelona (Sants-Montjuïc, Eixample Esquerra, Sant Gervasi, Gràcia), Catalonia | Generalitat de Catalunya, Departament de Territori / Infraestructures de la Generalitat de Catalunya | Copcisa, Copisa Constructora Pirenaica, Ferrovial Construcción, Sacyr Construcción | €412 M (total project cost) | Under construction |
| Lisbon Metro Circular Line: Rato to Cais do Sodré extension | Lisbon (Estrela, Santos, Madragoa, Cais do Sodré; Campo Grande), Lisbon | Metropolitano de Lisboa, E.P.E. | Zagope, Construção e Engenharia, Metro Santos Sodré ACE (Mota-Engil and Spie Batignolles International), Zagope and COMSA (ACE) | €380 M (total project cost) | Under construction |
| Lisbon Metro Red line extension: São Sebastião to Alcântara | Lisbon (Campolide, Amoreiras, Campo de Ourique, Estrela, Alcântara), Lisbon | Metropolitano de Lisboa, E.P.E. | Mota-Engil Engenharia e Construção, Spie Batignolles Internacional | €405 M (total project cost) | Contract awarded, works not confirmed |
| Madrid Metro Line 11 extension: Plaza Elíptica to Conde de Casal | Madrid (Carabanchel, Arganzuela, Retiro), Community of Madrid | Comunidad de Madrid, Consejería de Vivienda, Transportes e Infraestructuras | Acciona Construcción, Dragados (ACS) and Rover Infraestructuras (UTE) | €671 M (total project cost) | Under construction |
| Madrid Metro Line 5 extension: Alameda de Osuna to Airport T1-T2-T3 | Madrid (Barajas district: Alameda de Osuna, Madrid-Barajas airport), Community of Madrid | Comunidad de Madrid, Dirección General de Infraestructuras de Transporte Colectivo | FCC Construcción, Sacyr Construcción and Becsa (Grupo Simetría), UTE Aeropuerto L5 | €189 M (budget) | Under construction |
| Madrid Metro Line 6 (Circular) automation programme | Madrid (whole Line 6 ring), Community of Madrid | Metro de Madrid, S.A. | Alstom Movilidad, UTE Puertas Andén Línea 6 (Faiveley Transport Ibérica, COMSA Instalaciones y Sistemas Industriales, COMSA) | €231 M (budget, approx.) | Under construction |
| Porto Metro Pink line (G): São Bento to Casa da Música | Porto (Baixa, Cedofeita, Massarelos, Boavista), Norte | Metro do Porto, S.A. | Ferrovial, ACA - Alberto Couto Alves | €305 M (total project cost) | Under construction |
| Porto Metro Ruby line (H): Casa da Música to Santo Ovídio, with the Ferreirinha bridge | Porto (Boavista, Campo Alegre) and Vila Nova de Gaia (Arrábida, Candal, Devesas, Santo Ovídio), Norte | Metro do Porto, S.A. | ACA - Alberto Couto Alves, FCC Construcción, Contratas y Ventas | €488 M (budget) | Under construction |
| Seville Metro Line 3 North, subtramo II: Los Mares to San Lázaro | Sevilla (Pino Montano, San Lázaro), Andalusia | Junta de Andalucía, Consejería de Fomento | Azvi, Dragados and Martín Casillas (UTE) | €132 M (budget) | Under construction |
| Seville Metro Line 3 North, subtramo III: San Lázaro to Muñoz León | Sevilla (Macarena), Andalusia | Junta de Andalucía, Consejería de Fomento | Vías y Construcciones, Lantania and DSV Empresa Constructora y Ferroviaria (UTE) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| A-11 Autovía del Duero: Langa de Duero bypass to Aranda de Duero bypass | Langa de Duero (Soria), Zuzones, La Vid, Vadocondes, Fresnillo de las Dueñas and Aranda de Duero (Burgos), Castile and León | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Obrascón Huarte Lain (OHLA) and Asch Infraestructuras y Servicios (UTE) | €212 M (budget) | Under construction |
| A-11 Autovía del Duero: Olivares de Duero to Tudela de Duero | Olivares de Duero, Villabáñez and Tudela de Duero, Valladolid, Castile and León | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | €81 M (budget) | Partly in service, partly under construction | |
| A-11 Autovía del Duero: Quintanilla de Arriba (west) to Olivares de Duero | Quintanilla de Arriba, Valbuena de Duero and Olivares de Duero, Valladolid, Castile and León | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | UTE A11 Quintanilla-Olivares | €233 M (budget) | Partly in service, partly under construction |
