Reviewed record

Madrid A-5 undergrounding, Lot 1: Padre Piquer to Batán

Location
Madrid (Latina district), Community of Madrid, Spain. See it on the map, in 3D
Stage
Under construction, as of May 31, 2026 (Madrid Informa). The city reported both tunnel tubes fully excavated by May 2026, with installations under way.
Status
Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
Research as of

Who, what, how much

FieldValueSource
OwnerAyuntamiento de Madrid
TypeHighways
Headline amountEUR 175.9 million (EUR), as of February 1, 2024elDiario.es (Somos Madrid)
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

FieldValueScopeSource
Length1.72 kmlot, PK 0+780 to 2+500 (computed from the PKs)Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid)
Lanes3 lanes each waytunnelelDiario.es (Somos Madrid)
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

AmountWhat it isScopeAs ofSource
€124 MContract valueLot 1 award, appears excl. VATAugust 22, 2024Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid)
€145 MBudgetLot 1 tender budget excl. VATFebruary 2024Gobierto Contratos (PLACSP data, Ayuntamiento de Madrid)
€176 MBudgetLot 1 tender budget as reported by press (incl. VAT: 145.38M x 1.21)February 1, 2024elDiario.es (Somos Madrid)
Amounts, each with its kind and scope

Companies and their roles

CompanyRoleNoteSource
Ayuntamiento de MadridOwnerGobierto Contratos (PLACSP data, Ayuntamiento de Madrid)
FCC ConstrucciónContractor, one lotLot 1, UTE with Ferrovial; shares not statedGobierto Contratos (PLACSP data, Ayuntamiento de Madrid)
Ferrovial ConstrucciónContractor, one lotLot 1, UTE with FCC; shares not statedGobierto Contratos (PLACSP data, Ayuntamiento de Madrid)
Companies and public bodies named by a source, each with its role

Milestones

DateMilestoneSource
August 22, 2024Lot 1 awardedGobierto Contratos (PLACSP data, Ayuntamiento de Madrid)
October 27, 2026 (planned)Contract end dateGobierto Contratos (PLACSP data, Ayuntamiento de Madrid)
December 2026 (planned)Tunnel open to trafficMadrid Informa
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

The western lot of Madrid's A-5 undergrounding runs from the Padre Piquer junction to Batán, about 1.7 km, and includes a new roundabout on Avenida de los Poblados. FCC Construcción and Ferrovial Construcción won it in August 2024 for EUR 123.86 million. Excavation was complete by May 2026 and the city plans to open the tunnel at the end of 2026.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.

Sources

See it on the map. How the map is made.