Reviewed record

A-11 Autovía del Duero: Quintanilla de Arriba (west) to Olivares de Duero

Location
Quintanilla de Arriba, Valbuena de Duero and Olivares de Duero, Valladolid, Castile and León, Spain. See it on the map, in 3D
Stage
Partly in service, partly under construction, as of August 24, 2026 (elDiario.es Castilla y León). The Minister opened the stretch from the San Bernardo junction to Olivares on 24 August 2026; the Duero viaduct and works towards Quintanilla de Arriba continue, with completion forecast for the first half of 2027.
Status
Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
Research as of

Who, what, how much

FieldValueSource
OwnerMinisterio de Transportes y Movilidad Sostenible, Dirección General de Carreteras
TypeHighways
Headline amountEUR 233 million (EUR), as of August 2026El Día de Valladolid
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

FieldValueScopeSource
Length14.5 kmsectionelDiario.es Castilla y León
Viaduct length500 mviaduct over the Duero at Quintanilla de ArribaEl Día de Valladolid
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

AmountWhat it isScopeAs ofSource
€81 MContract valueselected offer (BOE), excl. VAT; 97.99M incl. VATJuly 31, 2020Boletín Oficial del Estado
€112 MBudgetestimated tender value, excl. VATJuly 23, 2019Boletín Oficial del Estado
€233 MBudgettotal of the two sections Tudela-Olivares and Olivares-QuintanillaAugust 2026El Día de Valladolid
Amounts, each with its kind and scope

Companies and their roles

CompanyRoleNoteSource
Ministerio de Transportes y Movilidad Sostenible, Dirección General de CarreterasOwnerBoletín Oficial del Estado
UTE A11 Quintanilla-OlivaresGeneral contractorMember companies not named in sources read; 20 bidsBoletín Oficial del Estado
Companies and public bodies named by a source, each with its role

Milestones

DateMilestoneSource
July 31, 2020Works awardedBoletín Oficial del Estado
October 28, 2020Works beginDiario de Valladolid
August 24, 2026San Bernardo-Olivares stretch openselDiario.es Castilla y León
June 2027 (planned)Whole Quintanilla-Tudela open (first half 2027)elDiario.es Castilla y León
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

This 14.5 km section of the A-11 runs through the Ribera del Duero between Quintanilla de Arriba and Olivares de Duero, including a viaduct of about 500 m over the Duero. It was awarded in July 2020 to the UTE A11 Quintanilla-Olivares for EUR 80.98 million excluding VAT and started in October 2020. The part from the San Bernardo junction opened in August 2026; the Ministry expects to finish the viaduct and the rest in the first half of 2027.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.

Sources

See it on the map. How the map is made.