Reviewed record
A-11 Autovía del Duero: Langa de Duero bypass to Aranda de Duero bypass
- Location
- Langa de Duero (Soria), Zuzones, La Vid, Vadocondes, Fresnillo de las Dueñas and Aranda de Duero (Burgos), Castile and León, Spain. See it on the map, in 3D
- Stage
- Under construction, as of April 10, 2025 (Interempresas). OHLA announced the start of works on the 22 km section in April 2025, with a 37-month term.
- Status
- Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | |
| Type | Highways | |
| Headline amount | EUR 212 million (EUR), as of December 18, 2023 | La Moncloa (Ministerio de Transportes) |
| What it covers | Budget. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
| Field | Value | Scope | Source |
|---|---|---|---|
| Length | 22.25 km | main carriageway PK 10+000 to 32+249.34 | Interempresas |
| Lanes | 2 lanes each way | 3.5 m lanes | Interempresas |
| Junctions | 4 junctions | section | La Moncloa (Ministerio de Transportes) |
| Viaducts | 2 twin viaducts | section | Interempresas |
| Overpasses | 6 overpasses | section | Interempresas |
| Underpasses | 24 underpasses | section | Interempresas |
| Earthworks | 4.8 million m3 | excavation | Interempresas |
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €149 M | Contract value | value of the selected offer (BOE), excl. VAT | November 27, 2024 | Boletín Oficial del Estado |
| €212 M | Budget | construction budget at project approval, excl. VAT | December 18, 2023 | La Moncloa (Ministerio de Transportes) |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Owner | Boletín Oficial del Estado | |
| Obrascón Huarte Lain (OHLA) and Asch Infraestructuras y Servicios (UTE) | General contractor | Shares not stated; 14 bids | Boletín Oficial del Estado |
| GPYO Innova, Ayesa and Trechobs (UTE) | Supervision | Control and surveillance of the works, EUR 3,955,302.04, awarded 2024-11-27 | Boletín Oficial del Estado |
Milestones
| Date | Milestone | Source |
|---|---|---|
| December 1, 2023 | Construction project approved | La Moncloa (Ministerio de Transportes) |
| November 27, 2024 | Works awarded to OHLA-Asch | Boletín Oficial del Estado |
| April 10, 2025 | OHLA announces start of works (37-month term) | Interempresas |
About the project
The Ministry of Transport is building 22.25 km of the A-11 Autovía del Duero between the Langa de Duero bypass in Soria and the Aranda de Duero bypass at Fresnillo de las Dueñas, Burgos, with two lanes per direction and four junctions. OHLA and Asch Infraestructuras won the contract in November 2024 for EUR 149.4 million and began works in April 2025. The works include two twin viaducts and 4.8 million m3 of earthworks.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Formalización: Autovía del Duero, A-11. Tramo Variante de Langa de Duero-Variante de Aranda de Duero (BOE-B-2025-241), Boletín Oficial del Estado (government), 4 Jan 2025. Consulted 26 Nov 2026.
- Puente: autorización de la licitación del tramo de la A-11 Langa de Duero-Aranda de Duero, La Moncloa (Ministerio de Transportes) (government), 18 Dec 2023. Consulted 26 Nov 2026.
- OHLA impulsa la modernización de la Autovía del Duero con un nuevo tramo de 22 km, Interempresas (press), 10 Apr 2025. Consulted 26 Nov 2026.
- Formalización: control y vigilancia de las obras A-11 Langa de Duero-Aranda de Duero (BOE-B-2025-3911), Boletín Oficial del Estado (government), 5 Feb 2025. Consulted 26 Nov 2026.