Reviewed record

Madrid Metro Line 5 extension: Alameda de Osuna to Airport T1-T2-T3

Location
Madrid (Barajas district: Alameda de Osuna, Madrid-Barajas airport), Community of Madrid, Spain. See it on the map, in 3D
Stage
Under construction, as of May 19, 2025 (El Debate). The Comunidad de Madrid started the works on 19 May 2025, after the contract was formalised on 11 April 2025; completion is planned in 2028.
Status
Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
Research as of

Who, what, how much

FieldValueSource
OwnerComunidad de Madrid, Dirección General de Infraestructuras de Transporte Colectivo
TypeUrban transit
Headline amountEUR 189.2 million (EUR), as of May 19, 2025Comunidad de Madrid
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

FieldValueScopeSource
Track length3,922.714 mnew trackComunidad de Madrid
Length1.7 kmroute lengthEl Debate
Turnback tracks4 tracks of 210 mnew yard for eight trainsEl Debate
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

AmountWhat it isScopeAs ofSource
€181 MContract valueworks award as reported, VAT not statedDecember 4, 2024El Debate
€189 MBudgetaward budget of the works contract and two complementary service contracts, incl. VATMay 19, 2025Comunidad de Madrid
€15 MInvestment programmeAena maximum contributionMay 19, 2025Comunidad de Madrid
Amounts, each with its kind and scope

Companies and their roles

CompanyRoleNoteSource
Comunidad de Madrid, Dirección General de Infraestructuras de Transporte ColectivoOwnerComunidad de Madrid
FCC Construcción, Sacyr Construcción and Becsa (Grupo Simetría), UTE Aeropuerto L5General contractorshares not found; 36-month termEl Debate
AenaLenderco-funder, up to 15 million eurosComunidad de Madrid
European Union, FEDER 2021-2027 programme of the Comunidad de MadridLenderEU co-financing rate 40%Comunidad de Madrid
Companies and public bodies named by a source, each with its role

Milestones

DateMilestoneSource
December 4, 2024Works awarded to FCC, Sacyr and BecsaEl Debate
May 19, 2025Start of worksEl Debate
2028 (planned)End of worksComunidad de Madrid
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

Line 5 of the Madrid Metro is being extended from Alameda de Osuna to the airport's T1-T2-T3 station, where it will connect with Line 8 and let riders cross the city from Carabanchel to the airport without changing. The route is about 1.7 km in tunnel under the M-11 and M-14. FCC, Sacyr and Becsa won the works for 181 million euros; the Comunidad de Madrid started works in May 2025 and plans to finish in 2028. Aena contributes up to 15 million euros.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.