Reviewed record
A-23 Autovía Mudéjar completion: Lanave to Embalse de Jabarrella to Sabiñánigo Sur
- Location
- Caldearenas and Sabiñánigo, Huesca (Gállego valley, Jabarrella reservoir), Aragon, Spain. See it on the map, in 3D
- Stage
- Under construction, as of July 15, 2026 (Boletín Oficial del Estado). The contract was formalised on 31 July 2024 with a 59-month term; in July 2026 the Ministry put Modification No.1 of the works to public information.
- Status
- Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
- Research as of
Who, what, how much
| Field | Value | Source |
|---|---|---|
| Owner | Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | |
| Type | Highways | |
| Headline amount | EUR 14.4 million (EUR), as of October 9, 2025 | Boletín Oficial del Estado |
| What it covers | Budget. |
The works in figures
Each figure as its source states it, with its scope. Where two sources disagree, both are listed.
Cost, contracts and financing
A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| €102 M | Contract value | award incl. VAT | June 25, 2024 | Boletín Oficial del Estado |
| €85 M | Contract value | selected offer (BOE), excl. VAT | June 25, 2024 | Boletín Oficial del Estado |
| €14 M | Budget | Modification No.1 estimated addition, incl. 21% VAT (14.07% of execution budget) | October 9, 2025 | Boletín Oficial del Estado |
Companies and their roles
| Company | Role | Note | Source |
|---|---|---|---|
| Ministerio de Transportes y Movilidad Sostenible, Dirección General de Carreteras | Owner | Boletín Oficial del Estado | |
| Sacyr Construcción, S.A. | General contractor | 13 bids | Boletín Oficial del Estado |
| Intecsa-Inarsa and SERS Consultores en Ingeniería y Arquitectura (UTE) | Supervision | Control and surveillance of the works; also drafted Modification No.1 route project (Feb 2026) | Boletín Oficial del Estado |
Milestones
| Date | Milestone | Source |
|---|---|---|
| June 25, 2024 | Works awarded to Sacyr | Boletín Oficial del Estado |
| July 31, 2024 | Contract formalised (59 months) | Boletín Oficial del Estado |
| October 9, 2025 | Drafting of Modification No.1 authorised | Boletín Oficial del Estado |
| July 7, 2026 | Modification No.1 route project provisionally approved | Boletín Oficial del Estado |
About the project
Sacyr is building the last 8.5 km of the A-23 Autovía Mudéjar between Lanave and Sabiñánigo Sur, along the Gállego river and the Jabarrella reservoir in Huesca. The works include five viaducts, the longest 270 m over the Gállego, the Ipiés junction and the Sabiñánigo Sur half-junction. The contract, EUR 102.4 million including VAT, was signed in July 2024 for 59 months, and a first modification adding about EUR 14.4 million was in public information in July 2026.
The site in 3D
The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.
Sources
- Formalización: Proyecto de terminación Autovía A-23, Lanave-Embalse de Jabarrella-Sabiñánigo Sur (BOE-B-2024-28413), Boletín Oficial del Estado (government), 6 Aug 2024. Consulted 26 Nov 2026.
- Sacyr, selected to build a section of the A-23 highway in Huesca for €102 million, Sacyr (company), 7 Aug 2024. Consulted 26 Nov 2026.
- Aprobación provisional del Proyecto de Trazado de la Modificación Nº 1, A-23 Lanave-Embalse de Jabarrella-Sabiñánigo Sur (BOE-B-2026-24221), Boletín Oficial del Estado (government), 15 Jul 2026. Consulted 26 Nov 2026.