Madrid A-5 undergrounding, Lot 1: Padre Piquer to Batán
- Location
- Madrid (Latina district), Community of Madrid, Spain. See it on the map, in 3D
- Stage
- Under construction, as of May 31, 2026 (Madrid Informa). The city reported both tunnel tubes fully excavated by May 2026, with installations under way.
- Status
- Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Ayuntamiento de Madrid | |
| Type | Highways | |
| Headline amount | EUR 175.9 million (EUR), as of February 1, 2024 | elDiario.es (Somos Madrid) |
| What it covers | Budget. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Length | 1.72 km | lot, PK 0+780 to 2+500 (computed from the PKs) | Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) |
| Lanes | 3 lanes each way | tunnel | elDiario.es (Somos Madrid) |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €124 M | Contract value | Lot 1 award, appears excl. VAT | August 22, 2024 | Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) |
| €145 M | Budget | Lot 1 tender budget excl. VAT | February 2024 | Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) |
| €176 M | Budget | Lot 1 tender budget as reported by press (incl. VAT: 145.38M x 1.21) | February 1, 2024 | elDiario.es (Somos Madrid) |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Ayuntamiento de Madrid | Owner | Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) | |
| FCC Construcción | Contractor, one lot | Lot 1, UTE with Ferrovial; shares not stated | Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) |
| Ferrovial Construcción | Contractor, one lot | Lot 1, UTE with FCC; shares not stated | Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) |
Milestones
| Date | Milestone | Source |
|---|---|---|
| August 22, 2024 | Lot 1 awarded | Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) |
| October 27, 2026 (planned) | Contract end date | Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) |
| December 2026 (planned) | Tunnel open to traffic | Madrid Informa |
About the project
The western lot of Madrid's A-5 undergrounding runs from the Padre Piquer junction to Batán, about 1.7 km, and includes a new roundabout on Avenida de los Poblados. FCC Construcción and Ferrovial Construcción won it in August 2024 for EUR 123.86 million. Excavation was complete by May 2026 and the city plans to open the tunnel at the end of 2026.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Ejecución del Paseo Verde del Suroeste, Lote 1, Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid) (government), 22 Aug 2024. Consulted 26 Nov 2026.
- Luz verde a las obras para soterrar la A-5, elDiario.es (Somos Madrid) (press), 1 Feb 2024. Consulted 26 Nov 2026.
- Madrid termina la excavación del túnel de la A-5, Madrid Informa (press), 31 May 2026. Consulted 26 Nov 2026.