A-23 Autovía Mudéjar completion: Lanave to Embalse de Jabarrella to Sabiñánigo Sur

Location
Caldearenas and Sabiñánigo, Huesca (Gállego valley, Jabarrella reservoir), Aragon, Spain. See it on the map, in 3D
Stage
Under construction, as of July 15, 2026 (Boletín Oficial del Estado). The contract was formalised on 31 July 2024 with a 59-month term; in July 2026 the Ministry put Modification No.1 of the works to public information.
Status
Reviewed record: compiled from the sources below (the owners, the procurement records and gazettes, the companies, the funders and the press), each fact checked against its source on 26 Nov 2026, the record reviewed on 27 Nov 2026.
Research as of

Who, what, how much

FieldValueSource
OwnerMinisterio de Transportes y Movilidad Sostenible, Dirección General de Carreteras
TypeHighways
Headline amountEUR 14.4 million (EUR), as of October 9, 2025Boletín Oficial del Estado
What it coversBudget.
Sourced facts of the project

The works in figures

Each figure as its source states it, with its scope. Where two sources disagree, both are listed.

FieldValueScopeSource
Length8.5 kmsectionSacyr
Structures11 structuresof which five viaductsSacyr
Underpasses4 underpassessectionSacyr
Overpasses2 overpassessectionSacyr
Physical figures, as their sources describe them

Cost, contracts and financing

A total project cost, a budget, one contract, a loan and a national programme are different objects: each is listed with what it covers, in the currency its source gives, never converted or added to another.

AmountWhat it isScopeAs ofSource
€102 MContract valueaward incl. VATJune 25, 2024Boletín Oficial del Estado
€85 MContract valueselected offer (BOE), excl. VATJune 25, 2024Boletín Oficial del Estado
€14 MBudgetModification No.1 estimated addition, incl. 21% VAT (14.07% of execution budget)October 9, 2025Boletín Oficial del Estado
Amounts, each with its kind and scope

Companies and their roles

CompanyRoleNoteSource
Ministerio de Transportes y Movilidad Sostenible, Dirección General de CarreterasOwnerBoletín Oficial del Estado
Sacyr Construcción, S.A.General contractor13 bidsBoletín Oficial del Estado
Intecsa-Inarsa and SERS Consultores en Ingeniería y Arquitectura (UTE)SupervisionControl and surveillance of the works; also drafted Modification No.1 route project (Feb 2026)Boletín Oficial del Estado
Companies and public bodies named by a source, each with its role

Milestones

DateMilestoneSource
June 25, 2024Works awarded to SacyrBoletín Oficial del Estado
July 31, 2024Contract formalised (59 months)Boletín Oficial del Estado
October 9, 2025Drafting of Modification No.1 authorisedBoletín Oficial del Estado
July 7, 2026Modification No.1 route project provisionally approvedBoletín Oficial del Estado
Dated milestones, at the precision of their source; a planned date is marked as such

About the project

Sacyr is building the last 8.5 km of the A-23 Autovía Mudéjar between Lanave and Sabiñánigo Sur, along the Gállego river and the Jabarrella reservoir in Huesca. The works include five viaducts, the longest 270 m over the Gállego, the Ipiés junction and the Sabiñánigo Sur half-junction. The contract, EUR 102.4 million including VAT, was signed in July 2024 for 59 months, and a first modification adding about EUR 14.4 million was in public information in July 2026.

The site in 3D

The site's 3D model is drawn to scale from OpenStreetMap: the works as mapped and the land, roads, water and buildings around them, with the structure drawn from its published figures and those figures on its card, each with its source. What no map or source gives is drawn as typical and listed under the model as illustrative. Open the site in 3D.