| A-23 Autovía Mudéjar completion: Lanave to Embalse de Jabarrella to Sabiñánigo Sur | Caldearenas and Sabiñánigo, Huesca (Gállego valley, Jabarrella reservoir), Aragon | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Sacyr Construcción, S.A. | €14 M (budget) | Under construction |
| A-23 Autovía Mudéjar: Sabiñánigo bypass (Sabiñánigo Este to Sabiñánigo Oeste) | Sabiñánigo, Huesca, Aragon | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Aldesa Construcciones and Rover Infraestructuras (UTE) | €108 M (budget) | Suspended |
| A-54 Lugo to Santiago motorway: Melide (south) to Arzúa (west) | Melide, Santiso and Arzúa, A Coruña, Galicia | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Construcciones Sánchez Domínguez Sando and Copisa Constructora Pirenaica (UTE) | €117 M (total project cost) | Under construction |
| A-63 Oviedo to La Espina motorway: Cornellana to Salas | Salas (Cornellana to Salas), Asturias, Asturias | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | €158 M (total project cost) | Under construction | |
| A-67 motorway widening to three lanes: Polanco to Santander | Polanco, Miengo, Piélagos, Santa Cruz de Bezana and Camargo, Cantabria, Cantabria | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Constructora San José and Aceinsa Movilidad (UTE) | €173 M (budget) | Under construction |
| A-68 Arrúbal to Navarrete (Ronda Sur de Logroño) | Arrúbal, Agoncillo, Murillo de Río Leza, Logroño, Villamediana de Iregua, Lardero, Navarrete, La Rioja, La Rioja | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Acciona Construcción and Aquaterra (UTE Variante Logroño) | €123 M (budget) | Partly in service, partly under construction |
| A-7 Valencia by-pass upgrade: CV-32 junction to CV-35 junction (km 313 to 324) | El Puig, Rafelbunyol, Massamagrell, Museros, Moncada, Bétera, Valencia, Godella and Paterna, Valencia, Valencian Community | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Dragados and Pavasal (UTE) | €144 M (budget) | Under construction |
| A-73 Burgos to Aguilar de Campoo motorway: Quintanaortuño to Montorio | Quintanaortuño, Merindad de Río Ubierna (Ubierna) and Montorio, Burgos, Castile and León | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | FCC Construcción and Construcciones y Obras Llorente (UTE) | €106 M (budget) | Under construction |
| IP3 duplication and upgrade: Santa Comba Dão to Viseu | Santa Comba Dão, Tondela and Viseu, district of Viseu, Centro | Infraestruturas de Portugal, S.A. | Ferrovial | Under construction | |
| Jaca bypass linking the A-21 and A-23 motorways | Jaca, Huesca, Aragon | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Sacyr and Papsa Infraestructuras (Grupo Romero Polo) (UTE) | €154 M (budget) | Contract awarded, works not confirmed |
| Madrid A-5 undergrounding, Lot 1: Padre Piquer to Batán | Madrid (Latina district), Community of Madrid | Ayuntamiento de Madrid | FCC Construcción, Ferrovial Construcción | €176 M (budget) | Under construction |
| Madrid A-5 undergrounding, Lot 2: Batán to Avenida de Portugal | Madrid (Latina district, by Casa de Campo), Community of Madrid | Ayuntamiento de Madrid | Dragados, Acciona Construcción | €142 M (budget) | Under construction |
| Puente del Centenario (SE-30, Seville): stay-cable replacement and widening | Seville, over the Canal de Alfonso XIII (port of Seville), Andalusia | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Acciona Construcción, Tecade and Freyssinet (UTE Sustitución Tirantes Puente del Centenario) | €136 M (budget) | Suspended |
| SE-40 Seville ring road: Valencina (A-8077) to Salteras (A-66) | Valencina de la Concepción and Salteras, Sevilla, Andalusia | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Azvi and Martín Casillas (UTE) | €125 M (budget) | Under construction |
| Tenerife island ring road closure: El Tanque to Santiago del Teide (Erjos tunnel) | El Tanque, Erjos and Santiago del Teide, Tenerife, Canary Islands | Gobierno de Canarias, Consejería de Obras Públicas, Vivienda y Movilidad | FCC Construcción, Syocsa-Inarsa and El Silbo (UTE) | €21 M (budget) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| New port of Lajes das Flores | Lajes das Flores, Flores Island, Azores | Portos dos Açores, S.A. | Tecnovia Açores, Sociedade de Construções S.A., Etermar, Engenharia e Construção S.A., Teixeira Duarte, Engenharia e Construções S.A. | €192 M (budget) | Under construction |
