Camp de Tarragona tram, phase 1: Cambrils Centre to Vila-seca (main works)
- Location
- Cambrils, Vinyols i els Arcs, Salou and Vila-seca, Tarragona, Catalonia, Spain. See it on the map, in 3D
- Stage
- Contract awarded, works not confirmed, as of April 2, 2026 (Diari de Tarragona). The main works contract was awarded in March 2026; earthworks and service diversions under an earlier contract had reached Salou by April 2026, and the main works were due to start in summer 2026 for about two years.
- Status
- Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owners | Infraestructures de la Generalitat de Catalunya, Ferrocarrils de la Generalitat de Catalunya (FGC) | |
| Type | Urban transit | |
| Headline amount | EUR 112.3 million (EUR), as of March 12, 2026 | Diari de Tarragona |
| What it covers | Contract value, main works lot (track, catenary, 11 stops, 5 substations), excl. VAT. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Length | 12 km | main works contract, double track, Cambrils Centre to Vila-seca Estació | Diari de Tarragona |
| Stops | 11 stops | main works contract, 40 m platforms | Diari de Tarragona |
| Length | 14 km | whole first phase, 14 stops, 3 interchanges | Diari Més |
| Substations | 5 substations | main works contract | Diari de Tarragona |
| Trams | 7 trams | rolling stock, 210 passengers each, catenary and battery | Generalitat de Catalunya, Departament de Territori |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €112 M | Contract value | main works lot (track, catenary, 11 stops, 5 substations), excl. VAT | March 12, 2026 | Diari de Tarragona |
| €136 M | Contract value | same, incl. VAT | March 12, 2026 | Diari de Tarragona |
| €224 M | Investment programme | investment mobilised for the whole first phase | March 2026 | Diari Més |
| €245 M | Investment programme | first phase (2024 presentation): civil works 179.8M, trams 38.5M, urbanisation and civic axis 26.6M | January 19, 2024 | Generalitat de Catalunya, Departament de Territori |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Infraestructures de la Generalitat de Catalunya | Owner | contracting body; Generalitat de Catalunya, Departament de Territori | Diari de Tarragona |
| Ferrocarrils de la Generalitat de Catalunya (FGC) | Owner | operator; 7 trams | Generalitat de Catalunya, Departament de Territori |
| COMSA, FCC Construcción, Syneox Rail and Garcia Riera (UTE) | General contractor | main works; shares not found | Diari de Tarragona |
Milestones
| Date | Milestone | Source |
|---|---|---|
| January 19, 2024 | First phase presented in Cambrils | Generalitat de Catalunya, Departament de Territori |
| October 2025 | Preliminary works begin in Cambrils (about six months before April 2026) | Diari de Tarragona |
| March 2026 | Main works awarded to COMSA, FCC, Syneox Rail, Garcia Riera | Diari de Tarragona |
| June 2026 (planned) | Main works to start in summer 2026, about 25 months | Diari de Tarragona |
| December 2029 (planned) | End of first phase | Diari Més |
About the project
The Camp de Tarragona tram is a new double-track tramway that will link Cambrils, Salou and Vila-seca, mostly on the corridor of the former coastal railway. In March 2026 Infraestructures.cat awarded the main works, about 12 km with 11 stops and five substations, to a joint venture of COMSA, FCC Construcción, Syneox Rail and Garcia Riera for 112.3 million euros before VAT. Earlier contracts are already preparing the ground. FGC will operate the line, whose first phase is due by the end of 2029.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Comsa, FCC y Garcia Riera harán las obras del tranvía del Camp de Tarragona por 135 millones, Diari de Tarragona (press), 12 Mar 2026. Consulted 26 Nov 2026.
- Las obras del tranvía llegan a Salou y acaban con los últimos rastros de la vía del tren, Diari de Tarragona (press), 2 Apr 2026. Consulted 26 Nov 2026.
- La primera fase del tramvia del Camp de Tarragona s'enllestirà a finals de 2029, Diari Més (press), Mar 2026. Consulted 26 Nov 2026.
- El tramvia del Camp de Tarragona es posa en marxa (presentació, Cambrils), Generalitat de Catalunya, Departament de Territori (owner), 19 Jan 2024. Consulted 26 Nov 2026.
- Aprovada la primera fase del pla urbanístic del tramvia del Camp de Tarragona, Ara (Camp de Tarragona) (press). Consulted 26 Nov 2026.