Port of Barcelona: liquid-bulk berths 34C, 34D and 34E on the Moll de l'Energia

Location
Barcelona, Catalonia, Spain. See it on the map, in 3D
Stage
Contract awarded, works not confirmed, as of May 27, 2026 (Port de Barcelona). The Port of Barcelona board awarded the works to FCC and COMSA on 27 May 2026; no start of works was found.
Status
Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
Research as of

Who, what, how much

FieldValueSource
OwnerAutoritat Portuària de Barcelona
TypePorts
Headline amountEUR 124 million (EUR), as of December 3, 2025Diario El Canal
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

FieldValueScopeSource
Berths3 berths34C, 34D, 34EPort de Barcelona
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

AmountWhat it isScopeAs ofSource
€112 MContract valueworks contract, excl. VATMay 27, 2026Port de Barcelona
€124 MBudgettender budget, VAT not statedDecember 3, 2025Diario El Canal
Amounts, each with its kind and scope

Companies and their roles

CompanyRoleNoteSource
Autoritat Portuària de BarcelonaOwnerPort de Barcelona
FCC Construcción S.A.General contractorUTE with COMSA; shares not publishedPort de Barcelona
COMSA S.A.U.General contractorUTE with FCCPort de Barcelona
Companies and public bodies named by a source, each with its role

Milestones

DateMilestoneSource
December 3, 2025Six bids receivedDiario El Canal
May 12, 2026FCC-COMSA offer ranked best, 111.5 million euros excl. VATDiario El Canal
May 27, 2026Award by the Port boardPort de Barcelona
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

The Port of Barcelona is adding three berths for liquid bulk ships on the east face of the Moll de l'Energia, similar to the existing berth 34B. FCC Construcción and COMSA won the contract in May 2026, for 111.5 million euros excluding VAT and 3 years and 2 months of works. The berths are meant mainly for sustainable fuels such as ammonia and methanol.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.