Algarve seawater desalination plant, Albufeira
- Location
- Albufeira (freguesia de Albufeira e Olhos de Água), Faro district, Algarve, Portugal. See it on the map, in 3D
- Stage
- Under construction, as of July 8, 2026 (Governo de Portugal). The environment minister laid the first stone of the plant under construction in Albufeira on 8 July 2026.
- Status
- Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Águas do Algarve, S.A. | |
| Type | Water | |
| Amount | Not found in the sources consulted |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Annual capacity | 16 million m3/year | initial, expandable to 24 | Governo de Portugal |
| Daily capacity | 43,200 m3/day | first phase (500 l/s), expandable to 64,800 m3/day | Agência Portuguesa do Ambiente |
| Plot area | 13 ha | plant plot including the solar park | Agência Portuguesa do Ambiente |
| Solar park | 5.65 MWp | on about 4.5 ha of the plot | Agência Portuguesa do Ambiente |
| Intake distance | 2 km offshore | two intake towers at 10 m ZH | Agência Portuguesa do Ambiente |
| Brine outfall distance | 1.8 km offshore | brine discharge | Agência Portuguesa do Ambiente |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €108 M | Contract value | design-build-operate contract; VAT not stated; 56 million from the PRR | October 2024 | Governo de Portugal |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Águas do Algarve, S.A. | Owner | Águas de Portugal group | Agência Portuguesa do Ambiente |
| Aquapor | General contractor | consortium with GS Inima | Governo de Portugal |
| GS Inima | General contractor | consortium with Aquapor | Governo de Portugal |
Milestones
| Date | Milestone | Source |
|---|---|---|
| April 2024 | Favourable conditional environmental impact declaration (APA) | Agência Portuguesa do Ambiente |
| October 22, 2024 | Contract signed with Aquapor and GS Inima | Governo de Portugal |
| July 8, 2026 | First stone laid by the environment minister | Governo de Portugal |
About the project
Águas do Algarve is building a seawater reverse-osmosis desalination plant in Albufeira, near Praia da Rocha Baixinha, to supply about a fifth of the Algarve's urban water. It will produce 16 million m3 a year at first, expandable to 24 million. A Portuguese-Spanish consortium of Aquapor and GS Inima won the design, build and operate contract for 107.92 million euros in October 2024; the first stone was laid on 8 July 2026.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Lançada primeira pedra da dessalinizadora do Algarve, Governo de Portugal (government), 9 Jul 2026. Consulted 26 Nov 2026.
- Adjudicada dessalinizadora de água do mar do Algarve, Governo de Portugal (government), 22 Oct 2024. Consulted 26 Nov 2026.
- Parecer da Comissão de Avaliação, AIA n.º 3667: Estação de Dessalinização de Água do Mar do Algarve (estudo prévio), Agência Portuguesa do Ambiente (state news agency (map)), Apr 2024. Consulted 26 Nov 2026.