| Port of Barcelona: liquid-bulk berths 34C, 34D and 34E on the Moll de l'Energia | Barcelona, Catalonia | Autoritat Portuària de Barcelona | FCC Construcción S.A., COMSA S.A.U. | €124 M (budget) | Contract awarded, works not confirmed |
| Sines Terminal XXI container terminal expansion, phase 3 | Sines, Setúbal district, Alentejo | APS, Administração dos Portos de Sines e do Algarve, PSA Sines | Mota-Engil, Engenharia e Construção, S.A., Etermar, Engenharia e Construção, S.A. | €300 M (announced investment) | Partly in service, partly under construction |
| Valencia North expansion: container quay and reclamation works | València, Valencian Community | Autoridad Portuaria de València | Acciona Construcción S.A., Jan De Nul NV, Grupo Bertolín S.A.U. | €657 M (budget) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Lisbon Humberto Delgado airport: Terminal 1 South Pier expansion | Lisboa, Lisbon | ANA, Aeroportos de Portugal, S.A. (VINCI Airports) | Mota-Engil, VINCI Construction Grands Projets, Alves Ribeiro | €233 M (contract value, terminal 1 main works contract, vat not stated) | Under construction |
| Palma de Mallorca airport: processor building and Module A works | Palma, Mallorca, Balearic Islands | Aena S.M.E., S.A. | Acciona Construcción S.A. | €224 M (budget) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Bay of Biscay Spain-France HVDC interconnection | Gatika and Lemoiz, Bizkaia; Cubnezais, Le Porge, Seignosse and Capbreton, France, Basque Country | Inelfe, Red Eléctrica de España, RTE | Hitachi Energy / VINCI consortium, FASSET consortium | €3.13 bn (total project cost) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Pisão dam and Crato multi-purpose hydraulic scheme | Crato, Portalegre district, Alentejo | CIMAA, Comunidade Intermunicipal do Alto Alentejo | FCC Construcción, Alberto Couto Alves | €222 M (total project cost) | Under construction |
| Raising of the Yesa dam and reservoir | Yesa (Navarra); Sigüés, Artieda, Mianos, Undués de Lerda, Urriés, Los Pintanos and Salvatierra de Esca (Zaragoza), Navarre / Aragon | Ministerio para la Transición Ecológica (Dirección General del Agua) / Confederación Hidrográfica del Ebro | ACS, Ferrovial, FCC | €500 M (total project cost) | Under construction |
| Salto de Chira pumped-storage hydroelectric plant | Mogán and San Bartolomé de Tirajana, Gran Canaria, Canary Islands | Red Eléctrica de España S.A.U. (Redeia) | Dragados, Cobra Infraestructuras Hidráulicas, Obras Subterráneas (Ossa) | €589 M (budget) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Algarve seawater desalination plant, Albufeira | Albufeira (freguesia de Albufeira e Olhos de Água), Faro district, Algarve | Águas do Algarve, S.A. | Aquapor, GS Inima | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Hospital Central do Alentejo, Évora | Évora, Alentejo | ULS do Alentejo Central (formerly ARS Alentejo), Ministério da Saúde | Acciona | €237 M (total project cost) | Under construction |
| Hospital de Lisboa Oriental (Todos-os-Santos), Marvila | Marvila, Lisboa, Lisbon | Portuguese State (Ministério da Saúde), Consortium of Hygeia Edifícios Hospitalares, InfraRed Infrastructure V Investments, Mota-Engil Engenharia e Construção, Mota-Engil Europa and Manvia | €380 M (total project cost) | Under construction | |
| New Hospital of Aranda de Duero | Aranda de Duero, Burgos, Castile and León | Gerencia Regional de Salud de Castilla y León (Sacyl) | FCC Construcción | €118 M (budget) | Under construction |
| New Hospital of Málaga (Hospital Virgen de la Esperanza) | Málaga, Andalusia | Servicio Andaluz de Salud (Junta de Andalucía) | Construcciones Sánchez Domínguez-Sando S.A.U., Obrascón Huarte Laín S.A. (OHLA), Vialterra Infraestructuras S.A. | €608 M (budget) | Under construction |
| Project | Where | Owner | Built by | Amount | Stage |
