Reviewed record

Burgos-Vitoria high-speed line: Pancorbo-Ameyugo section

Location
Pancorbo and Ameyugo, Burgos, Castile and León, Spain. See it on the map, in 3D
Stage
Under construction, as of September 2026 (BURGOSconecta). In September 2026 both portals of the Ameyugo II tunnel and the south portal of the Pancorbo tunnel were open, and work had started on one of the viaducts.
Status
Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
Research as of

Who, what, how much

FieldValueSource
OwnerAdif Alta Velocidad
TypeRail
Headline amountEUR 363 million (EUR), as of February 2025BOE
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

FieldValueScopeSource
Length8.4 kmsectionEl Español
Share in tunnel and viaduct77 %sectionEl Español
Underground length5.2 kmsectionBURGOSconecta
Track gauge1,435 mmdouble trackelDiario.es
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

AmountWhat it isScopeAs ofSource
€363 MBudgettender estimated value, 52 monthsFebruary 2025BOE
€391 MContract valueaward incl. VAT; tender budget EUR 439.2M incl. VATJuly 2025El Español
Amounts, each with its kind and scope

Companies and their roles

CompanyRoleNoteSource
Adif Alta VelocidadOwnerBOE
FerrovialGeneral contractorUTE memberEl Español
FCC ConstrucciónGeneral contractorUTE memberEl Español
Contratas y Ventas (Convensa)General contractorUTE memberEl Español
Companies and public bodies named by a source, each with its role

Milestones

DateMilestoneSource
February 26, 2025Works tender published in the BOEBOE
July 17, 2025Works awarded to the Ferrovial, FCC and Convensa joint ventureEl Español
September 17, 2026Ameyugo II portals and Pancorbo tunnel south portal opened, first viaduct startedBURGOSconecta
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

The first section under construction on the Burgos-Vitoria high-speed line: 8.4 km of double-track standard gauge platform between Pancorbo and Ameyugo, 77% of it in tunnels and viaducts, including the 4 km Pancorbo tunnel through the Montes Obarenes and a 1.1 km viaduct over the N-I. A joint venture of Ferrovial, FCC and Convensa won it in July 2025 for EUR 390.9 million including VAT, over 52 months. In September 2026 the tunnel portals were being opened.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.