Reviewed record

Algarve seawater desalination plant, Albufeira

Location
Albufeira (freguesia de Albufeira e Olhos de Água), Faro district, Algarve, Portugal. See it on the map, in 3D
Stage
Under construction, as of July 8, 2026 (Governo de Portugal). The environment minister laid the first stone of the plant under construction in Albufeira on 8 July 2026.
Status
Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
Research as of

Who, what, how much

FieldValueSource
OwnerÁguas do Algarve, S.A.
TypeWater
AmountNot found in the sources consulted
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

FieldValueScopeSource
Annual capacity16 million m3/yearinitial, expandable to 24Governo de Portugal
Daily capacity43,200 m3/dayfirst phase (500 l/s), expandable to 64,800 m3/dayAgência Portuguesa do Ambiente
Plot area13 haplant plot including the solar parkAgência Portuguesa do Ambiente
Solar park5.65 MWpon about 4.5 ha of the plotAgência Portuguesa do Ambiente
Intake distance2 km offshoretwo intake towers at 10 m ZHAgência Portuguesa do Ambiente
Brine outfall distance1.8 km offshorebrine dischargeAgência Portuguesa do Ambiente
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

AmountWhat it isScopeAs ofSource
€108 MContract valuedesign-build-operate contract; VAT not stated; 56 million from the PRROctober 2024Governo de Portugal
Amounts, each with its kind and scope

Companies and their roles

CompanyRoleNoteSource
Águas do Algarve, S.A.OwnerÁguas de Portugal groupAgência Portuguesa do Ambiente
AquaporGeneral contractorconsortium with GS InimaGoverno de Portugal
GS InimaGeneral contractorconsortium with AquaporGoverno de Portugal
Companies and public bodies named by a source, each with its role

Milestones

DateMilestoneSource
April 2024Favourable conditional environmental impact declaration (APA)Agência Portuguesa do Ambiente
October 22, 2024Contract signed with Aquapor and GS InimaGoverno de Portugal
July 8, 2026First stone laid by the environment ministerGoverno de Portugal
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

Águas do Algarve is building a seawater reverse-osmosis desalination plant in Albufeira, near Praia da Rocha Baixinha, to supply about a fifth of the Algarve's urban water. It will produce 16 million m3 a year at first, expandable to 24 million. A Portuguese-Spanish consortium of Aquapor and GS Inima won the design, build and operate contract for 107.92 million euros in October 2024; the first stone was laid on 8 July 2026.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.

Sources

See it on the map. How the map is made.