|---|---|---|---|---|---|
| Estadio de Gran Canaria extension and refurbishment ('La Nube') | Las Palmas de Gran Canaria, Canary Islands | Instituto Insular de Deportes de Gran Canaria (Cabildo de Gran Canaria) | OHLA, Sando | €235 M (budget) | Procurement |
| La Nueva Romareda stadium, Zaragoza (Ibercaja Romareda) | Zaragoza, Aragon | La Nueva Romareda S.L. | Obrascón Huarte Laín S.A. (OHLA), Altuna y Uria S.A., OHLA Servicios Ingesan S.A. | €139 M (budget) | Under construction |
15 programmes and projects without a mark of their own
These are listed without a mark of their own: a programme whose sections are on the map one by one, or works whose site no published document or map places yet. Each keeps its record and moves onto the map once its site is known.
| Project | Type | Owner | Stage | Why it is not on the map |
|---|---|---|---|---|
| Porto-Lisbon high-speed line (programme) | Rail | Infraestruturas de Portugal, AVAN Norte (LusoLAV consortium), Sacyr, DST and Alberto Couto Alves consortium | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Murcia-Almería high-speed line (Mediterranean Corridor) | Rail | Adif Alta Velocidad | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Burgos-Vitoria high-speed line (programme) | Rail | Adif Alta Velocidad | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Navarra high-speed corridor: Castejón-Pamplona (programme) | Rail | Adif Alta Velocidad, Gobierno de Navarra | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Madrid-Extremadura high-speed line | Rail | Adif Alta Velocidad | Partly in service, partly under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Madrid-Extremadura high-speed line, Talayuela-Plasencia: signalling, ERTMS level 2 and fixed telecoms | Rail | Adif Alta Velocidad | Contract awarded, works not confirmed | The signalling and train control contract of the Talayuela-Plasencia section, which is on the map |
| Antequera-Granada high-speed line: Loja bypass | Rail | Adif Alta Velocidad | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Bilbao southern rail bypass, phase 1 | Rail | Ministerio de Transportes y Movilidad Sostenible, Euskal Trenbide Sarea (ETS) | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Madrid Metro Line 6 platform screen doors | Urban transit | Metro de Madrid, S.A. | Under construction | A contract of the Line 6 automation programme, which is on the map |
| Seville Metro Line 3 North: Pino Montano to Prado de San Sebastián | Urban transit | Junta de Andalucía, Consejería de Fomento, Articulación del Territorio y Vivienda | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Bilbao Metro Line 5: Sarratu (Basauri) to Galdakao Hospital | Urban transit | Euskal Trenbide Sarea (ETS), Gobierno Vasco | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Madrid A-5 undergrounding and Paseo Verde del Suroeste | Highways | Ayuntamiento de Madrid | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Valencia North container terminal (North expansion of the Port of Valencia) | Ports | Autoridad Portuaria de València, Terminal Investment Limited (TIL, MSC group) | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Lisbon Humberto Delgado airport terminal modernisation and expansion | Airports | ANA, Aeroportos de Portugal, S.A. (VINCI Airports) | Partly in service, partly under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
| Palma de Mallorca airport integral remodelling | Airports | Aena S.M.E., S.A. | Under construction | A programme: its sections of EUR 100 million or more are on the map one by one |
About this map
The map holds the infrastructure projects of EUR 100 million or more under construction in Spain and Portugal, or whose main works have been awarded, as of 26 Nov 2026. It started from a list of 82 rows compiled from the owners, the procurement records and the contractors' releases, one row per programme and one per section or lot of that size; each row was then researched again, its facts checked against the document that states them, and corrected where they were wrong.
- Owners, contractors, designers and supervisors are named only where a source names them, each with its role; the members of a UTE or a consortium are listed with their share where the owner publishes it.
- Amounts are given in euros as published, with what they are (a contract, a section's budget, a programme's total) and whether VAT is included. They are never converted or added together.
- A stage needs a dated statement of its kind: a contract award or its formalisation, a start of works, a progress figure with its date, an opening. A planned date is marked as such.
- Owners, gazettes and procurement records come first, then the companies and the funders, then the press; each source's type is shown on the project's page, and where two sources disagree both figures are kept.
The 3D model of each site is drawn to scale from OpenStreetMap (ODbL): the works as mapped and the land, roads, rail, water and buildings around them. The structure is drawn with its published figures; what no map or source gives is drawn as typical and listed under the model as illustrative. The islands are on the map: the Balearics, the Canaries, the Azores and Madeira.
Mirage Metrics builds AI agents for the construction teams that estimate and deliver projects like these: quantities from each drawing set, changes between revisions, and bid documents checked against each other. See AI construction software for contractors. This map is published as a reference and says nothing about any work by Mirage Metrics on these projects. Morocco's are on the Morocco megaprojects map, North America's on the infrastructure map.
To report an error, write to mehdi@miragemetrics.com with a public source. Corrections follow the editorial policy.
Questions readers ask
The infrastructure projects of EUR 100 million or more under construction in Spain and Portugal, or whose main works have been awarded: the high-speed lines and their stations, the metro, tram and light rail extensions, the motorways, bridges and road tunnels, the ports, the airport terminals, the Bay of Biscay interconnector with France, the dams and the pumped-storage plant, the desalination plant, and the hospitals and stadiums built under a single contract. The islands are included: the Balearics, the Canaries, the Azores and Madeira. A programme built in several sections is listed with its sections, and each section of EUR 100 million or more is on the map on its own.
From the owners first (Adif, Infraestruturas de Portugal, the Ministry of Transport, the regional governments, the metro companies, Aena, ANA, the port authorities, Red Eléctrica), then from the procurement records and gazettes (Spain's public sector procurement platform and the BOE, Portugal's Base and Diário da República), the funders' documents, the contractors' own releases, and the press where nothing better exists. Every fact carries a link to its source and the source's type on the project's page. Where two sources disagree, both figures are kept.
Each site is drawn to scale from OpenStreetMap: the works as mapped (a line's route with its tunnels and viaducts, a station, a terminal, a quay, a dam, a hospital's buildings), with the roads, rail, water, buildings and land around. The structure is drawn with the figures its owner, architect or builder publishes: a line's length and structures, a station's platforms, a terminal's floor area, a quay's length, a dam's height, a hospital's floors. What no map or source gives is drawn as typical and listed under each model as illustrative.
As the owner publishes them. Spanish and Portuguese contract awards are usually stated without VAT and tender budgets often with it; each amount says what it is (one contract, a section's budget, a programme's total) and whether VAT is included where the source says so. Amounts are never converted or added together.
The map describes these projects from public sources and says nothing about any work by Mirage Metrics on them. Mirage Metrics builds AI agents for the construction teams that estimate and deliver projects like these, and publishes the map as a reference.
Write to mehdi@miragemetrics.com with the project, the fact and a public source for the correction. A verified correction is made on the project's page and its date is updated, as the editorial policy describes.
Browse the map by region and by type
By region
- Alentejo (4)
- Algarve (1)
- Andalusia (8)
- Aragon (5)
- Asturias (1)
- Azores (1)
- Balearic Islands (1)
- Basque Country (4)
- Canary Islands (3)
- Cantabria (1)
- Castile and León (8)
- Catalonia (6)
- Centro (4)
- Community of Madrid (6)
- Extremadura (1)
- Galicia (1)
- La Rioja (1)
- Lisbon (6)
- Navarre (2)
- Norte (5)
- Region of Murcia (2)
- Valencian Community (3)
By type
- Airports (2)
- Dams and hydro (3)
- Energy (1)
- Highways (18)
- Hospitals (4)
- Ports (4)
- Rail (20)
- Stadiums (2)
- Urban transit (13)
- Water (1)